A development permit shall be obtained before construction or development begins within any area of special flood hazard established in § 125-6. Application for a development permit shall be made on forms furnished by the Town Clerk and may include, but not be limited to, plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, fill, storage of materials, drainage facilities; and the location of the foregoing.
The enforcement officer is hereby appointed to administer and implement this chapter by granting or denying development permit applications in accordance with its provisions.
Duties of the enforcement officer shall include, but not be limited to:
A. 
Permit review.
(1) 
Review all development permits to determine that the permit requirements of this chapter have been satisfied.
(2) 
Review all development permits to determine that all necessary permits have been obtained from those federal, state or local governmental agencies from which prior approval is required.
(3) 
Review all development permits to determine if the proposed development adversely affects the flood-carrying capacity of the area of special flood hazard. For the purposes of this chapter, "adversely affects" means damage to adjacent properties because of rises in flood stages attributed to physical changes of the channel and the adjacent overbank areas.
(a) 
If it is determined that there is no adverse effect, then the permit shall be granted consistent with the provisions of this chapter.
(b) 
If it is determined that there is an adverse effect, then flood damage mitigation measures shall be made a condition of the permit.
B. 
Use of other base flood data. When base flood elevation data has not been provided in accordance with § 125-6, the enforcement officer shall obtain, review and reasonably utilize any base flood elevation data available from a federal, state or other source, in order to administer § 125-14, Specific standards.
C. 
Information to be obtained and maintained.
(1) 
Obtain and record the actual elevation (in relation to mean sea level) of the lowest floor (including basement or cellar) of all new or substantially improved structures, and whether or not the structure contains a basement or cellar.
(2) 
For all new or substantially improved floodproofed structures:
(a) 
Obtain and record the actual elevation (in relation to mean sea level) to which the structure has been floodproofed.
(b) 
Maintain the floodproofing certifications required in § 125-14B(3).
(3) 
Maintain for public inspection all records pertaining to the provisions of this chapter.
D. 
Alteration of watercourses.
(1) 
Notify adjacent communities and the New York State Department of Environmental Conservation prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Insurance Administration.
(2) 
Require that maintenance is provided within the altered or relocated portion of said watercourse so that the flood-carrying capacity is not diminished.
E. 
Interpretation of FIRM boundaries.
(1) 
The local administrator shall have the authority to make interpretations when there appears to be a conflict between the limits of the federally identified area of special flood hazard and actual field conditions.
(2) 
Base flood elevation data established pursuant to § 125-6 and/or Subsection B of this section, when available, shall be used to accurately delineate the area of special flood hazards.
(3) 
The local administrator shall use flood information from any other authoritative source, including historical data, to establish the limits of the area of special flood hazards when base flood elevations are not available.
F. 
Stop-work orders.
(1) 
All floodplain development found ongoing without an approved permit shall be subject to the issuance of a stop-work order by the local administrator. Disregard of a stop-work order shall be subject to the penalties described in § 125-8 of this chapter.
(2) 
All floodplain development found noncompliant with the provisions of this chapter and/or the conditions of the approved permit shall be subject to the issuance of a stop-work order by the local administrator. Disregard of a stop-work order shall be subject to the penalties described in § 125-8 of this chapter.
G. 
Inspections. The local administrator and/or the developer's engineer or architect shall make periodic inspections at appropriate times throughout the period of construction in order to monitor compliance with permit conditions and enable said inspector to certify that the development is in compliance with the requirements of either the development permit or the approved variance.
H. 
Certificate of compliance.
(1) 
It shall be unlawful to use or occupy or to permit the use or occupancy of any building or premises, or both, or any part thereof hereafter created, erected, changed, converted or wholly or partly altered or enlarged in its use or structure, until a certificate of compliance has been issued by the local administrator stating that the building or land conforms to the requirements of this chapter.
(2) 
All other development occurring within the designated flood hazard area will have, upon completion, a certificate of compliance issued by the local administrator.
(3) 
All certifications shall be based upon the inspections conducted subject to Subsection G of this section and/or any certified elevations, hydraulic information, floodproofing, anchoring requirements or encroachment analysis which may have been required as a condition of the approved permit.