Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Richland, PA
Allegheny County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Ord. 430, 7/16/2008; as amended by Ord. 438, 8/19/2009]
A. 
A schedule of fees for building permits, occupancy permits, sign permits, landscape plan material maintenance, transportation impact fees, and applications for petitions to amend this chapter, or to initiate action on conditional uses before the Planning Commission or on special exception, or variances or challenges to a decision of the Zoning Officer before the Zoning Hearing Board shall be established by resolution of the Board of Supervisors, posted conspicuously in the Township Building, and subsequently amended only by action of the Board of Supervisors.
B. 
No permit, certificate, application or variance shall be issued unless or until such costs, charges, fees or expenses listed below have been paid in full, nor shall any action be taken on proceedings before the Zoning Hearing Board unless or until preliminary charges and fees have been paid in full.
C. 
A building permit shall be required for all new construction, additions or alterations or any structural or interior changes required for a change of the structure's use.
D. 
No building permit shall be required for the following:
(1) 
Interior or exterior painting.
(2) 
Wall covering or siding.
(3) 
Replacement of existing doors, windows, storm doors or screens without structural changes.
(4) 
Replacement of existing roofing.
(5) 
Repair or replacement of existing soffits or gutters.
(6) 
Repair or repointing of existing masonry.