[HISTORY: Adopted by the Mayor and Council of the Borough
of Palisades Park 1-15-2013 by Ord. No. 1592. Amendments noted where
applicable.]
A.
Regardless of whether generators are to be serviced by natural gas,
diesel, propane or gasoline, application must be made to the Building
Department on forms provided by the Borough.
B.
Two copies of a property survey shall be provided, showing the proposed
location and size, in dimensions, of the generator.
C.
Generators may be located in the rear yards only.
D.
If the premises is a condominium, a letter of approval from the condominium
association granting approval shall be required prior to issuance
of a permit.
A.
A copy of the manufacturer's specifications shall be provided,
to include the size of the generator and with all required clearances
to building structures, trees, shrubs, roof overhangs, doors, windows,
wall air conditioners and wall openings and vents.
B.
A concrete pad or impervious concrete paving stone for placement
of the generator shall be provided. The pad dimension shall be a minimum
of six inches larger than the generator unit on all sides or according
to the generator manufacturer's specifications, whichever requirement
is more stringent.
A.
Installation of a generator must comply with NEC Article 702.
B.
Load calculations of all loads connected to the generator shall be
provided in accordance with NEC Article 220.
C.
Two copies of a wiring diagram shall be provided, showing the generator,
transfer switch and service panel, complete with grounding.
D.
One copy of the generator and transfer switch specifications shall
be provided.
E.
If the generator has an automatic transfer switch, it must be equipped
with load management.
F.
Portable generators require a permit for the male receptacles, transfer
switch or interlock on the existing panel. The interlock must be listed
and labeled by a recognized testing lab. (A cut sheet shall be provided
for the interlock.)
G.
The size of the generator in kilowatts, size of the transfer switch
in amps and size of the subpanel in amps shall be shown.
H.
The contractor must be present at final inspection with a complete
start-up checklist.
If the generator is to be fueled by diesel or propane, a separate
fire permit is also required from the Chief of the Fire Department.