Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Southington, CT
Hartford County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
No person other than a contractor licensed under this chapter shall be issued a permit to construct or repair a sidewalk within the public rights-of-way, except nothing in this article shall prohibit a property owner from making minor or temporary repairs.
After obtaining a permit pursuant to this article and before commencing operations, specifications shall be obtained from the Town Engineer, and all work must be performed in strict conformity to these specifications, which shall set forth the location, type of materials, width and thickness of the sidewalk and method of construction.
After obtaining a permit pursuant to this article and before commencing operations in the public right-of-way, a grade line shall be obtained from or approved by the Town Engineer.
All phases of the work involved in the construction or repair of sidewalks shall be subject to the inspection and supervision of the Town Engineer. Each state of the construction must be inspected before the next stage is started.
Any maintenance and permanent replacement of sidewalks and curbs, if applicable, shall be subject to the requirements as set forth in Article III of this chapter.