Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Southington, CT
Hartford County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Adopted 6-23-2003; amended in its entirety 8-9-2010 (Ch. 2, Art. I, § 2-5, of the 1989 Code)]
The Town Council for the Town of Southington is hereby establishing this article under the provision of C.G.S. § 7-148v to develop a procedure to be used by all boards, departments and the Board of Education for the Town of Southington for qualification of bidders under certain criteria.
[Amended 10-9-2012]
It shall be required by all boards, departments and the Board of Education of the Town of Southington that when it is determined that a new project requires specific criteria primarily influenced by past experiences in similar and related projects all bidders must be qualified.
If a department head or a board concludes that a project falls under § 118-2, a written notification shall be sent to the Town Manager, Town Engineer and Chairman of the Public Works Committee and, if a sewer project, to the Chairman of the Sewer Committee.
The Town Engineer or his designee, in consultation with the Town Attorney, the Town Manager, the Town Council and the department head most closely associated with the project, shall establish the criteria and requirements necessary for the qualification of all bidders. These criteria shall include but not be limited to past experiences, available manpower and financial ability.
To solicit prospective bidders through qualification process, the Town Engineer, or his designee, shall notify said prospective bidders by publishing the qualification requirements as set forth in this article.
The Town Engineer or his designee, in consultation with the Town Attorney, the Town Manager, the Town Council and the department head most closely associated with the project, shall review the qualifications of the three lowest bids submitted and shall interview the three bidders who meet these qualifications. If the three lowest bids submitted do not qualify, then the next lowest responsible bidders, in order, shall be reviewed. If the contractor is previously qualified by the State of Connecticut on its project list for similar projects, the contractor is deemed qualified under this article.
The final bid package for a project under this article shall be exclusively directed to the proposed bidder deemed qualified under this article.