[Ord. No. 2444 §2, 10-10-2005]
A. 
During the construction process, soil is highly vulnerable to erosion by wind and water. Eroded soil endangers water resources by reducing water quality and causing the siltation of aquatic habitat for fish and other desirable species. Deposits of eroded soil also necessitate maintenance of sewers and ditches and the dredging of lakes. In addition, clearing and grading during construction cause the loss of native vegetation necessary for terrestrial and aquatic habitat.
B. 
Construction activities also utilize materials and generate wastes, which if not properly controlled can pollute receiving waters.
C. 
The purpose of this Chapter is to safeguard persons, protect property and prevent damage to the environment in Shrewsbury. This Chapter will also promote the public welfare by guiding, regulating and controlling the design, construction, use and maintenance of any significant development or other activity that disturbs or breaks the topsoil or results in the movement of earth on land in Shrewsbury.
[Ord. No. 2444 §2, 10-10-2005]
For the purposes of this Chapter, the following terms, phrases, words and their derivations shall have the meanings given herein.
BEST MANAGEMENT PRACTICES OR BMPS
Practices, procedures or a schedule of activities to reduce the amount of sediment and other pollutants in storm water discharges associated with construction and land disturbance activities.
CLEARING
Any activity that removes the vegetative surface cover.
CONSTRUCTION OR LAND DISTURBANCE SITE OR SITE
A parcel of land, or a contiguous combination thereof, where grading work is performed as part of a single unified plan of development.
DRAINAGE WAY
Any channel that conveys surface runoff through a site.
EROSION
The wearing away of land surface through the action of wind or water.
EROSION CONTROL
Any BMP that prevents or minimizes erosion.
GRADING
Reshaping the ground surface through excavation and/or fill of material, including the resulting conditions.
LAND DISTURBANCE ACTIVITIES
Any activity such as clearing, grading or any other action which results in removal of the natural site vegetation and destruction of the root zone or otherwise results in leaving the ground surface exposed to soil erosion through the action of wind or water.
MDNR
The Missouri Department of Natural Resources.
MSD
The Metropolitan St. Louis Sewer District.
PERIMETER CONTROL
A barrier that prevents sediment from leaving a site by filtering sediment-laden runoff or diverting it to a sediment trap or basin.
PHASING
Clearing a parcel of land in distinct phases, with the stabilization of each phase substantially completed before the clearing of the next.
RUNOFF COEFFICIENT
The fraction of total rainfall that will appear at the outfalls from a site.
SEDIMENT CONTROL
Any BMP that prevents eroded sediment from leaving a site.
SITE DISTURBANCE PERMIT
A permit issued by the municipality authorizing disturbance of the land at a specific site subject to conditions stated in the permit.
STABILIZATION
The use of BMPs that prevent exposed soil from eroding including improvements and structures for the control of erosion, runoff and grading.
START OF CONSTRUCTION
The first (1st) land-disturbing activity associated with a development, including land preparation such as clearing, grading and filling; installation of streets and walkways; excavation for basements, footings, piers or foundations; erection of temporary forms; and installation of accessory buildings such as garages.
STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
A management plan, the purpose of which is to ensure the design, implementation, management and maintenance of BMPs in order to reduce the amount of sediment and other pollutants in storm water discharges associated with land disturbance activities, comply with the standards of Section 445.050 and Section 445.060 of the Shrewsbury City Code and ensure compliance with the terms and conditions of the applicable State permits, including adherence to the land disturbance program contained in the Missouri DNR issued MS4 NPDES permit.
WATERCOURSE
A natural or artificial channel or body of water including, but not limited to, lakes, ponds, rivers, streams, ditches and other open conveyances that carry surface runoff water either continuously or intermittently.
[Ord. No. 2444 §2, 10-10-2005]
A. 
Any person who intends to conduct any land disturbance activity that will disturb forty-three thousand five hundred sixty (43,560) or more square feet or more must obtain a site disturbance permit from both the State of Missouri and the City of Shrewsbury.
B. 
Any person who buys a lot for construction from a person who has been issued a permit under Subsection (A) above (unless purchased for the purpose of building their own private residence) must obtain a separate site disturbance permit from Shrewsbury unless the original permittee retains responsibility for the land disturbance activities on the sold lot.
C. 
Site disturbance permits are not required for the following activities:
1. 
Any emergency activity that is immediately necessary for the protection of life, property or natural resources.
2. 
Existing nursery and agricultural operations conducted as a permitted main or accessory use.
D. 
Each permit application shall bear the name(s) and address(es) of the owner or developer of the site and of any consulting firm retained by the applicant together with the name of the applicant's principal contact at such firm and shall be accompanied by a filing fee.
E. 
Each permit application shall be accompanied by a Storm Water Pollution Prevention Plan, prepared for the specific site by or under the direction of a qualified professional, and a statement that any land clearing, construction or development involving the movement of earth shall be in accordance with the Storm Water Pollution Prevention Plan.
F. 
The permit applicant will be required to file with Shrewsbury a faithful performance bond, letter of credit or other improvement security in an amount deemed sufficient by Shrewsbury to cover all costs of improvements, landscaping, maintenance of improvements for such period as specified by Shrewsbury and engineering and inspection costs to cover the cost of failure or repair of improvements installed on the site.
G. 
The permit applicant will be required to obtain a land disturbance permit issued by the Missouri Department of Natural Resources for any site where one (1) acre or more of land will be disturbed before beginning any site work authorized by a City permit. This requirement applies to sites of less than one (1) acre that are part of a larger common plan that will ultimately disturb one (1) acre or more.
[Ord. No. 2444 §2, 10-10-2005]
A. 
The design requirements in Section 445.050, General Site Design Requirements, shall be taken into consideration when developing the Storm Water Pollution Prevention Plan and the plan shall include the following:
1. 
Name, address and telephone number of the site owner and the name, address and telephone number of the individual who will be in overall responsible charge of construction/development activities at the site.
2. 
Site address or location description.
3. 
A site map showing the outlines of the total project area, the areas to be disturbed, existing land uses, locations and names of surface water bodies, locations of temporary and permanent BMPs and such other information as the City of Shrewsbury Building Department may require.
4. 
Existing contours of the site and adjoining strips of off-site property and proposed contours after completion of the proposed grading and development, based on United States Geological Survey datum, with established elevations at buildings, walks, drives, street and roads; and information on necessary clearing and grubbing, removal of existing structures, excavating, filling, spreading and compacting.
5. 
An estimate of the runoff coefficient of the site prior to disturbance and the runoff coefficient after the construction addressed in the permit application is completed.
6. 
Estimated grading quantity.
7. 
Details of the site drainage pattern both before and after major grading activities.
8. 
Construction access to site.
9. 
Description of BMPs to be utilized to control erosion and sedimentation during the period of land disturbance.
10. 
Description of BMPs to be utilized to prevent other potential pollutants such as construction wastes, toxic or hazardous substances, petroleum products, pesticides, herbicides, site litter, sanitary wastes and other pollutants from entering the natural drainage ways during the period of construction and land disturbance.
11. 
Description of BMPs that will be installed during land disturbance to control pollutants in storm water discharges that will occur after land disturbance activity has been completed.
12. 
Location of temporary off-street parking and wash down area for related vehicles.
13. 
Sources of off-site borrow material or spoil sites and all information relative to haul routes, trucks and equipment.
14. 
The anticipated sequence of construction and land disturbance activities, including installation of BMPs, removal of temporary BMPs, stripping and clearing; rough grading; construction of utilities, infrastructure and buildings; and final grading and landscaping. Sequencing shall identify the expected date(s) on which clearing will begin, the estimated duration of exposure of cleared areas, areas of clearing, installation of temporary erosion and sediment control measures and establishment of permanent vegetation.
15. 
All erosion and sediment control measures necessary to meet the objectives of this Chapter throughout all phases of construction and after completion of site development. Depending upon the complexity of the project, the drafting of intermediate plans may be required at the close of each season.
16. 
Seeding mixtures and rates, types of sod, method of seedbed preparation, expected seeding dates, type and rate of lime and fertilizer application and kind and quantity of mulching for both temporary and permanent vegetative control measures.
17. 
Provisions for maintenance of control facilities, including easements and estimates of the cost of maintenance.
18. 
Plans for responding to any loss of contained sediment to include the immediate actions the permittee will take in case of a containment failure. This plan must include documentation of actions and mandatory reporting to the Building Department.
19. 
Schedules and procedures for routine inspections of any structures provided to prevent pollution of storm water or to remove pollutants from storm water and of the site in general to ensure all BMPs are continually implemented and are effective.
B. 
The permittee shall amend the Storm Water Pollution Prevention Plan whenever:
1. 
Design, operation or maintenance of BMPs is changed;
2. 
Design of the construction project is changed that could significantly affect the quality of the storm water discharges;
3. 
Site operator's inspections indicate deficiencies in the SWPPP or any BMP;
4. 
Inspections by the Building Department, MSD or by the Missouri Department of Natural Resources indicate deficiencies in the SWPPP or any BMP;
5. 
The SWPPP is determined to be ineffective in significantly minimizing or controlling erosion or excessive sediment deposits in streams or lakes;
6. 
The SWPPP is determined to be ineffective in preventing pollution of waterways from construction wastes, chemicals, fueling facilities, concrete truck washouts, toxic or hazardous materials, site litter or other substances or wastes likely to have an adverse impact on water quality;
7. 
Total settleable solids from a storm water outfall exceeds one-half (0.5) ml/L/hr if the discharge is within the prescribed proximity of a "Valuable Resource Water" as defined by the MDNR;
8. 
Total settleable solids from a storm water outfall exceeds two and one-half (2.5) ml/L/hr for any other outfall; or
9. 
MSD or the Missouri Department of Natural Resources determines whether violations of water quality standards may occur or have occurred.
C. 
The permittee shall:
1. 
Notify all contractors and other entities (including utility crews, City employees or their agents) that will perform work at the site of the existence of the SWPPP and what actions or precautions shall be taken while on site to minimize the potential for erosion and the potential for damaging any BMP;
2. 
Determine the need for and establish training programs to ensure that all site workers have been trained, as a minimum, in erosion control, material handling and storage and housekeeping;
3. 
Provide copies of the SWPPP to all parties who are responsible for installation, operation or maintenance of any BMP; and
4. 
Maintain a current copy of the SWPPP on the site at all times.
[Ord. No. 2444 §2, 10-10-2005]
A. 
Grading, erosion control practices, sediment control practices and watercourse crossings shall be adequate to prevent transportation of sediment from the site to the satisfaction of the Building Department.
B. 
Cut and fill slopes shall be no greater than three to one (3:1), except as approved by the Building Department to meet other community or environmental objectives.
C. 
Clearing and grading of natural resources, such as forests and wetlands, shall not be permitted, except when in compliance with all other provisions of the Shrewsbury City Code and in compliance with State and Federal regulations.
D. 
Clearing techniques that retain existing vegetation to the maximum extent practicable shall be used and the time period for disturbed areas to be without vegetative cover shall be minimized to the extent practical to the satisfaction of the Building Department.
E. 
Clearing, except that necessary to establish sediment control devices, shall not begin until all sediment control devices have been installed and have been stabilized.
F. 
Phasing shall be required on all sites disturbing greater than thirty (30) acres with the size of each phase to be established at plan review and as approved by the Building Department.
G. 
Erosion control requirements shall include the following:
1. 
Soil stabilization shall be completed within five (5) days of clearing or inactivity in construction.
2. 
If seeding or another vegetative erosion control method is used, it shall become established within two (2) weeks or the Building Department may require the site to be reseeded or a non-vegetative option employed.
3. 
Techniques shall be employed to ensure stabilization on steep slopes and in drainage ways.
4. 
Soil stockpiles must be stabilized or covered at the end of each workday.
5. 
The entire site must be stabilized, using a heavy mulch layer or another method that does not require germination to control erosion, at the close of the construction season.
6. 
Techniques shall be employed to prevent the blowing of dust or sediment from the site.
7. 
Techniques shall be employed to divert upland runoff past disturbed slopes.
H. 
Sediment control requirements shall include:
1. 
Settling basins, sediment traps or tanks and perimeter controls.
2. 
Settling basins shall be provided for each drainage area with ten (10) or more acres disturbed at one (1) time and shall be sized to contain five-tenths (0.5) inch of sediment from the drainage area and be able to contain a 2-year, 24-hour storm. If the provision of a basin of this size is impractical, other similarly effective BMPs, as evaluated and specified in the SWPPP, shall be provided.
3. 
Settling basins shall be designed in a manner that allows adaptation to provide long-term storm water management as required by the Building Department.
4. 
Settling basins shall have stabilized spillways to minimize the potential for erosion of the spillway or basin embankment.
5. 
Protection for adjacent properties by the use of a vegetated buffer strip in combination with perimeter controls.
I. 
Watercourse protection requirements shall include:
1. 
Encroachment into or crossings of active watercourses/riparian areas and wetlands shall be avoided to the maximum extent practicable. Where applicable, all local, State and Federal permits and approvals shall be provided to the Building Department prior to the issuance of a site disturbance permit.
2. 
Stabilization of any watercourse channels before, during and after any in-channel work.
3. 
If a defined watercourse is to be re-aligned or reconfigured, clearing and grubbing activities within fifty (50) feet of the watercourse shall not begin until all materials and equipment necessary to protect the watercourse and complete the work are on site. Once started, work shall be completed as soon as possible. Areas within fifty (50) feet of the watercourse shall be recontoured and revegetated, seeded or otherwise protected within five (5) working days after grading has ceased.
4. 
All storm water conveyances shall be designed according to the criteria of the Metropolitan St. Louis Sewer District (MSD) and the City of Shrewsbury and the necessary MSD permits and Shrewsbury permits obtained.
5. 
Stabilization adequate to prevent erosion shall be provided at the outlets of all pipes and paved channels.
J. 
Construction site access requirements shall include:
1. 
A temporary access road provided at all sites including a wash-down area supporting all active sites,
2. 
Other measures required by the Building Department in order to ensure that construction vehicles do not track sediment onto public streets or washed with wash effluent channeled directly into storm drains.
K. 
Control requirements for construction materials, construction wastes and other wastes generated on site shall include provisions satisfactory to the Building Department for:
1. 
Spill prevention and control facilities for materials such as paint, solvents, petroleum products, chemicals, toxic or hazardous substances, substances regulated under the Resource Conservation and Recovery Act (RCRA) or the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and any wastes generated from the use of such materials and substances, including their containers. Any containment systems employed to meet this requirement shall be constructed of materials compatible with the substances contained and shall be adequate to protect both surface and ground water.
2. 
Collection and disposal of discarded building materials and other construction site wastes, including those listed in Subsection (I)(1) above.
3. 
Litter control.
4. 
Control of concrete truck washouts.
5. 
Assurance that on-site fueling facilities will adhere to applicable Federal and State regulations concerning storage and dispensers.
6. 
Provision of sufficient temporary toilet facilities to serve the number of workers on site.
[Ord. No. 2444 §2, 10-10-2005]
A. 
General Standards.
1. 
The rate of imperviousness shall be determined by ratios of five percent (5%) to one hundred percent (100%) impervious areas in accordance with Table A.
2. 
Differential runoff rates for all categories of projects shall be evaluated by the Rational Formula. The 25-year frequency, twenty (20) minute duration, inlet time runoff coefficients in Table A shall be used as the upper limit for evaluation.
B. 
Review Considerations For Detention Facilities. In general, detention facilities shall be provided with obvious and effective control strategies. The following shall be considered in determining the effectiveness and safety of these facilities in relation to the intent and purpose of this Section:
1. 
Volume of retention for the total project = Differential runoff rate x area of project x thirty (30) minutes x sixty (60) seconds/minute;
2. 
Tributary (Q) peak runoff to basin;
3. 
Balanced maximum outflow rate from the low-flow structures;
4. 
Ratios of inflow to outflow rates;
5. 
Sizing of the overflow facilities;
6. 
Stability of retention dikes;
7. 
Safety features;
8. 
Maintenance features.
TABLE "A" AVERAGE C.I. FACTORS IN C.F.S. PER ACRE 20-MINUTES INLET TIME*
Percent Impervious
C or P Factor
0.5 Year
1 Year
2 Year
5 Year
10 Year
20 Year
25 Year
50 Year
100 Year
5
.37
0.70
0.92
1.15
1.41
1.59
1.78
2.00
2.18
2.37
10
.39
0.74
0.97
1.21
1.49
1.68
1.88
2.11
2.30
2.50
15
.41
0.77
1.02
1.27
1.56
1.76
1.97
2.21
2.42
2.62
20
.435
0.82
1.08
1.35
1.66
1.87
2.09
2.35
2.57
2.78
25
.455
0.86
1.13
1.41
1.73
1.96
2.19
2.46
2.68
2.91
30
.475
0.90
1.18
1.47
1.81
2.04
2.28
2.57
2.80
3.04
35
.495
0.94
1.23
1.53
1.89
2.13
2.38
2.67
2.92
3.17
40
.52
0.98
1.29
1.61
1.98
2.24
2.50
2.81
3.07
3.33
45
.54
1.02
1.34
1.67
2.06
2.32
2.60
2.92
3.19
3.46
50
.56
1.06
1.39
1.74
2.13
2.41
2.69
3.02
3.30
3.58
55
.58
1.10
1.44
1.80
2.21
2.49
2.79
3.13
3.42
3.71
60
.60
1.13
1.49
1.86
2.29
2.58
2.89
3.24
3.54
3.84
65
.625
1.18
1.55
1.94
2.38
2.69
3.01
3.38
3.69
4.00
70
.645
1.22
1.60
2.00
2.46
2.77
3.10
3.48
3.81
4.13
75
.665
1.26
1.65
2.06
2.53
2.86
3.20
3.59
3.92
4.26
80
.685
1.29
1.70
2.12
2.61
2.95
3.29
3.7
4.04
4.38
85
0.705
1.33
1.75
2.19
2.69
3.03
3.39
3.81
4.16
4.51
90
0.73
1.38
1.81
2.26
2.78
3.14
3.51
3.94
4.31
4.67
95
0.75
1.42
1.86
2.33
2.86
3.23
3.61
4.05
4.43
4.8
100
0.77
1.46
1.91
2.39
2.93
3.31
3.7
4.16
4.54
4.93
Rainfall: In inches per hour
1.9
2.48
3.1
3.8
4.3
4.8
5.4
5.9
6.4
C. 
Open Dry Reservoirs.
1. 
Wet weather ponds or dry reservoirs shall be designed with proper safety, stability and ease of maintenance features and shall not detain storm water to a depth greater than four (4) feet. Depths greater than four (4) feet can be detained provided that the reservoir is surrounded by a chain link (or approved equal) fence and locked gate.
2. 
Maximum side slopes for grass-edged reservoirs shall not exceed one (1) foot vertical for two (2) feet horizontal two to one (2:1) unless adequate measures are included to provide for the stability of these slopes.
3. 
In no case shall the limits of maximum ponding elevation be closer than thirty (30) feet horizontally from any building and less than two (2) feet vertically below the lowest sill elevation.
4. 
The entire reservoir area shall be seeded, fertilized and mulched, sodded or paved prior to release of escrows.
D. 
Permanent Lakes Used For Detention.
1. 
Permanent lakes with fluctuating volume controls may be used as retention areas provided that the limits of maximum ponding elevations are no closer than thirty (30) feet horizontally from any building and less than two (2) feet below the lowest sill elevation of any building.
2. 
Maximum fluctuations from permanent pool elevation to maximum ponding elevation shall be three (3) feet.
3. 
Special consideration shall be given to measures to ensure the safety of small children in the design of permanent lakes especially when located in residential areas.
E. 
Discharge Systems.
1. 
The design discharge (Q) for the low-flow orifice shall not exceed the limits in the following Table "B" (based on five percent (5%) imperviousness and twenty (20) minute inlet time):
2. 
Low-flow pipes shall not be smaller than four (4) inches in diameter to minimize maintenance and operating problems, except in parking lot and roof retention where minimum size of opening shall be designed specifically for each condition.
3. 
The overflow opening or spillway shall be designed to accept the total peak runoff of the improved tributary area with discharge velocity not to exceed five (5) feet per second unless special provisions are made.
4. 
Proper engineering judgment shall be exercised in analysis of secondary routing of discharge of greater intensity than the design 25-year frequency in order to avoid economic losses or damage downstream. Review with 25- and 50-year frequency is recommended.
TABLE "B"
Storm Frequency Years
Maximum Discharge Rate In Cubic Feet Per Second (CFS) Per Acre
0.5
0.7
1
0.92
2
1.15
5
1.41
10
1.59
20
1.78
25
2
The maximum discharge shall be designated to take place under total anticipated design-head conditions.
5. 
Sizing of the system below the control structure shall be for the total improved peak runoff tributary to the structure with no allowance for retention with discharge velocity not to exceed five (5) feet per second unless special provisions are made.
6. 
Table "B" shall be used in determining the proper size of discharge facilities.
7. 
All storm water discharge pipes shall be computed on a 25-year rainfall frequency at a minimum.
[Ord. No. 2444 §2, 10-10-2005]
A. 
Detention facilities, when mandatory, are to be built in conjunction with the storm sewer installation and/or grading. Since these facilities are intended to control increased runoff, they must be partially or fully operational soon after the clearing of the vegetation.
B. 
Silt and debris connected both with early construction and with general erosion from the site and elsewhere in the watershed after construction shall be removed periodically from the detention area and control structure in order to maintain close to full storage capacity.
C. 
The responsibility of maintenance of the detention facilities in subdivision projects shall remain with the developer until such times as applicable escrows are released. Upon release of escrows the maintenance responsibility shall be vested in the trustees of the subdivision by virtue of the trust indenture. The indenture of the trust shall clearly indicate resident responsibility for maintenance in cases of projects without common ground.
D. 
The responsibility of maintenance of the detention facilities in single owner development projects shall remain with the general contractor until final inspection of the development is performed and approved and a legal certificate of occupancy is issued. After legal occupancy of the project, the maintenance of detention facilities shall be vested with the owner of the project.
[Ord. No. 2444 §2, 10-10-2005]
A. 
The Building Department shall make inspections as hereinafter required and either shall approve that portion of the work completed or shall notify the permittee wherein the work fails to comply with the grading, erosion and sediment control plan as approved. Plans for grading, stripping, excavating and filling work bearing the stamp of approval of the Building Department of Shrewsbury shall be maintained at the site during the progress of the work. To obtain inspections, the permittee shall notify the Building Department of Shrewsbury at least twenty-four (24) working hours before the following:
1. 
Start of construction.
2. 
Installation of sediment and erosion measures.
3. 
Completion of site clearing.
4. 
Completion of rough grading.
5. 
Completion of final grading.
6. 
Close of the construction season.
7. 
Completion of final landscaping.
B. 
The permittee or his/her agent shall make regular inspections of the land disturbance site, including all erosion and sediment and other pollutant control measures, outfalls and off-site receiving waters in accordance with the inspection schedule outlined in the approved SWPPP. Inspections must be scheduled at least once per week and no later than seventy-two (72) hours after heavy rain. The purpose of such inspections will be to ensure proper installation, operation and maintenance of BMPs and to determine the overall effectiveness of the SWPPP and the need for additional control measures. All inspections shall be documented in written form on weekly reports with copies submitted to the Building Department of Shrewsbury at the time interval specified in the permit. The inspection reports are to include the following minimum information:
1. 
Inspector's name, signature and contact phone number;
2. 
Date/time of inspection;
3. 
Observations relative to the effectiveness of the BMPs;
4. 
Actions taken or necessary to correct deficiencies; and
5. 
A listing of areas where land disturbance operations have permanently or temporarily stopped.
In addition, the permittee shall notify the site contractor(s) responsible for any deficiencies identified so that deficiencies can be corrected within seven (7) calendar days of the weekly inspection report.
C. 
The Building Department shall make inspections as deemed necessary to ensure the validity of the reports filed under Subsection (B) or to otherwise ensure proper installation, operation and maintenance of storm water BMPs and to determine the overall effectiveness of the SWPPP and the need for additional control measures.
[Ord. No. 2444 §2, 10-10-2005]
A. 
Stop-Work Order—Revocation Of Permit. In the event that any person holding a site disturbance permit pursuant to this Chapter violates the terms of the permit or implements site development in such a manner as to materially adversely affect the health, welfare or safety of persons residing or working in the neighborhood or development site so as to be materially detrimental to the public welfare or injurious to property or improvements in the neighborhood, the Building Department may suspend or revoke the site disturbance permit.
B. 
Violation And Penalties.
1. 
No person shall construct, enlarge, alter, repair or maintain any grading, excavation or fill or cause the same to be done, contrary to or in violation of any terms of this Chapter. Any person violating any of the provisions of this Chapter shall be deemed guilty of a misdemeanor and each day during which any violation of any of the provisions of this Chapter is committed, continued or permitted shall constitute a separate offense. Upon conviction of any such violation, such person, partnership or corporation shall be punished in accordance with Title I, Section 100.090 of the Shrewsbury City Code for each offense. In addition to any other penalty authorized by this Section, any person, partnership or corporation convicted of violating any of the provisions of this Chapter shall be required to bear the expense of such restoration.
2. 
Any person violating any of the provisions of this Chapter three (3) times will be subject to forfeiture of the bond as set forth in Section 445.030.
C. 
Project Closure Requirements. Any site development escrows or bonds will not be fully released to the site operator or permittee until all of the following have been completed:
1. 
All temporary storm water control BMPs have been removed and the site has been fully stabilized.
2. 
All permanent storm water control BMPs have been completed.
3. 
All final inspections/certifications have been completed by each of the government jurisdictions involved in authorizing the project.