[HISTORY: Adopted by the Board of Supervisors of the Township
of Fairview 9-13-2012 by Ord. No. 2012-5. Amendments noted where
applicable.]
Table of Contents
Table of Contents
- Part I: Administrative Legislation
- Ch 1 General Provisions
- Ch 7 Authorities, Municipal
- Ch 18 Educational Service Agency
- Ch 23 Fire Company
- Ch 28 Intergovernmental Agreements
- Ch 34 Manager
- Ch 40 Pension Plans
- Ch 43 Personnel Policies
- Ch 46 Planning Commission
- Ch 49 Police Department
- Ch 57 Recreation Board
- Ch 62 Salaries and Compensation
- Part II: General Legislation
- Ch 79 Alarm Systems
- Ch 84 Animals
- Ch 96 Buildings, Numbering of
- Ch 101 Burning, Outdoor
- Ch 113 Construction Codes, Uniform
- Ch 117 Curfew
- Ch 120 Disorderly Conduct
- Ch 128 Drugs and Drug Paraphernalia
- Ch 139 Fees
- Ch 145 Fire Protection
- Ch 151 Floodplain Management
- Ch 156 Grading and Excavation
- Ch 168 Insurance
- Ch 172 Junkyards
- Ch 187 Noise
- Ch 199 Parks and Recreation Areas
- Ch 203 Peddling and Soliciting
- Ch 211 Pornography
- Ch 215 Property Maintenance
- Ch 218 Public Safety Radio Amplification
- Ch 224 Rental Property
- Ch 229 Services Provided by Township
- Ch 232 Sewers and Sewage Disposal
- Ch 247 Solid Waste
- Ch 252 Stormwater Management
- Ch 252 Art I General Provisions
- § 252-1 Title.
- § 252-2 Findings.
- § 252-3 Purpose.
- § 252-4 Statutory authority.
- § 252-5 Applicability.
- § 252-6 Compatibility with other permit and ordinance requirements.
- § 252-7 Interpretation.
- § 252-8 Erroneous permit.
- Ch 252 Art II Terminology
- § 252-9 Definitions.
- Ch 252 Art III Stormwater Management Standards
- § 252-10 General requirements.
- § 252-11 Exemptions.
- § 252-12 Volume controls.
- § 252-13 Rate controls.
- § 252-14 Stormwater management facilities for Pennsylvania Department of Transportation and Pennsylvania Turnpike Commission roadways and associated facilities.
- § 252-15 Design criteria.
- § 252-16 Regulations governing stormwater management facilities.
- § 252-17 Calculation methodology.
- § 252-18 Carbonate geology.
- § 252-19 Erosion and sedimentation control requirements.
- Ch 252 Art IV Stormwater Management (SWM) Site Plan Requirements
- § 252-20 General requirements.
- § 252-21 SWM site plan contents.
- § 252-22 Plan submission.
- § 252-23 Plan review and approval procedure.
- § 252-24 Revision of plans.
- § 252-25 Resubmission of disapproved SWM site plans.
- § 252-26 Authorization to construct and term of validity.
- § 252-27 As-built plans, completion certificate, and final inspection.
- Ch 252 Art V Construction Inspections
- § 252-28 Schedule of inspections.
- Ch 252 Art VI Operation and Maintenance
- § 252-29 Responsibilities of developers and landowners.
- § 252-30 Operation and maintenance agreements.
- § 252-31 Performance guarantee.
- § 252-32 Maintenance guarantee.
- § 252-33 Municipal stormwater maintenance fund.
- Ch 252 Art VII Fees and Expenses
- § 252-34 General.
- Ch 252 Art VIII Prohibitions
- § 252-35 Prohibited discharges and connections.
- § 252-36 Roof drains.
- § 252-37 Alteration of SWM BMPs.
- Ch 252 Art IX Enforcement and Penalties
- § 252-38 Right of entry.
- § 252-39 Inspection.
- § 252-40 Notification.
- § 252-41 Enforcement.
- § 252-42 Suspension and revocation.
- § 252-43 Violations and penalties.
- § 252-44 Appeals.
- Ch 255 Streets and Sidewalks
- Ch 260 Subdivision and Land Development
- Ch 264 Taxation
- Ch 268 Towing
- Ch 273 Trees
- Ch 279 Vehicles, Abandoned and Junked
- Ch 282 Vehicles and Traffic
- Ch 289 Water
- Ch 300 Zoning
- Appendix
- Ch A302 Fee Schedule
- Derivation Table
- Ch DT Derivation Table
- Disposition List
- Ch DL Disposition List