[Sub. Regs. §483.380; Ord. No. 343 §1, 5-29-1979]
Upon the filing of a preliminary plat of a subdivision or any portion thereof, the subdivider shall pay a filing fee of one hundred dollars ($100.00) plus two dollars ($2.00) for each lot or unit shown on the plat. Upon the filing of a final plat of the subdivision or any portion thereof, the subdivider shall pay a filing fee of one hundred dollars ($100.00) plus two dollars ($2.00) for each lot or unit shown on the plat. The fees shall be used to defray the cost of processing and reviewing such plans. The subdivider shall pay any additional engineering and other professional fees incurred by the City as a result of this review process.
[Sub. Regs. §483.390; Ord. No. 343 §1, 5-29-1979]
Prior to the installation of any and all subdivision improvements or facilities, the subdivider shall obtain from the City a construction permit. This permit authorizes the construction of only those subdivision improvements or facilities for which final plans have been submitted and approved by the Commission. The charge for said permit shall be in compliance with City ordinance.
[Sub. Regs. §483.400; Ord. No. 343 §1, 5-29-1979]
When construction referred to in Section 410.510 above is complete, final inspection by the designated City authority shall be made. A final as-built set of drawings shall be supplied by the subdivider to the City Engineer or his/her designate. Such drawings shall be certified correct by a Missouri registered professional engineer and shall be affixed to the final plat certifying that the engineer has inspected all of the improvements installed and that the materials contained therein meet the requirements contained in the plans and specifications as approved by the Commission.