[Ord. No. 1238, 10-18-2010]
The purpose of this policy is to set forth guiding principles and practices for use in all transportation projects, where practicable, economically feasible, and otherwise in accordance with applicable law, so as to encourage walking, bicycling, and other non-motorized forms of transit, in addition to normal motorized transit, including personal, freight, and public transit vehicles. All uses must be designed to allow safe operations for all users regardless of age or ability. The ultimate goal of this policy is the creation of an interconnected network of complete streets that balances the needs of all users in pleasant and appealing ways in order to achieve maximum functionality and use.
[Ord. No. 1238, 10-18-2010]
A. 
This policy requires the City Administrator to include complete street elements in the design, construction and maintenance of public transportation projects, improvements and facilities. The City Administrator or Board of Aldermen may exempt a project from this policy provided one (1) or more of the following conditions are met:
1. 
Non-motorized use of the roadway under consideration is prohibited by law. In this case a greater effort may be necessary to accommodate bicyclists and pedestrians elsewhere within the right-of-way or within the same transportation corridor.
2. 
The cost of inclusion would be excessively disproportionate to the need or probable use. "Excessively disproportionate" is defined as exceeding twenty percent (20%) of the cost of the larger transportation project. This twenty percent (20%) figure should be used in an advisory rather than an absolute sense.
3. 
The street has severe topographic or natural resource constraints.
In all cases where an exemption has been granted, the City Administrator or other appropriate official shall document the decision and the invoked exemption condition(s) in the project plan.
B. 
This policy requires consideration of complete streets elements by the Planning and Zoning Commission and Board of Zoning Adjustment in appropriate circumstances. Accordingly, the City strongly encourages all developers and builders to obtain and comply with, as appropriate, these standards.
C. 
This policy is intended to cover all development and redevelopment in the public domain within City of Pevely. This includes all public transportation projects such as, but not limited to, new road construction, reconstruction retrofits, upgrades, resurfacing, and rehabilitation. This also includes privately built roads intended for public use. As such, compliance with these principles may be factored into decisions related to the City's participation in private projects and whether the City will accept possession of privately built roads constructed after the passage of this Chapter. The City Administrator, on a case-by-case basis, may exclude routine maintenance from these requirements.
D. 
The City understands that special considerations and designs are necessary to accommodate older adults and disabled citizens. Accordingly, the City will ensure that those needs are met in all complete streets designs. All public transportation projects involving complete streets elements, where practicable, shall be ADA compliant to help meet those special considerations.
[Ord. No. 1238, 10-18-2010]
A. 
"Complete Street" Defined. A complete street is designed to be a transportation corridor for all users: pedestrians, cyclists, transit users, and motorists. Complete streets are designed and operated to enable safe continuous travel networks for all users. Pedestrians, bicyclists, motorists and bus riders of all ages and abilities are able to safely move from destination to destination along and across a network of complete streets. Transportation improvements, facilities and amenities that may contribute to complete streets and that are considered as elements of a "complete street" include: street and sidewalk lighting; pedestrian and bicycle safety improvements; access improvements, including compliance with the Americans with Disabilities Act; public transit facilities accommodation including, but not limited to, pedestrian access improvement to transit stops and stations; street trees and landscaping; drainage; and street amenities.
B. 
The City will strive, where practicable and economically feasible, to incorporate "complete streets" elements into all public transportation projects in order to provide appropriate accommodation for bicyclists, pedestrians, transit users and persons of all abilities, while promoting safe operation for all users, in comprehensive and connected networks in a manner consistent with, and supportive of, the surrounding community.
C. 
The City will incorporate complete streets principles into all public strategic plans, upon subsequent updates. The principles, where practicable, shall be incorporated into other public works plans, manuals, rules, regulations, operational standards, and programs as appropriate and directed by the City Administrator. The principles shall be incorporated into appropriate materials and resources no later than two (2) years after the adoption of this Chapter.
D. 
It shall be a goal of the City to foster partnerships with the State of Missouri, Jefferson County, neighboring communities, and the business districts in consideration of functional facilities and accommodations in furtherance of the City's complete streets policy and the continuation of such facilities and accommodations beyond the City's borders.
E. 
The City recognizes that complete streets may be achieved through single elements incorporated into a particular project or incrementally through a series of smaller improvements or maintenance activities over time. The City will attempt to draw upon all possible funding sources to plan and implement this policy and shall investigate grants that may be available to make complete streets elements more economically feasible.
F. 
The City recognizes that the elements comprising a complete street are only effective when appealing and pleasant to use and will ensure improvements meet those standards.
[Ord. No. 1238, 10-18-2010]
A. 
During the planning phase of any public transportation improvement project, a designee of the City Administrator (which may be the Street Superintendent, the City's design engineer, or other person or firm deemed appropriate by the City Administrator) shall conduct a study and analysis relating to the addition and incorporation of complete streets elements into the project.
B. 
The study and analysis shall include cost estimates, whether the elements could be incorporated in a safe and legal manner, the degree that such improvements or facilities may be utilized, the benefit of such improvements or facilities to other public transportation improvements, whether additional property is required, physical or area requirements or limitations and any other factors deemed relevant.
C. 
Such study and analysis shall be submitted to the City Administrator for consideration in the design and planning of the public transportation project. The City Administrator shall incorporate complete streets elements in each public transportation project to the extent that such is economically and physically feasible.
[Ord. No. 1238, 10-18-2010]
A. 
The City Administrator shall be responsible for the overall implementation and execution of the complete streets principles and practices.
B. 
The City Administrator shall collaborate with appropriate staff to adopt a complete streets checklist for use on all public transportation projects. The City encourages all developers and builders to obtain and use this checklist.