[R.O. 2004 § 410.010; Ord. No. 2.56 § 3(Art. 1 § 1.01), 1-9-2001]
These regulations, including all appendices made a part hereof, shall be known and may be cited as the "Mount Vernon Subdivision Regulations" and shall hereinafter be referred to as "these regulations."
[R.O. 2004 § 410.020; Ord. No. 2.56 § 3(Art. 1 § 1.02), 1-9-2001]
These regulations shall apply to all land located within the incorporated area of Mount Vernon, Missouri.
[R.O. 2004 § 410.030; Ord. No. 2.56 § 3(Art. 1 § 1.03), 1-9-2001]
A. 
Planning And Zoning Commission. The Planning and Zoning Commission of the City of Mount Vernon, Missouri, is vested with the authority to review, approve, conditionally approve and disapprove applications for the subdivision of land per these regulations. The Planning and Zoning Commission may grant variances from these regulations pursuant to the provisions of Section 410.380.
B. 
Governing Body. The Governing Body of the City of Mount Vernon, Missouri, is vested with the authority to accept or refuse the dedication of land for public purposes.
[R.O. 2004 § 410.040; Ord. No. 2.56 § 3(Art. 1 § 1.04), 1-9-2001]
In order that land may be subdivided in accordance with these purposes and policies, these regulations are hereby adopted and made effective as of January 9, 2001. All applications for subdivision approval, including final plats, pending on the effective date of these regulations shall be reviewed under these regulations except that these regulations will not apply if preliminary plat approval was obtained prior to the effective date of these regulations, unless the Planning and Zoning Commission determines that application of these regulations is necessary to avoid a substantial risk of injury to public health, safety and general welfare.
[R.O. 2004 § 410.060; Ord. No. 2.56 § 3(Art. 1 § 1.06), 1-9-2001]
The purpose and intent of these regulations is to provide for the harmonious development of the community and the surrounding area; to provide for the proper location and width of streets, building lines, open spaces, safety and recreation facilities, utilities, drainage and for the avoidance of congestion of population through application of minimum lot width, depth and area and the compatibility of design requirements; to require and fix the extent to which and the manner in which streets shall be graded and improved and water, sewer, drainage and other utility mains and piping or connections or other physical improvements shall be installed; and to provide for and secure the actual construction of such physical improvements.
[R.O. 2004 § 410.070; Ord. No. 2.56 § 3(Art. 1 § 1.07), 1-9-2001]
The owner or owners of any land located within the jurisdiction of these regulations subdividing said land into two (2) or more lots and blocks or tracts or parcels for the purpose of laying out any subdivisions, suburban lots, building lots, tracts or parcels or any owner of any land establishing any street, alley, park or other property intended for public use or for the use of purchasers or owners of lots, tracts or parcels of land fronting thereon or adjacent thereto shall cause a plat to be made in accordance with these regulations, unless exempted under Section 410.080. In addition, these regulations shall apply to the issuance of a building permit.
[R.O. 2004 § 410.080; Ord. No. 2.56 § 3(Art. 1 § 1.08), 1-9-2001]
A. 
These regulations shall not apply in the following instances:
1. 
A change in the boundary between adjoining lands which does not create an additional or substandard lot.
2. 
Land used for street or railroad right-of-way, a drainage easement or other public utilities subject to local, State or Federal regulations where no new street or easement of access is involved.
3. 
Any resubdivision of lots, parcels or tracts must be done in accordance with these regulations.
4. 
Any transfer by operation of law.
5. 
Lots that have been previously platted and zoned for industrial purposes may be divided into two (2) or more tracts without replatting or resubdividing such lots in conformance with these regulations.
[R.O. 2004 § 410.090; Ord. No. 2.56 § 3(Art. 1 § 1.09), 1-9-2001]
A. 
Interpretation. In their interpretation and application, the provisions of these regulations shall be held to be the minimum requirements for the promotion of the public health, safety and general welfare. These regulations shall be construed broadly to promote the purpose for which they are adopted.
1. 
Public Provisions. These regulations are not intended to interfere with, repeal or annul any other ordinance, rule or regulation, Statute or other provision of law except as provided in these regulations. Where any provision of these regulations imposes restrictions different from those imposed by any other provisions of these regulations or any other ordinance, rule or regulation or other provision of law, the provision that is more restrictive or imposes higher standards shall control.
2. 
Private Provisions. These regulations are not intended to repeal any easement, covenant or any other private agreement or restriction, provided that where the provisions of these regulations are more restrictive or impose higher standards or regulations than such an easement, covenant or other private agreement or restriction, the requirements of these regulations shall govern. Where the provisions of the easement, covenant or private agreement or restriction impose duties or obligations more restrictive or standards that are higher than the requirements of these regulations or the determinations of the Planning and Zoning Commission or the Governing Body in approving a subdivision or in enforcing these regulations and the private provisions are not inconsistent with these regulations, then the private provisions shall be operative and supplemental to these regulations and the determinations made under the regulations.
[R.O. 2004 § 410.100; Ord. No. 2.56 § 3(Art. 1 § 1.14), 1-9-2001]
All plans, plats or replats of land laid out in building lots and the streets, alleys or other portions of the same intended to be dedicated for public use or for the use of purchasers or owners of the lots fronting thereon or adjacent thereto shall be submitted to the Mount Vernon Planning and Zoning Commission and Board of Aldermen for their official review and action as applicable per these regulations. The Recorder of Deeds shall not record any plat, as required by law, until such plat is approved by the Planning and Zoning Commission and Governing Body and is signed by the Chairman and Secretary of the Planning and Zoning Commission, by the Mayor, City Clerk and City Engineer of the City of Mount Vernon, Missouri, and the Fire Chief or other authorized personnel of the applicable fire protection district.
[R.O. 2004 § 410.110; Ord. No. 2.56 § 3(Art. 1 § 1.15), 1-9-2001]
All final plats shall be prepared and stamped by a professional surveyor licensed in the State of Missouri.
[R.O. 2004 § 410.120; Ord. No. 2.56 § 3(Art. 3 §§ 3.01 — 3.02), 1-9-2001; Ord. No. 2.88 § 1, 8-12-2003]
A. 
Usage.
1. 
For the purpose of these regulations, certain numbers, abbreviations, terms and words shall be used, interpreted and defined as set forth in Subsection (B).
2. 
Unless the context clearly indicates to the contrary, words used in the present tense include the future tense and words used in the plural include the singular.
B. 
Specific Definitions. As used in this Chapter, the following terms shall have these prescribed meanings:
ALLEY
A public or private right-of-way designed to serve as primary vehicular access to the side or rear of those properties whose principal frontage is on some other street.
APPLICANT
The owner of land proposed to be subdivided or its representative who shall have express written authority to act on behalf of the owner. Consent shall be required from the legal owner of the premises. See also "developer," "owner" and "subdivider."
BLOCK
A tract of land entirely surrounded by streets or by a combination of streets and public rights-of-way or as otherwise determined by the Planning and Zoning Commission or its authorized representative.
BOARD OF ALDERMEN
See "Governing Body."
BOND
Any form of security, including a cash deposit, surety bond, collateral, property or instrument of credit, in an amount and form satisfactory to the Governing Body. All bonds shall be approved by the Governing Body wherever a bond is required by these regulations.
BUILDING
See "structure."
BUILDING INSPECTOR
The person or persons authorized and empowered by the Board of Aldermen to administer and enforce the permitting and inspecting process within the City.
CASH IN LIEU OF LAND
Payment of money into fund earmarked by the City of Mount Vernon to provide for acquisition of facilities off-site in place of dedicating land or providing such facility on site.
CERTIFICATE OF OCCUPANCY
An official certification indicating that a use or building (as built) conforms to the provisions of these regulations and may be used or occupied.
CERTIFY
Whenever these regulations require that an agency or official certify the existence of some fact or circumstance, the City of Mount Vernon by administrative rule may require that such certification be made in any manner, oral or written, which provides reasonable assurance of the accuracy of the certification.
CITY
The City of Mount Vernon, Missouri.
CITY ENGINEER
The licensed engineer designated by the Governing Body to furnish engineering assistance for the administration of these regulations.
COMMON OWNERSHIP
Ownership by the same person, corporation, firm, entity, partnership or unincorporated association; or ownership by different corporations, firms, partnerships, entities or unincorporated associations in which a stockbroker, partner or associate or a member of his/her family owns an interest in each corporation, firm, partnership, entity or unincorporated association.
CONSTRUCTION DOCUMENTS
The maps or drawings showing the specific location and design of improvements to be installed in a subdivision in accordance with the requirements of the Planning and Zoning Commission as a condition of the approval of the plat.
CUL-DE-SAC
A local street with only one (1) outlet that terminates in a vehicular turnaround and having an appropriate terminal for the safe and convenient reversal of traffic movement.
DEDICATION
The transfer of private to public or common ownership for a public purpose. The transfer may be in fee simple title or less than fee simple interest, including easements. Dedication requires the acceptance of the interest to be complete.
DEVELOPER
The owner of land proposed to be subdivided or its representative who is responsible for any undertaking that requires review and/or approval under these regulations. See also "owner" and "subdivider."
EASEMENT
A permanent or temporary grant of right by a property owner to the public, a corporation or other persons of the use of a portion of a lot or tract of land for specified purposes where title to said portion of the lot or tract of land remains with the landowner.
ESCROW
A deposit of cash with the local government or escrow agent to secure the promise to perform some act.
ESCROW AGENT
A title company, bank, savings and loan association, trust company, attorney or any other person or agency approved by the City to act as an escrow agent.
FAIR MARKET VALUE
The fair market value of a designated unit at the time such value is approved by the Governing Body.
FRONTAGE
The length of the property abutting on one (1) side of a street measured along the dividing line between the property and the street.
GOVERNING BODY
The duly elected Mayor and Board of Aldermen of the City of Mount Vernon.
HOMEOWNERS' ASSOCIATION
See "property owners' association."
IMPROVEMENT
Any roadway, drainage ditch, sidewalk, pedestrianway, parkway, tree lawn, off-street parking area, lot improvement or other facility for which the City of Mount Vernon may ultimately assume the responsibility for maintenance and operation or which may affect an improvement for which the City of Mount Vernon responsibility is established.
LOT
A tract, plot or portion of a subdivision or other parcel of land intended as a unit for the purpose, whether immediate or future, of transfer of ownership or possession or for building development.
LOT SPLIT
The division of a single lot into not more than two (2) tracts, per these regulations, without having to resubdivide said lot, providing that the resulting lots shall not again be divided without replatting.
OFF-SITE
Any premises not located within the area of the property to be subdivided, whether or not in the common ownership of the applicant for subdivision approval.
OWNER
The record owners of the fee or a vendee in possession, including any person, group of persons, firm or firms, corporation or corporations or any other legal entity having legal title to or sufficient proprietary interest in the land sought to be subdivided under the definition of "same ownership."
PERSON
Any individual or group of individuals or any corporation, general or limited partnership, joint venture, unincorporated association or governmental or quasi-governmental entity.
PLANNING AND ZONING COMMISSION
The Mount Vernon City Planning and Zoning Commission.
PLAT, FINAL
A drawing of a permanent nature showing the precise location and dimension of such features as streets, lots, easements and other elements pertinent to transfer of ownership and prepared to be recorded after approval by the Planning and Zoning Commission and including any accompanying material as described in these regulations.
PLAT, PRELIMINARY
A drawing described in these regulations showing the proposed general patterns of streets, lots and land uses within a tract to be subdivided indicating the proposed manner or layout of the subdivision to be submitted to the Planning and Zoning Commission for approval.
PLAT SKETCH
A sketch preparatory to the preliminary plat (or final plat in the case of minor subdivisions) to enable the subdivider to save time and expense in reaching general agreement with the Zoning Administrator as to the form of the plat and the objectives of these regulations.
PLOT
One (1) or more contiguous parcels of land under single ownership or control designated by its owner, at the time of filing an application for a building permit, as a tract to be used, developed or built upon as a unit. It may or may not coincide with the deed description thereof or the boundaries of the same as shown on a map thereof filed for record or otherwise and it may subsequently be subdivided into two (2) or more plots, provided all such plots conform to all the regulations of the district. The boundaries of any plot for which a building permit or certificate of occupancy is requested shall be accurately drawn on the application therefor.
PROFESSIONAL SURVEYOR
A practicing surveyor licensed in the State of Missouri.
PROPERTY OWNERS' ASSOCIATION
An association or organization, whether or not incorporated, which operates under and pursuant to recorded covenants or deed restrictions, through which each owner of a portion of a subdivision — be it a lot, parcel site, unit plot, condominium or any other interest — is automatically a member as a condition of ownership and each such member is subject to a charge or assessment for a prorated share of expense of the association which may become a lien against the lot, parcel, unit, condominium or other interest of the member.
PUBLIC UTILITIES
Publicly owned or regulated utilities, including water, sewer, telephone, gas and electric.
RESUBDIVISION
The act of amending or changing an approved final plat, including any change in any street layout or other public improvement, any lot line, the amount of land reserved for public use or the common use of lot owners or any easements shown on the approved plat.
RIGHT-OF-WAY
A strip of land occupied or intended to be occupied by a street, crosswalk, railroad, road, electric transmission line, oil or gas pipeline, water main, sanitary or storm sewer main or for another special use. The usage of the term "right-of-way" for land platting purposes shall mean that every right-of-way hereafter established and shown on a final plat is to be separate and distinct from the lots or parcels adjoining such right-of-way and are not included within the dimensions or areas of such lots or parcels. Rights-of-way intended for streets, crosswalks, water mains, sanitary sewers, storm drains or any other use involving maintenance by a public agency shall be dedicated to public use by the maker of the plat on which such right-of-way is established.
SALE or LEASE
Any immediate or future transfer of ownership or any possessory interest in land, including contract of sale, lease, devise or other transfer of an interest in a subdivision or part thereof, whether by metes and bounds or lot and block description.
SAME OWNERSHIP
Ownership by the same person, corporation, form, entity, partnership or unincorporated association; or ownership by different corporations, firms, partnerships, entities or unincorporated associations, in which a stockholder, partner or associate or a member of his/her family owns an interest in each corporation, firm, partnership, entity or unincorporated association.
SANITARY SEWER SYSTEM
A totally enclosed system consisting of an underground collection system and a treatment system so installed that when the treatment is completed, the affluent discharge meets the standard of the jurisdictional health agency.
SETBACK
The required minimum horizontal distance between the structure line and the related front, side or rear property line.
STREET
A way set aside for vehicular traffic, regardless of size or designation, but excluding private driveways serving only one (1) parcel of land.
STREET, ARTERIAL
A street or highway designed or utilized primarily for high vehicular speeds or for heavy volumes of traffic.
STREET, COLLECTOR
A street that carries or will carry intermediate volumes of traffic from local streets to arterial streets.
STREET, DEAD-END
A street or a portion of a street with only one (1) vehicular-traffic outlet. See also "cul-de-sac."
STREET, RESIDENTIAL AND MAJOR RESIDENTIAL
A street that is used or will be used primarily for access to abutting properties and which carry or will carry limited volumes of traffic.
STREET, MARGINAL ACCESS
A street that is parallel to and adjacent to arterial streets and highways and that serves to reduce the number of access points to the arterial streets and thereby increase traffic safety.
STRUCTURE
Anything constructed or erected, the use of which requires permanent location on the ground or attachment to something having a permanent location on the ground, but not including fences or public items such as utility poles, street light fixtures and street signs.
SUBDIVIDER
Any person who:
1. 
Having an interest in land, causes it, directly or indirectly, to be divided into a subdivision; or who
2. 
Directly or indirectly, sells, leases or develops or offers to sell, lease or develop or advertises for sale, lease or development any interest, lot, parcel, site, unit or plot in a subdivision; or who
3. 
Engages directly or through an agent in the business of selling, leasing, developing or offering for sale, lease or development a subdivision or any interest, lot, parcel, site, unit or plot in a subdivision; and who
4. 
Is directly or indirectly controlled by or under direct or indirect common control with any of the foregoing.
SUBDIVISION
Any land, vacant or improved, which is divided or proposed to be divided into two (2) or more lots, parcels, sites, units, plots or interests for the purposed of offer, sale, lease or development either on the installment plan or upon any and all other plans, terms and conditions, including resubdivision. Subdivision includes the division or development of residential and non-residential zoned land, whether by deed, metes and bound description, map, plat or other recorded instrument.
SUBDIVISION IMPROVEMENT AGREEMENT
A contract entered into by the applicant and the Governing Body by which the applicant promises to complete the required public improvements, as specified within these regulations, within the subdivision within a specified time period following final subdivision plat approval.
SUBDIVISION, MAJOR
All subdivisions not classified as minor subdivisions.
SUBDIVISION, MINOR
Any subdivision containing not more than five (5) lots fronting on an existing street, not involving any new street or road or the extension of municipal facilities or the creation of any public improvements and not adversely affecting the remainder of the parcel or adjoining property and not in conflict with any provision or portion of the Comprehensive Plan, Official Map, zoning regulations or these regulations.
SUBDIVISION REGULATIONS
The term "subdivision regulations" or "these regulations" shall mean the requirements stipulated in this Chapter and shall mean the lawfully adopted subdivision regulations of the City of Mount Vernon.
SUBDIVISION, STAGED
Any subdivision within a drainage sub-basin in which public sewer is projected to be developed in the future, but for which it is not feasible to provide public sewer at the time of development and meeting the requirements of these regulations.
TRACT
A lot. The term "tract" is used interchangeably with the term "lot," particularly in the context or subdivision, where a tract is subdivided into several lots, parcels, sites, plots, tracts or interests. See also "lot" and "plot."
VESTED RIGHTS
Right to initiate or continue the establishment of a use which will be contrary to a restriction or regulation coming into effect prior to or following completion of the project associated with the use.
ZONING ADMINISTRATOR
The person or persons authorized and empowered by the Board of Aldermen to administer the requirements of these zoning regulations.