A.
Type. Monuments shall be of concrete or stone with a minimum size
of four inches by four inches by 36 inches and shall be marked on
top with a one-half-inch round brass pin or a drilled hole. Markers
shall consist of iron pipes or iron or steel bars at least 24 inches
long and not less than 3/4 inch in diameter.
B.
Placement.
(1)
Monuments and markers shall be placed so that the scored or marked
point shall coincide exactly with the intersection of lines to be
marked and shall be set so that the top of the monument or marker
is level with the surface of the surrounding ground.
(2)
Monuments shall be set at the intersection of all lines forming angles
in the boundary of the subdivision.
C.
Replacement. Any monuments or markers that are removed shall be replaced
by a competent engineer at the expense of the person removing them.
A.
Minimum paving requirements. Streets (and alleys, where provided)
shall be graded, surfaced and improved to the grades and dimensions
shown on plans, profiles and cross-sections submitted by the subdivider
and approved by the Planning Commission. As a minimum, the street
pavement shall be in accordance with Table I below:
Table I
Required Pavement Construction
| |||
---|---|---|---|
Type of Street
|
Surface Type
|
Type
|
Required Pavement Construction Base Course Thickness
(inches)
|
Major traffic
|
A
|
D
|
12 + subbase if required
|
Collector
|
B
|
D
|
8
|
Minor
|
C
|
D
|
8
|
Marginal access
|
C
|
D
|
6
|
Alleys
|
B
|
D
|
8
|
(1)
Three-inch ID-2 surface course in accordance with most recent edition
of publication 408 of Pennsylvania Department of Transportation.
(2)
Two-and-one-half inch ID-2 surface course in accordance with most
recent edition of Publication 408 of the Pennsylvania Department of
Transportation.
(3)
Two-inch CP-2 surface course in accordance with most recent edition
of Publication 408 of the Pennsylvania Department of Transportation.
(4)
Stone base course in accordance with most recent edition of Publication
408 of the Pennsylvania Department of Transportation.
B.
Other improvements. The Planning Commission may require a higher
type of pavement than specified in Table I, or improvements in addition
to those set forth in the table, where it deems such to be necessary
because of prospective traffic safety of pedestrians in connection
with sidewalks, or in order to conform to conditions prevailing in
the neighborhood, in which latter case the neighborhood standard shall
generally apply. Crosswalks may be required when deemed necessary
by the Planning Commission.
(1)
Subsurface drainage. Prior to placing the street surface, adequate
subsurface drainage for the streets and all subsurface utilities as
acceptable to the Commission shall be provided or installed by the
subdivider. The size of storm drainage structures shall be computed
by using Talbot's Formula for runoff.
(2)
Slopes. Slopes of banks measured perpendicular to the center line
of the street shall not exceed three to one for fills and two to one
for cuts.
C.
In all respects in which standards for required improvements are
not set forth herein or specified by the Planning Commission hereunder,
the applicable standard requirements of the Pennsylvania State Department
of Transportation shall govern, and all work shall be performed in
the manner prescribed in the standard specifications for road construction
of said Department for type of construction under consideration.
A.
The work of constructing streets or roads, including the construction
methods and materials incident thereto, shall be subject to the approval
of the City Engineer. Final acceptance of the completed streets or
roads shall rest with the City. The subdivider shall enter into a
contract with the City which provides that in consideration of the
acceptance of the roads or streets for inclusion in the City highway
system, the subdivider agrees to construct the roads or streets in
the subdivision to the standards prescribed herein at his own expense
with no cost to the City.
B.
In the event that the owner or subdivider desires to complete the
construction of the streets after the plat is placed on record, he
shall be required to submit a cost estimate prepared by a registered
professional engineer or surveyor, setting forth all items of work
to be performed and the estimated costs. Said estimate shall be subject
to the approval of the City Engineer. A certified check or contract
performance bond issued by a surety company, subject to the approval
of the City, in an amount equal to the approved estimate to insure
the completion of the work, shall be filed with the City Council.
All construction items shall be completed within one year after the
plat is placed on record, except where bituminous paving construction
is required.
C.
When bituminous construction is required, it shall be completed within
two years after the plat is placed on record.
D.
The certified check shall be made payable to the City. In the event
the work is satisfactorily completed within the time specified, the
certified check or surety bond shall be returned.
E.
The owner or subdivider shall be required to maintain all culverts,
ditches, back-slopes and shoulders on all streets for a period of
two years after their completion. All exposed surfaces on which a
turf or sod has not been developed shall be reseeded or sodded. An
estimate of cost shall be prepared by a registered professional engineer
or surveyor, setting forth all items of work to be performed and the
estimated cost. Said estimate shall be subject to the approval of
the City Engineer. The owner or subdivider shall deposit with the
City a certified check or performance bond issued by a surety company,
in an amount not less than the cost of maintaining said streets for
a period of two years.
Where there is a public sanitary sewer system within 500 feet of the proposed subdivision, sanitary sewers shall be installed to adequately serve all lots with connections to the public system. Where lots cannot be served by the extension of an existing public sanitary sewer, the subdivider shall obtain approval of lot sizes as provided in § 352-27D hereof. In addition, individual septic tanks and disposal fields and/or neighborhood disposal systems shall be approved by the State Department of Environmental Protection.
A.
The subdivider shall provide the subdivision with a complete water
main supply system which shall be connected to a municipal water supply
or with a community water supply approved by the City Engineer and
the State Department of Environmental Protection with satisfactory
provision for the maintenance thereof; except that when such municipal
or community water supply is not available or when it is more than
1,000 feet from the area proposed to be subdivided, the subdivider
shall provide an individual water supply on each lot in the subdivision
in accordance with minimum standards approved by the Pennsylvania
State Department of Health.
B.
The plans for the installation of the mains of a water supply system
shall be prepared by the subdivider with the cooperation of the applicable
water utility company and approved by the City Engineer. Upon the
completion of the water supply installation, one copy each of the
plans for such system as built shall be filed with the Planning Commission.
An adequate storm sewer system consisting of inlets and other
underground drainage structures with approved outlets shall be constructed
where the runoff of stormwater and the prevention of erosion cannot
be accomplished satisfactorily by surface drainage facilities. Outlets
shall be approved by the owners of the properties affected and by
the Planning Commission.
The curb and gutter shall be one of the following types:
A.
Plain cement concrete in accordance with the most recent edition
of Publication 408 and applicable RC standards of the Pennsylvania
Department of Transportation.
Sidewalks shall be installed and shall have a minimum width
of four feet, except that sidewalks serving apartment houses or proposed
commercial areas shall be wider if deemed necessary by the Planning
Commission. Sidewalks may be of the following types:
A.
Concrete in accordance with the most recent edition of Publication
408,676.
Streetlights may be required when considered reasonable by the
Planning Commission. Fire hydrants installed in accordance with underwriters'
specifications shall be required under coverage by a water supply
system and shall be spaced to provide coverage within 500 feet of
any property line.
Upon the completion of the improvements in a subdivision, plans
and profiles of the same as constructed shall be filed with the Planning
Commission.
Required improvements shall be installed by the subdivider under
the supervision of the City Engineer.