Exciting enhancements are coming soon to eCode360! Learn more 🡪
Otero County, NM
 
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
The chapter shall apply to all areas of special flood hazard within the jurisdiction of Otero County, New Mexico.
The areas of special flood hazard identified by the Federal Emergency Management Agency in the current scientific and engineering report entitled, "The Flood Insurance Study (FIS) for Otero County, New Mexico, and incorporated areas," dated November 4, 2015, with accompanying Flood Insurance Rate Maps.
A floodplain development permit shall be required to ensure conformance with the provisions of this chapter.
No structure or land shall hereafter be located, altered, or have its use changed without full compliance with the terms of this chapter and other applicable regulations.
This chapter is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this chapter and another ordinance, easement, covenant, or deed restriction conflict or overlap, whichever imposes the more-stringent restrictions shall prevail.
In the interpretation and application of this chapter, all provisions shall be:
A. 
Considered as minimum requirements;
B. 
Liberally construed in favor of the governing body; and
C. 
Deemed neither to limit nor repeal any other powers granted under state statutes.
The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. On rare occasions, greater floods can and will occur, and flood heights may be increased by man-made or natural causes. This chapter does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of the community or any official or employee thereof for any flood damages that result from reliance on this chapter or any administrative decision lawfully made hereunder.