[HISTORY: Adopted by the Town Meeting of the Town of Dartmouth 11-18-1986, approved 1-6-1987; last amended 6-7-2011, approved 9-15-2011 (Art. 66 of the 2011 General By-Laws). Subsequent amendments noted where applicable.]
The purpose of this By-Law is to protect the wetlands, related water resources, and adjoining land areas in this municipality by controlling activities deemed by the Conservation Commission likely to have a significant or cumulative effect upon wetland values, including but not limited to the following: public or private water supply, groundwater, flood control, erosion and sedimentation control, storm damage prevention, water pollution prevention, fisheries, shellfish, wildlife habitat, recreation, and aesthetics (collectively, the "wetland values protected by this by-Law").
Except as permitted by the Conservation Commission or as provided for in this By-Law, no person shall remove, fill, dredge, build upon, or alter land in or within a one-hundred-foot buffer zone of the following resource areas: any freshwater wetland, coastal wetland, marsh, wet meadow, bog, swamp, or vernal pond; any bank, beach, dune, or flat; any lake, river, pond, stream, estuary, or the ocean; or any land under said waters. Included in this jurisdiction is any land subject to flooding or inundation by groundwater, surface water, tidal action, or coastal storm flowage.
A. 
The alteration of sand dunes is prohibited whenever the Conservation Commission determines that such alteration would increase the potential for flood damage.
[Added 6-1-2021 ATM by Art. 20, approved 9-27-2021]
A. 
Public services. The permit and application required by this By-Law shall not be required for maintain, repairing, or replacing, but not substantially changing or enlarging, an existing and lawfully located structure or facility used in the service of the public to provide electric, gas, water, telephone, telegraph or other telecommunication services, provided that the structure or facility is not substantially changed or enlarged, provided that written notice has been given to the Commission prior to commencement of work, and provided that the work conforms to performance standards and design specifications in regulations adopted by the Commission.
B. 
Emergencies.
(1) 
The permit and application required by this By-Law shall not apply to emergency projects necessary for the protection of the health or safety of the public, provided that the work is to be performed by or has been ordered to be performed by an agency of the Commonwealth or a political subdivision thereof, provided that advance notice, oral or written, has been given to the Commission prior to commencement of work or within 24 after commencement, provided that the Conservation Commission or its agent certifies the work as an emergency project, provided that the work is performed only for the time and place certified by the Conservation Commission for the limited purposes necessary to abate the emergency, and provided that within 21 days of commencement of any emergency project a permit application shall be filed with the Commission for review as provided in this By-Law.
(2) 
Upon failure to meet these and other requirements of the Commission, the Commission may, after notice and a public hearing, revoke or modify an emergency project approval and order restoration and mitigation measures.
(3) 
Other than stated in this section the exceptions provided in the Wetlands Protection Act shall not apply.
A. 
Written application shall be filed with the Commission to perform activities regulated by this By-Law affecting resource areas protected by this By-Law. The application shall include such information and plans as are deemed necessary by the Commission to describe proposed activities and their effects on the environment. No activities shall commence without receiving and complying with a permit issued pursuant to this By-Law.
B. 
The Commission in an appropriate case may accept as the application and plans under this By-Law the Notice of Intent and plans filed under the Wetlands Protection Act, Massachusetts General Laws Chapter 131, Section 40.
C. 
Any person desiring to know whether or not proposed activity or an area is subject to this By-Law may in writing request a determination from the Commission. Such a request for determination shall contain data and plans specified by the regulations of the Commission.
D. 
At the time of an application or request the applicant shall pay a filing fee specified in regulations of the Commission. This fee is in addition to that required by the Wetlands Protection Act, Massachusetts General Laws Chapter 131, Section 40. In addition, the Commission is authorized to require the applicant to pay costs and expenses of any expert consultant deemed necessary by the Commission to review the application or request up to a maximum of $3,500. The Commission may waive the filing fee and costs and expenses for an application or request filed by a government agency. A Revolving Consultant Fee Account shall be established in which the expert consultants fee shall be deposited to by the applicant and the Conservation Commission will draw upon to pay for the services of the expert consultants hired by the Conservation Commission.
[Amended 10-18-2022 FATM by Art. 12, approved 3-20-2023]
A. 
The Commission shall conduct a public hearing on any application or request for determination within 21 days from receipt of a completed application or request for determination. Written notice shall be given at the expense of the applicant, five working days prior to the hearing, in a newspaper of general circulation in the municipality.
B. 
The Commission shall issue its permit or determination in writing within 21 days of the close of the public hearing thereon.
C. 
The Commission in an appropriate case may combine its hearing under this By-Law with the hearing conducted under the Wetlands Protection Act, Massachusetts General Laws Chapter 131, Section 40.
D. 
The Commission shall have authority to continue the hearing to a date certain announced at the hearing, for reasons stated at the hearing, which may include receipt of additional information offered by the applicant or others, information and plans required of the applicant, deemed necessary by the Commission in its discretion, or comments and recommendations of boards and officials listed in § 360-6. In the event the applicant objects to a continuance or postponement, the hearing shall be closed and the Commission shall take action on such information as is available.
Any person filing a permit application or a request for determination with the Commission shall provide a copy thereof at the same time, by certified mail or hand delivery, to the Planning Board, Board of Appeals, Board of Health, Building Department, and Department of Public Works. The Commission shall not take final action until such boards and officials have had 14 days from receipt of notice to file written comments and recommendations with the Commission, which the Commission shall take into account but which shall not be binding on the Commission. The applicant shall have the right to receive any such comments and recommendations, and to respond to them at a hearing of the Commission, prior to final action.
A. 
If the Commission after a public hearing determines that the activities which are the subject of the application are likely to have a significant or cumulative effect upon the wetland values protected by this By-Law, the Commission within 21 days of the close of the hearing, shall issue or deny a permit for the activities requested. If it issues a permit, the Commission shall impose conditions which the Commission deems necessary or desirable to protect those values, and all activities shall be done in accordance with those conditions.
B. 
The Commission is empowered to deny a permit for failure to meet the requirements of this By-Law; for failure to submit necessary information and plans requested by the Commission; for failure to meet the design specifications, performance standards, and other requirements in regulations of the Commission; for failure to avoid or prevent unacceptable significant or cumulative effects upon the wetland values protected by this By-Law; and where no conditions are adequate to protect those values. Due consideration shall be given to any demonstrated hardship on the applicant by reason of denial, as presented at the public hearing.
C. 
A permit shall expire three years from the date of issuance. Notwithstanding the above, the Commission in its discretion may issue a permit expiring five years from the date of issuance for recurring or continuous maintenance work, provided that annual notification of time and location of work is given to the Commission. Any permit may be renewed for additional one-year periods, provided that a request for renewal is received in writing by the Commission prior to expiration.
D. 
For good cause the Commission may revoke or modify a permit issued under this By-Law after public notice and public hearing, and notice to the holder of the permit.
E. 
The Commission in an appropriate case may combine the permit or other action on an application issued under this By-Law with the Order of Conditions issued under the Wetlands Protection Act.
Upon completion of the work described in the Permit and shown on the final Plan of Record, the applicant may request in writing that a Certificate of Compliance be issued. A request for a Certificate of Compliance shall be reviewed by the Commission within 21 days of receipt thereof.
A. 
After public notice and public hearing the Commission shall promulgate rules and regulations to effectuate the purposes of this By-Law. Failure by the Commission to promulgate such rules and regulations or a legal declaration of their invalidity by a court of law shall not act to suspend or invalidate the effect of this By-Law.
B. 
At a minimum these regulations shall define key terms in this By-Law not inconsistent with this By-Law.
The following definitions shall apply in the interpretation and implementation of this By-Law.
A. 
The term "person" shall include any individual, group of individuals, association, partnership, corporation, company, business organization, trust, estate, the Commonwealth or political subdivision thereof to the extent subject to town By-Laws, administrative agency, public or quasi-public corporation or body, this municipality, and any other legal entity, its legal representatives, agents, or assigns.
B. 
The term "alter" shall include, without limitation, the following activities when undertaken to, upon, within or affecting resource areas protected by the By-Law:
(1) 
Removal, excavation or dredging of soil, sand, gravel, or aggregate materials of any kind;
(2) 
Changing of pre-existing drainage characteristics, flushing characteristics, salinity, distribution, sedimentation patterns, flow patterns, or flood retention characteristics.
(3) 
Drainage or other disturbance of water level or water table;
(4) 
Dumping, discharging or filling with any material which may degrade water quality;
(5) 
Placing of fill, or removal of material, which would alter elevation;
(6) 
Driving of piles, erection or repair of buildings, or structures of any kind;
(7) 
Placing of obstructions or objects in water;
(8) 
Destruction of plant life including cutting of trees;
(9) 
Changing water temperature, biochemical oxygen demand, or other physical or chemical characteristics of water;
(10) 
Any activities, changes or work which may cause or tend to contribute to pollution of any body of water or groundwater.
As part of a Permit issued under this By-Law, in addition to any security required by any other municipal or state board, agency or official, the Commission may require that the performance and observance of the conditions imposed hereunder be in secured wholly or in part by one or more of the methods described below:
A. 
By a proper bond or deposit of money or negotiable securities or other undertaking of financial responsibility sufficient in the opinion of the Commission;
B. 
By a conservation restriction, easement or other covenant enforceable in a court of law, executed and duly recorded by the owner of record, running with the land to the benefit of this municipality whereby the permit conditions shall be performed and observed before any lot may be conveyed other than by mortgage deed.
A. 
The Commission, its agents, officers, and employees shall have authority to enter upon privately owned land for the purpose of performing their duties under this By-Law and may take or cause to be made such examinations, surveys or sampling as the Commission deems necessary.
B. 
The Commission shall have authority to enforce this By-Law, its regulations, and Permits issued thereunder by violation notices, administrative orders, and civil and criminal court actions.
C. 
Upon request of the Commission, the Select Board and the Town Counsel shall take legal action for enforcement under civil law. Upon request of the Commission the chief of police shall take legal action for enforcement under criminal law.
D. 
Municipal boards and officers, including any police officer or other officer having police powers, shall have authority to assist the Commission in enforcement.
E. 
Any person who violates any provision of this By-Law, regulations thereunder, or permits issued thereunder, shall be punished by a fine of not more than $300. Each day or portion thereof during which a violation continues shall constitute a separate offense, and each provision of the By-Law, regulations, or permit violated shall constitute a separate offense.
F. 
In the alternative to criminal prosecution the Commission may elect to utilize the noncriminal disposition procedure set forth in Massachusetts General Laws Chapter 40, Section 21D.
A. 
The applicant for a Permit shall have the burden of proving by a preponderance of the credible evidence that the work proposed in the application will not have unacceptable significant or cumulative effects upon the wetland values protected by this By-Law.
B. 
Failure to provide adequate evidence to the Commission supporting this burden shall be sufficient cause for the Commission to deny a Permit or grant a Permit with conditions.
This By-Law is adopted under the Home Rule Amendment of the Massachusetts Constitution and the Home Rule statutes, independent of the Wetlands Protection Act, Massachusetts General Laws Chapter 131, Section 40, and regulations thereunder.
The invalidity of any section or provision of this By-Law shall not invalidate any other section or provision thereof, nor shall it invalidate any Permit or Determination which previously has been issued.