Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of New Britain, PA
Bucks County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Ord. 2002-05-02, 5/20/2002, § 900]
All provisions of this chapter shall be administered by the Board or its officially designated representatives. All matters relating to this chapter shall be submitted to the Township, which will handle the matter in accordance with current policies, procedures, and guidelines.
[Ord. 2002-05-02, 5/20/2002, § 901]
The Township shall keep a public record of its correspondence, findings, recommendations, and actions relating to plans filed for review, in accordance with applicable laws and ordinances.
[Ord. 2002-05-02, 5/20/2002, § 902]
1. 
No application for preliminary or final plan approval shall be accepted and processed until the fees and/or escrow deposit have been paid pursuant to the Township's current Fee Schedule and Professional Services Agreement.
2. 
The Board shall adopt and amend by resolution a schedule of fees and expenses, payable by the applicant to the Township and for the administrative costs associated with the Township's consultants' fees.
3. 
The Board shall adopt and amend by resolution a schedule of escrow deposits to be paid by the applicant to the Township at the time of filing of an application, sufficient to pay all Township expenditures anticipated in the course of its review and disposition of plans.
A. 
Costs incurred by the Township in excess of the escrowed amount shall be paid by the applicant prior to the granting of approvals or permits.
B. 
If costs incurred by the Township are less than the escrowed amount, the difference shall be refunded to the applicant following disposition of the plans.
C. 
If the escrow deposit falls below a minimum amount determined by resolution of the Board, the applicant shall replenish the escrow deposit up to the required minimum.
4. 
Township expenditures subject to escrow include, but are not limited, to the following:
A. 
Engineering and other technical services such as plan review, construction inspections, and attendance at meetings related to the plan.
B. 
Materials and facilities tests.
C. 
Services of the Township Solicitor in reviewing and/or preparing documents related to the plan and attendance at any meetings relating to the plan.
D. 
Planning consultant reviews and attendance at any meetings related to the plan.
5. 
Disputes. The procedures for fee/escrow disputes shall comply with §§ 503 and 510 of the MPC, as amended.
[Ord. 2002-05-02, 5/20/2002, § 903]
1. 
All improvements shall be constructed and/or dedicated without cost to the Township as required by this chapter and/or as stipulated in the Development Agreement in a manner approved by the Township consistent with sound construction methods. These improvements include but are not limited to:
A. 
Grading.
(1) 
Grading of roadways and street rights-of-way and grading of slopes adjacent to roadways and street rights-of-way.
(2) 
Grading of all draining swales on public or private property and grading of individual lots, to establish positive drainage away from buildings to eliminate low spots.
(3) 
Implementation and maintenance of soil erosion control and sedimentation control facilities.
(4) 
Replacement of topsoil and vegetative restoration in disturbed areas not stabilized with building, paving or other non-vegetative ground cover.
(5) 
Removal of temporary soil erosion and sedimentation control facilities when they are no longer required.
B. 
Street or road sub-base, base and paving.
C. 
Curbs, gutters, driveway aprons and parking facilities.
D. 
Sidewalks, crosswalks, pathways and bike paths.
E. 
Underground facilities for electric, telephone and television cable lines.
F. 
Storm sewer, drainage facilities and easements.
G. 
Public sanitary sewer system.
H. 
Public or centralized water supply and distribution systems, including but not limited to wells, pumping equipment, water laterals, sub-mains, storage tanks and equipment systems.
I. 
Street name signs at all street intersections and official traffic control signs and markings.
J. 
Permanent monuments and lot pins.
K. 
Fire hydrants.
L. 
Street trees, landscaping.
M. 
Open space improvements and/or recreational facilities, buffer or screen plantings.
N. 
Street lights.
2. 
Upon final plan approval, and in-lieu-of the completion of the improvements required as a condition for the final approval of a plat, the developer shall provide for deposit with the Township financial security in an amount sufficient to cover the costs of all such improvements or common amenities as shown on the approved plans. The form of financial security shall be either by letter of credit, cash deposit or tri-party agreement with a federal or commonwealth chartered lending institution, unless some other form is approved by the Board.
[Ord. 2002-05-02, 5/20/2002, § 904]
1. 
The developer shall construct and install, at no expense to the Township, the improvements specified in this chapter and as shown on the final plan approval. Construction and installation of such facilities and utilities shall be subject to inspection by the Township Engineer and other public or utility officials during the progress of the work.
2. 
During the construction and installation of all facilities and utilities required by this chapter, the developer shall ensure that access to the job site from a public road shall be kept clear and free of all obstructions and otherwise in a passable condition to all areas of the job site for emergency, fire and police vehicles. In the event of a dispute, passable access for the foregoing purposes shall be determined by the Township Engineer and Township Fire Marshal.
[Ord. 2002-05-02, 5/20/2002, § 905]
1. 
The following principles of subdivision and land development, general requirements and the minimum standards of design, shall be observed by the developer in all instances:
A. 
It is the developer's responsibility to comply with all applicable plan requirements, ordinances, statutes and regulations of New Britain Township, Bucks County, the Commonwealth of Pennsylvania, and the United States of America.
B. 
The proposed subdivisions and/or land developments shall be coordinated with existing nearby development so that the area as a whole may develop harmoniously. Provisions shall be made to ensure that the street patterns included in a proposed subdivision shall compliment existing or proposed streets shown on the current official Township street and road map and/or nearby approved developments.
2. 
In most cases where precise design standards are not specified in this chapter, the design standards of the following organizations shall govern where applicable:
A. 
Roads and Streets. The Pennsylvania Department of Transportation.
B. 
Sanitary Sewer. The Pennsylvania Department of Environmental Protection, Bucks county Department of Health, and servicing municipal authority.
C. 
Water. The Pennsylvania Department of Environmental Protection, Bucks County Department of Health, Delaware River Basin Commission, and servicing municipal authority.
D. 
Soil and Erosion Control. The Bucks County Soil Conservation District, Department of Environmental Protection, U.S. Department of Agriculture, Soil Conservation Service, New Britain Township.
E. 
General Engineering. American Society of Civil Engineers, Army Corps of Engineers, Federal Emergency Management Association, New Britain Township Engineer.
[Ord. 2002-05-02, 5/20/2002, § 906]
1. 
Preventive Remedies.
A. 
In addition to other remedies, the Township may institute and maintain appropriate actions by law or in equity to restrain, correct or abate violations, to prevent unlawful construction, to prevent unlawful subdivision and/or land development, to recover damages and to prevent illegal occupancy of a building, structure or lot.
B. 
The Township may refuse to issue any permit or grant any approval necessary to further improve any real property that has been developed or has resulted from a subdivision and/or land development in violation of this chapter. As an additional condition for the issuance of any permit or approval, the Township may require compliance with the conditions that would have been applicable to the property at which time the applicant acquired it.
C. 
Violations of any terms/conditions of an approved final plan or any terms/conditions of the Development/Financial Security Agreements authorized by this chapter shall be deemed violations of this chapter.
2. 
The procedure for enforcement remedies shall comply with §§ 515.1 and 515.3 of the MPC, as amended.