[Adopted 4-8-1993 by Ord.
No. 197]
(a)ย
Commercial.
Plan review and administration base fee
|
$42
| |
All required and final inspections
|
$42
| |
Fixtures, appliances, floor drains
|
$3.15
| |
Stack and vents
|
$3.15
| |
Sewers (sanitary, if applicable)
|
$42
| |
Water service
|
$5.25
| |
Connection building/sewer drain
|
$5.25
| |
Sub-soil drains
|
$5.25
| |
Sewage ejectors, sumps, etc.
|
$5.25
| |
Water piping less than 1 inch
|
$10.50
| |
Water piping 1 inch and over
|
$21.00
| |
Backflow preventer
|
$5.25
|
(b)ย
Residential.
Addition/remodel
|
$81.90
| |
New residence
|
$81.90
| |
New residence/addition with underground
|
$99.75
| |
Single inspection
|
$42
| |
Sewer (sanitary, if applicable)
|
$42
|
[Adopted 4-8-1993 by Ord.
No. 198]
(a)ย
Single inspection permit fee: $42.
(b)ย
Valuation.
0-1,000
|
$42
| |
1,001-10,000
|
$42 + $1.05/100 over 1,000
| |
10,001 and up $126 + $2.01/1,000 over 10,000
| ||
Mobile home set up
|
$63
| |
Demolition
|
$42
| |
Valuation is based on following: For one- and two-family and
accessory buildings: Calculate a value from the residential cost schedule
and use that value with the Rate Table to determine the fee.
|
(c)ย
Residential cost schedule.
Base house
|
$56 per square foot
| ||
Basement, unfinished
|
$11 per square foot
| ||
Basement, finished
|
$15 per square foot
| ||
Bath, additional
|
$2,000 each
| ||
Half bath, additional
|
$1,000 each
| ||
Fireplace and chimney
|
$2,000 each
| ||
2nd fireplace and chimney
|
$1,200 each
| ||
2nd masonry chimney
|
$1,500 each
| ||
Porches, breezeways, garages
|
$13 per square foot
| ||
Sheds
|
$7 per square foot
| ||
Pole buildings
|
$7 per square foot
| ||
Wood decks
|
$6 per square foot
| ||
Carports
|
$11 per square foot
| ||
Residential additions.
| |||
First floor
|
$40 per square foot
| ||
Second floor
|
$35 per square foot
| ||
Miscellaneous improvements
| |||
Pools
|
contract price of pool
| ||
Other
|
actual cost of labor and materials or estimated contract price
|
(d)ย
Reinspection charge: $42 per inspection or $42 per hour, whichever
is greater. An investigation fee will be charged for work started
without a permit.
[Adopted 4-8-1993 by Ord.
No. 198]
(a)ย
Building valuation.
0-1,000
|
$42
| |
1,001-10,000
|
$42 + $10.50/1,000 over $1,000
| |
10,001 and up
|
$126 + 2.62/$1,000 over $10,000
|
(b)ย
Commercial plan review.
For building valuation of zero to $500,000
|
Multiply by 0.00126
| |
For building valuation in excess of $500,000
|
Multiply by 0.00021
|
(c)ย
Commercial square foot cost table. To be used with the Building Permit
and Plan Review Fee Schedules for computation of the total cost of
improvement. The table below outlines the base cost per square foot
for any given use/type of construction combination. (These figures
are not intended to reflect actual cost of construction, but are only
used as a basis for determination of fees related to services rendered
for projects.)
(d)ย
Type of construction.
Use
|
1A
|
1B
|
2A
|
2B
|
2C
|
4
|
3A
|
3B
|
5A
|
5B
| |
---|---|---|---|---|---|---|---|---|---|---|---|
Group
| |||||||||||
A
|
70.50
|
69.50
|
67.50
|
66.66
|
62.50
|
61.00
|
58.00
|
56.00
|
51.00
|
46.00
| |
B
|
51.00
|
50.00
|
48.00
|
46.00
|
44.00
|
42.00
|
40.00
|
40.00
|
35.00
|
33.00
| |
E
|
56.00
|
55.00
|
53.00
|
51.00
|
48.00
|
47.00
|
45.00
|
44.00
|
39.00
|
38.00
| |
F
|
38.00
|
36.00
|
34.00
|
33.00
|
30.00
|
28.00
|
27.00
|
26.00
|
22.00
|
20.00
| |
H
|
39.00
|
37.00
|
35.00
|
34.00
|
31.00
|
30.00
|
28.00
|
27.00
|
23.00
|
22.00
| |
I
|
68.00
|
67.00
|
65.00
|
63.00
|
61.00
|
59.00
|
57.00
|
57.00
|
51.00
|
39.00
| |
M
|
49.00
|
47.00
|
46.00
|
45.00
|
41.00
|
40.00
|
38.00
|
38.00
|
32.00
|
31.00
| |
R
|
52.00
|
51.00
|
50.00
|
49.00
|
46.00
|
45.00
|
43.00
|
43.00
|
37.00
|
35.00
| |
S
|
39.00
|
37.00
|
35.00
|
34.00
|
31.00
|
31.00
|
28.00
|
28.00
|
23.00
|
22.00
|
For buildings more than two stories, the table figure per square
foot for all stories must be adjusted downward 2% for each story over
two.
|
Basements and cellars must be computed separately at 20% of
table cost.
|
[Adopted 4-8-1993 by Ord.
No. 199]
(a)ย
Commercial.
Plan review and administration base fee
|
$42
| |
All required and final inspections
|
$42
| |
Gas oil burning equipment new and/or conversion
|
$26.25
| |
Chimney, factory-built (class A)
|
$26.25
| |
Duct system/hydronic piping
|
$21
| |
Solar equipment system plus piping system
|
$15.75
| |
Gas piping (new installation)
|
$5.25
| |
Exhaust fan/power exhaust
|
$5.25
| |
Flue damper/vent damper
|
$5.25
| |
L.P.G. and fuel oil tans (piping fee inc.)
|
$15.75
| |
Central air conditioning and heat pump
|
$15.75
|
(b)ย
Residential.
Addition/remodel
|
$81.90
| |
New residence
|
$81.90
| |
New residence/addition with underground
|
$99.75
| |
Single inspection
|
$42
|
[Adopted 4-8-1993 by Ord.
No. 200]
[The following are fees for electrical permits:]
Base permit fee (plus permit unit charge)
|
$21
| |
Service 200 amp or less
|
$15.75
| |
Service 210 thru 990 amp
|
$47.25
| |
Service 1,000 amp or more
|
$78.75
| |
Circuits
|
$3.15
| |
Lighting fixtures per 25 and fraction thereof
|
$6.30
| |
Dishwasher, garbage disposal and range hood
|
$4.20
| |
Furnace, unit heater
|
$5.25
| |
Elec. heating units (baseboard)
|
$4.20
| |
Power outlets (ranges, dryers, etc.)
|
$7.35
| |
Signs - per circuit
|
$5.25
| |
Feeders-bus ducts, etc. per 50 feet and fraction
|
$6.30
| |
Mobile home sites
|
$4.20
| |
Recreational vehicle sites
|
$4.20
| |
KVA and HP equip, to 20 KVA or HP
|
$5.25
| |
21 to 50 KVA or HP
|
$10.50
| |
51 KVA or HP and over
|
$15.75
| |
Fire alarm - to 10 stations and horns
|
$52.50
| |
Fire alarm - over 10 stations and horns
|
$5.25
| |
Final inspection
|
$21
| |
Letter of certification
|
$10.50
| |
Special inspections (sale of property)
|
$31.50
| |
Hourly fee
|
$31.50
| |
Flat fee
|
$89.25
|