Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Lower Mount Bethel, PA
Northampton County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
[Ord. 2014-02, 6/2/2014]
1. 
The identified floodplain area shall be:
A. 
Any areas of Lower Mount Bethel Township, classified as Special Flood Hazard Areas (SFHAs) in the Flood Insurance Study (FIS) and the accompanying Flood Insurance Rate Maps (FIRMs) dated July 16, 2014, and issued by the Federal Emergency Management Agency (FEMA) or the most recent revision thereof, including all digital data developed as part of the Flood Insurance Study.
2. 
The above-referenced FIS and FIRMs, and any subsequent revisions and amendments, are hereby adopted by Lower Mount Bethel Township and declared to be a part of this chapter.
[Ord. 2014-02, 6/2/2014]
1. 
The identified floodplain area shall consist of the following specific areas:
A. 
The Floodway Area shall be those areas identified in the FIS and the FIRM as floodway and which represent the channel of a watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without increasing the water surface elevation by more than one foot at any point. This term shall also include floodway areas which have been identified in other available studies or sources of information for those special flood hazard areas where no floodway has been identified in the FIS and FIRM.
(1) 
Within any floodway area, no encroachments, including fill, new construction, substantial improvements, or other development shall be permitted unless it has been demonstrated through hydrologic and hydraulic analysis performed in accordance with standard engineering practice that the proposed encroachment would not result in any increase in flood levels within the Township during the occurrence of the base flood discharge.
(2) 
Within any floodway area, no new construction or development shall be allowed, unless the appropriate permit is obtained from the Department of Environmental Protection Regional Office.
B. 
The AE Area/District shall be those areas identified as an AE Zone on the FIRM included in the FIS prepared by FEMA for which base flood elevations have been provided.
(1) 
The AE Area adjacent to the floodway shall be those areas identified as an AE Zone on the FIRM included in the FIS prepared by FEMA for which base flood elevations have been provided and a floodway has been delineated.
(2) 
AE Area without floodway shall be those areas identified as an AE Zone on the FIRM included in the FIS prepared by FEMA for which base flood elevations have been provided but no floodway has been determined.
(a) 
No permit shall be granted for any construction, development, use, or activity within any AE Area/District without floodway unless it is demonstrated that the cumulative effect of the proposed development would not, together with all other existing and anticipated development, increase the BFE more than one foot at any point.
(b) 
No new construction or development shall be located within the area measured 50 feet landward from the top of bank of any watercourse, unless the appropriate permit is obtained from the Department of Environmental Protection Regional Office.
C. 
The A Area/District shall be those areas identified as an A Zone on the FIRM included in the FIS prepared by FEMA and for which no base flood elevations have been provided. For these areas, elevation and floodway information from other federal, state, or other acceptable sources shall be used when available. Where other acceptable information is not available, the base flood elevation shall be determined by using the elevation of a point on the boundary of the identified floodplain area which is nearest the construction site.
2. 
In lieu of the above, the municipality may require the applicant to determine the elevation with hydrologic and hydraulic engineering techniques. Hydrologic and hydraulic analyses shall be undertaken only by professional engineers or others of demonstrated qualifications, who shall certify that the technical methods used correctly reflect currently accepted technical concepts. Studies, analyses, computations, etc., shall be submitted in sufficient detail to allow a thorough technical review by the municipality.
[Ord. 2014-02, 6/2/2014]
The identified floodplain area may be revised or modified by the Board of Supervisors where studies or information provided by a qualified agency or person documents the need for such revision. However, prior to any such change to the special flood hazard area, approval must be obtained from FEMA. Additionally, as soon as practicable, but not later than six months after the date such information becomes available, the Township shall notify FEMA of the changes to the special flood hazard area by submitting technical or scientific data. See § 8-501, Subsection 2, for situations where FEMA notification is required.
[Ord. 2014-02, 6/2/2014]
Should a dispute concerning any identified floodplain boundary arise, the application shall be forwarded to the Township Engineer. An initial determination shall be made by the Township Engineer within 60 days of the Township Engineer's receipt of such a dispute in writing from the party aggrieved by the Floodplain Administrator's or other authorized municipal employee or professional consultant's review. Any party aggrieved by the above-referenced determination of the Township Engineer may appeal to the Township Zoning Hearing Board in accordance with the procedures set forth in § 8-311 of this chapter. The burden of proof shall be on the appellant to establish a floodplain boundary inconsistent with the Township Engineer's determination.
[Ord. 2014-02, 6/2/2014]
Prior to development occurring in areas where annexation or other corporate boundary changes are proposed or have occurred, the Township shall review flood hazard data affecting the lands subject to boundary changes. The Township shall adopt and enforce floodplain regulations in areas subject to annexation or corporate boundary changes which meet or exceed those in 44 CFR 60.3.