[HISTORY: Adopted by the City Council of
the City of Crystal Lake 1-19-1993 as amended 4-26-2005 by Ord. No. 5930 (Art. III, Ch. II, Section
J, of the 1993 Code); amended in its entirety 2-20-2018 by Ord. No. 7441, effective 5-1-2018. Subsequent amendments noted where applicable.]
There shall be established a permit fee schedule as follows.
As used in this chapter, the following terms shall have the
meanings indicated:
Any construction, retrofit or renovation to an existing structure
that includes installing a new foundation.
Any construction, retrofit or renovation to an existing structure
other than repair or addition that requires a permit. Also, a change
in a building, electrical, gas, mechanical or plumbing system that
involves any extension, addition or change to the arrangement, type
or purpose of the original installation that requires a permit.
See the definition for "dwelling unit" in Chapter 650, Unified Development Ordinance.
See definition for "square footage."
A wireless facility that meets both of the following qualifications:
Each antenna is located inside an enclosure of no more than
six cubic feet in volume or, in the case of an antenna that has exposed
elements, the antenna and all of its exposed elements could fit within
an imaginary enclosure of no more than six cubic feet; and
All other wireless equipment attached directly to a utility
pole associated with the facility is cumulatively no more than 25
cubic feet in volume. The following types of associated ancillary
equipment are not included in the calculation of equipment volume:
electric meter, concealment elements, telecommunications demarcation
box, ground-based enclosures, grounding equipment, power transfer
switch, cut-off switch, and vertical cable runs for the connection
of power and other services.
The square footage, where used as the basis of a building
permit fee, shall be computed from the outside perimeters of such
buildings, structures, or space. All floor levels are to be added
in computing the total square footage.
The reasonable value of all services, labor, materials, and
use of scaffolding and other appliances or devices entering into and
necessary to the prosecution and completion of the work ready for
occupancy.
A.
New construction.
(1)
The permit fee for new building construction shall be calculated
using the following formula:
Permit Fee = GA x SFCC x PFM
|
Where:
| ||
▪
|
GA is the gross area of new building
| |
▪
|
SFCC is the square foot construction cost as calculated using
the Building Valuation Data update published by the International
Code Council (ICC) and adopted by City Council resolution
| |
▪
|
PFM is the Permit Fee Multiplier found in § 241-3A(2)
|
(2)
The permit fee multiplier is as follows:
Type of Construction
|
Multiplier
|
---|---|
Residential, including duplex and townhouse construction
|
0.007
|
Commercial, industrial, office, church, institutional and multifamily
|
0.0051
|
The permit fee multiplier may be administratively adjusted based
on market conditions; including CPI, ICC building valuation data,
and other factors, to better correlate with area permit fees, provided
that such adjustment shall be made not more than once annually prior
to May 1 of any year and that the adjusted multiplier shall be posted
on the City's website and available for inspection at the office of
the City Manager.
|
(3)
For the purposes of calculating permit fees, building additions that
include installing a new foundation will be calculated using the new
construction fee formula. Building alterations that do not include
installing a new foundation, such as adding a second story onto a
building, will be treated as an alteration for the purposes of calculating
fees.
(4)
The calculation of the new building construction includes fees for
building reviews and fees for electrical, plumbing, and heating, ventilation,
and air conditioning (HVAC). Additional fees for these services shall
not be included.
B.
Alteration permit. The permit fee for alteration permits shall be:
Valuation
|
Fee
|
---|---|
Up to $5,000
|
$40
|
$5,001 to $10,000
|
$50
|
Over $10,000
|
$50 + $4 per $1,000, or portion thereof, over $10,000
|
C.
Flat fees for miscellaneous projects.
(1)
The following table shall be used to calculate fees for miscellaneous
projects contained in this section:
Tier
|
Fee Effective
May 1, 2018
|
Fee Effective
May 1, 2019
|
Fee Effective
May 1, 2020
|
Fee Effective
May 1, 2021
|
---|---|---|---|---|
Tier 1
|
$35
|
$40
|
$45
|
$50
|
Tier 2
|
$40
|
$45
|
$50
|
$55
|
Tier 3
|
$50
|
$55
|
$60
|
$65
|
(2)
The following permit types are Tier 1 permits; this fee includes
a minimum of one inspection:
(3)
The following permit types are Tier 2 permits; this fee includes
a minimum of two inspections and a review as necessary:
(4)
The following permit types are Tier 3 permits; this fee includes
a detailed plan review, and a minimum of two inspections:
D.
Building alteration plan review. Building alteration plan review
fees shall be as follows, per dwelling unit, or units, except that
each separate office, store, or business within a building shall be
considered a separate unit:
(1)
Commercial (including industrial, office, church, institutional and
multifamily):
Square Footage
|
Fee
|
---|---|
0 to 1,000
|
$50
|
1,001 to 3,000
|
$100 plus $0.0400 per square foot
|
3,001 to 20,000
|
$150 plus $0.0400 per square foot
|
20,001 to 50,000
|
$200 plus $0.0400 per square foot
|
50,001 to 100,000
|
$250 plus $0.0400 per square foot
|
Over 100,000
|
$300 plus $0.0400 per square foot
|
(2)
Residential (detached single-family home, townhouse, and duplex):
Square Footage
|
Fee
|
---|---|
0 to 400
|
$25
|
401 to 1,000
|
$30
|
1,001 to 5,000
|
$35
|
Over 5,000
|
$50
|
E.
Electrical alteration plan review. Electrical alteration plan review
fees shall be as follows, per dwelling unit, or units, except that
each separate office, store, or business within a building shall be
considered a separate unit:
[Amended 9-15-2020 by Ord. No. 7653]
(1)
Commercial (including industrial, office, church, institutional and
multifamily):
Square Footage
|
Fee
|
---|---|
0 to 1,000
|
$50
|
1,001 to 3,000
|
$100
|
3,001 to 20,000
|
$150
|
20,001 to 50,000
|
$200
|
50,001 to 100,000
|
$250
|
Over 100,000
|
$300
|
(2)
Residential (detached single-family home, townhouse and duplex):
Square Footage
|
Fee
|
---|---|
0 to 400
|
$20
|
401 to 1,000
|
$25
|
1,001 to 5,000
|
$30
|
Over 5,000
|
(3)
Automatic fire alarm system (per $1,000 of valuation): $15.
F.
Plumbing alteration plan review. Plumbing alteration plan review
fees shall be as follows, per dwelling unit or units, except that
each separate office, store, or business within a building shall be
considered a separate unit:
[Amended 9-15-2020 by Ord. No. 7653]
(1)
Commercial (including industrial, office, church, institutional and
multifamily):
Square Footage
|
Fee
|
---|---|
0 to 1,000
|
$50
|
1,001 to 3,000
|
$100
|
3,001 to 20,000
|
$150
|
20,001 to 50,000
|
$200
|
50,001 to 100,000
|
$250
|
Over 100,000
|
$300
|
(2)
Residential (detached single-family home, townhouse and duplex):
Square Footage
|
Fee
|
---|---|
0 to 400
|
$20
|
401 to 1,000
|
$25
|
1,001 to 5,000
|
$30
|
Over 5,000
|
$40
|
(3)
Water and sewer tap inspection fees:
Item
|
Fee
|
---|---|
Water tap inspection
|
$150
|
Sewer tap inspection
|
$150
|
G.
Heating, ventilating, and air conditioning (HVAC) alteration plan
review. Heating, ventilating and air conditioning alteration plan
review fees shall be as follows, per dwelling unit or units, except
that each separate office, store, or business within a building shall
be considered a separate unit:
[Amended 9-15-2020 by Ord. No. 7653]
(1)
Commercial, industrial, office, church, institutional and multifamily:
Square Footage
|
Fee
|
---|---|
0 to 1,000
|
$50
|
1,001 to 3,000
|
$100
|
3,001 to 20,000
|
$150
|
20,001 to 50,000
|
$200
|
50,001 to 100,000
|
$250
|
Over 100,000
|
$300
|
(2)
Residential (detached single-family home, townhouse and duplex):
Square Footage
|
Fee
|
---|---|
0 to 400
|
$20
|
401 to 1,000
|
$25
|
1,001 to 5,000
|
$30
|
Over 5,000
|
$40
|
H.
Parking lot review and inspection fee: $150.
I.
Elevators, dumbwaiters, escalators, moving walks and hoisting equipment.
Elevator, dumbwaiter, escalator, moving walk and hoisting equipment
fees shall be as follows:
[Amended 9-15-2020 by Ord. No. 7653]
Item
|
Fee
|
---|---|
New permit inspections for elevators, escalators, platform lifts,
dumbwaiters, and dock lifts
|
$225
|
Reinspection for existing elevators, escalators, platform lifts,
dumbwaiters, and dock lifts
|
$75
|
Elevator plan review
|
$100
|
J.
Certificates of occupancy.
(1)
Schedule of fees.
Fee Effective May 1, 2018
|
Fee Effective May 1, 2019
|
Fee Effective May 1, 2020
|
Fee Effective May 1, 2021
| |
---|---|---|---|---|
Certificate of occupancy
|
$50
|
$60
|
$70
|
$80
|
(2)
Temporary occupancy with a hold-harmless agreement signed by the
owner and Building Commissioner, or his/her designee, for any unfinished
items of a minor or nonhazardous nature when approved only by the
Community Development Department official: $35.
K.
In-ground swimming pool review and inspection: $150.
L.
Building demolition, flat fee per building: $150.
M.
Moving of buildings, with bond and insurance as required by ordinance:
$150.
N.
Starting work without a permit. A charge of 100% of the permit fee
will be added if work is started without a permit.
O.
Performance/completion deposit requirement.
(1)
Every applicant shall post with the City, at the time of issuance
or approval of a temporary occupancy certificate, a performance/completion
deposit in the following amounts:
(a)
All building permits when a temporary occupancy certificate
is granted:
Use
|
Cost/Size
|
Fee
|
---|---|---|
Residential
|
Any new
|
$1,500
|
Residential
|
Addition valued over $10,000
|
$500
|
Commercial/Industrial/Other
|
0 - 2,500 square feet
|
$1,500
|
Commercial/Industrial/Other
|
2,501 square feet - 15,000 square feet
|
$3,000
|
Commercial/Industrial/Other
|
15,001 square feet - 75,000 square feet
|
$5,000
|
Commercial/Industrial/Other
|
75,001 square feet - 250,000 square feet
|
$10,000
|
Commercial/Industrial/Other
|
250,001 square feet and over
|
$15,000
|
(2)
The City shall have the right, at all times at its option, to draw
on the performance/completion deposit for costs, including, without
limitation, legal fees and administrative expenses incurred or to
be incurred by the City in exercising any of its rights under the
City Code of Crystal Lake in the event:
(a)
The applicant undertakes any work in violation of any provision
of the City Code or any permit issued or plan approved pursuant to
the City Code; or
(b)
The applicant fails or refuses to complete the work or conditions authorized by any temporary occupancy certificate in accordance with all plans and conditions approved in connection with a temporary occupancy certificate. Once it reaches the expiration, 25% of the initial deposit will be deducted monthly until the work is completed or the deposit is exhausted. Once the deposit has been depleted, the applicant will be subject to citations and fines outlined in § 248-2. The City's determination of such costs shall be based either on costs actually incurred by the City or reasonable estimates of costs to be incurred.
[Amended 9-15-2020 by Ord. No. 7653]
(3)
The City shall return any unused portion of the performance/completion
deposit to the applicant without interest, as follows:
(a)
For all temporary occupancy certificates: after completion of
all work and conditions within the approved time frame.
(4)
A deposit posted pursuant to this subsection shall be forfeited to
the City in full if the permittee does not complete the conditions
or requirements of a temporary occupancy certificate on or before
the date specified within the temporary occupancy certificate.
P.
Signs. The fee to be charged for permits issued for the erection,
construction, or alteration of any sign or other advertising structure
shall be as follows:
Item
|
Fee
|
---|---|
Alteration of existing sign
|
$20
|
Fixed canopy and fixed awning signs
|
$20, plus $0.10 per square foot of plan area, horizontally projected
|
Illuminated signs and illuminated awning signs
|
$30, plus $0.10 per square foot of gross surface area of each
face thereof
|
Nonilluminated signs (unless temporary or limited duration)
|
$25, plus $0.10 per square foot of gross surface area of each
face thereof
|
Retractable canopies and awnings
|
$20
|
Limited duration signs
|
$20
|
New or altered illuminated sign, electrical inspection
|
$25 per sign
|
Q.
Small wireless facilities. Permit application fees for small wireless
facilities shall be as follows:
Item
|
Fee
|
---|---|
Small wireless facility with new pole
|
$1,000
|
1 small wireless facility on an existing utility pole
|
$650
|
2 or more small wireless facilities on an existing utility pole
|
$350 per small wireless facility
|
R.
Permit extension.
(1)
Fee for permit extensions.
Item
|
Fee
|
---|---|
First 6-month extension
|
25% of original permit fee
|
Second 6-month extension
|
50% of original permit fee
|
Third 6-month extension and every extension thereafter
|
100% of original permit fee
|
(2)
The Building Commissioner or his/her designee may waive the permit
extension fee.
S.
Annual fee adjustments.
(1)
Fees in § 241-3 shall be adjusted on May 1 of each calendar year using the December to December Consumer Price Index percentage change for the Chicago-Gary-Kenosha area (the "CPI") as determined by the United States Bureau of Labor Statistics, unless otherwise provided for in § 241-3. All adjustments will be rounded up to the nearest cent. If any CPI percentage change is less than zero, then the fees shall remain the same.
(3)
For the purposes of calculating future fee adjustments, the baseline year for all fees in § 241-3 is 2018.
(4)
If the CPI is discontinued or replaced, such other governmental cost-of-living
index or computation which replaces the CPI shall be used in order
to obtain substantially the same result as would be obtained if the
CPI had not been discontinued or replaced.
The following fees shall apply for the following planning services.
The application fee for temporary use permit applications filed after
the applicant has implemented the temporary use shall be twice the
fees stated in this section. Additionally, this does not prevent the
City from taking further actions authorized by the Code of Ordinances
of the City.
Request
|
Fee
|
---|---|
Administrative variation
|
$25
|
Annexation
|
$750/acre
|
Appeal
|
$250
|
Cul-de-sac
|
$5,000 (per cul-de-sac)
|
PUD amendment
|
$355
|
PUD, conceptual review
|
$200
|
PUD, preliminary
|
<2 acres = $755
>2 acres = $755 + $50/additional acre or portion thereof
|
PUD, final
|
<2 acres = $505
>2 acres = $505 + $50/additional acre or portion thereof
|
PUD, watershed
|
<2 acres = $355
>2 acres = $505 + $50/additional acre or portion thereof
|
Rezoning (to nonresidential)
|
<2 acres = $505
>2 acres = $505 + $50/additional acre or portion thereof
|
Rezoning (to residential)
|
<2 acres = $305
>2 acres = $305 + $50/additional acre or portion thereof
|
Right-of-way vacation
|
$300
|
Special meetings
|
$500
|
Sign variation
|
$100
|
Special event
|
$50
|
Special use permit
|
<2 acres = $355
>2 acres = $505 + $50/additional acre or portion thereof
|
Special use permit, home day care
|
$80
|
Subdivisions, administrative
|
$175
|
Subdivisions, minor
|
<2 acres = $300
>2 acres = $300 + $50/additional acre or portion thereof
|
Subdivisions, major (preliminary plat)
|
<2 acres = $300
>2 acres = $300 + $50/additional acre or portion thereof
|
Subdivisions, major (final plat)
|
<2 acres = $600
>2 acres = $600 + $50/additional acre or portion thereof
|
Temporary use permit, administrative or City Council approval
|
$40
|
Text amendment
|
$350
|
Variation, simplified residential
|
$100
|
Variation, nonresidential
|
<2 acres = $305
>2 acres = $505
|
Zoning verification
|
$25
|
Subject to material price increase.
B.
Water used during construction of new buildings.
(1)
Effective April 1, 2006:
Type
|
Fee
| |
---|---|---|
One- and two-family residences
|
$38.02
| |
Multifamily, commercial, industrial
| ||
Under 2,000 square feet
|
$38.03 minimum fee
| |
Each additional square foot over 2,000 to 10,000
|
$0.03
| |
Each additional square foot over 10,001 to 50,000
|
$0.009
| |
Each additional square foot over 50,000
|
$0.005
|
A.
Sampling charge. The City will assess the regulated
dischargers a fee for sampling with City equipment and manpower as
follows:
B.
Laboratory analysis charge. The City will assess the
regulated dischargers a laboratory analysis fee to recover the City's
expenses for analyzing in-house the regulated wastewater discharge
samples for specific pollutants. The scheduled fees pertain to only
analysis conducted in-house by the City's laboratory. Any samples
sent off site to a private laboratory will be billed at the City's
cost. In-house fees are as follows:
C.
Conventional pollutants.
Pollutant
|
Fee
|
---|---|
Carbonaceous biological oxygen demand (CBOD)
|
$20 per analysis
|
Biological oxygen demand (BOD)
|
$20 per analysis
|
Suspended solids
|
$18 per analysis
|
Total solids
|
$15 per analysis
|
Volatile solids
|
$15 per analysis
|
pH
|
$5 per analysis
|
Ammonia nitrogen
|
$20 per analysis
|
Fecal coliform
|
$18 per analysis
|
Dissolved solids
|
$20 per analysis
|
D.
Metals by atomic absorption.
Type of Metal
|
Fee
|
---|---|
Sample prep fee
|
$15
|
Copper
|
$11 per analysis
|
Chrome
|
$11 per analysis
|
Cadmium
|
$11 per analysis
|
Lead
|
$11 per analysis
|
Zinc
|
$11 per analysis
|
Iron
|
$11 per analysis
|
Barium
|
$11 per analysis
|
Silver
|
$11 per analysis
|
E.
Wet chemistry.
Fluoride
|
$20 per analysis
|
Alkalinity
|
$20 per analysis
|
Phosphorous
|
$20 per analysis
|
Chloride
|
$20 per analysis
|
Volatile acid
|
$20 per analysis
|
F.
Semiannual categorical compliance sampling. In addition
to the sampling charge above, all semiannual categorical compliance
analyses shall be completed by an outside, certified laboratory and
will be charged to the industrial user at the City's cost.
Connection to storm sewer permitted is only
when approved by the City Engineer and permit fees paid as follows:
[Amended 9-15-2020 by Ord. No. 7653]
Development impact fees are set forth in Chapter 650, Section A-1400, of the Crystal Lake Unified Development Ordinance.
A.
The fee for the sprinkler review is based on the number
of sprinkler heads in the system.
Number of Heads
|
Fee
|
---|---|
1 - 100
|
$100
|
101 - 200
|
$150
|
201 - 300
|
$180
|
301 - 400
|
$225
|
401 - 750
|
$260
|
Over 750
|
$285, plus $0.10 per head over 750
|
B.
For hydraulically designed systems, multiply the above
fee by two. Stand pipes using the same supply as the automatic sprinklers
are included in the fee.
C.
Stand pipe review (per standpipe): $60.
If overtime is necessary in order to perform inspections or
plan reviews, in addition to other fees prescribed in the section,
a fee of $100 shall be charged for the first hour or part thereof.
Any time beyond the first hour shall be charged in quarter-hour increments
at a rate of $25 per quarter hour. All overtime fees shall be paid
by the owner or permittee.
All fees, actual costs or actual expenses related to the City
retaining a professional service consultant or technician to conduct
any plan review, inspections, economic impact analysis, environmental
analysis, legal fees, or other due diligence development costs on
behalf of the City shall be paid for by the owner or permittee, in
addition to other fees or costs required by the City. The petitioner
shall execute a consultant fee reimbursement acknowledgement form.
Residential, office, business, manufacturing,
churches, schools or PUD:
A.
The minimum fee shall be computed as 1.25% of the
cost estimate for public and/or private property site improvements
as approved by the City Engineer.
B.
Reimbursement to the City shall be made by the developer for direct
costs incurred by the City in connection with the retention of outside
consultants to conduct plan reviews, inspections or to provide other
services including, but not limited to:
[Amended 9-15-2020 by Ord. No. 7653]
(1)
Traffic analysis when requested by the City.
(2)
Surveying as performed by a licensed land surveyor.
(3)
Soils, materials testing or other geotechnical testing or consultation.
(4)
Closed-circuit television inspection of sewers, either sanitary or
storm.
(6)
Review of plans.
(7)
Stormwater management reviews or inspections.
(8)
Inspections.
C.
For office, business, manufacturing, churches, schools or PUD, the value of the public improvements for computation of the fee in Subsection A above shall include waterlines, sanitary sewer, storm sewer, sidewalks, streetlighting, curb and gutter, pavement (including base courses) and stormwater management features, whether publicly dedicated or private. Estimates for the above shall be provided by the permittee subject to review and approval by the City Engineer.
D.
For office, business, manufacturing, churches, schools or PUD, the value of the private improvements for computation of the fee in Subsection A above shall include waterlines, sanitary sewer, storm sewer, sidewalks, parking lot site lighting, curb and gutter and pavement (including base courses) and stormwater management features, whether publicly dedicated or private. Estimates for the above shall be provided by the permittee subject to review and approval by the City Engineer.
For all development plans submitted to the Crystal Lake Planning and Zoning Commission under the provisions of Chapter 650, Unified Development Ordinance, or 65 ILCS 5/11-15.1-1 et seq., as amended:
Type of Plat
|
Fee
| |
---|---|---|
Subdivision preliminary plat
| ||
1 to 2 acres
|
$300
| |
Over 2 acres
|
$50/acre
| |
Subdivision final plat
| ||
1 to 2 acres
|
$600
| |
Over 2 acres
|
$50/acre
|
A.
Reinspection fee. Whenever the Community Development or Fire Rescue
Department shall make an inspection after a second failed inspection
pursuant to the issuance of a notice under the ordinances of the City
of Crystal Lake, a fee of $150 shall be paid for that inspection and
each subsequent inspection. Said fee shall be paid at the time the
inspection is requested. The Building Commissioner, or his/her designee,
may waive this fee.
B.
Same-day inspection fee: Inspection requests made without a minimum
of 24 hours' notice shall incur a fee of $150. Said fee shall be paid
at the time the inspection is requested. The Building Commissioner,
or his/her designee, may waive this fee.
[Amended 9-15-2020 by Ord. No. 7653]
The following fees shall be charged in connection with stormwater
review and inspection when, except as otherwise provided herein, such
review and inspection is not conducted by a professional service consultant:
A.
General Permit #1: $150.
B.
General Permit #2: $400.
C.
Minor development: $400.
D.
Intermediate development: $550.
E.
Major development: $850 + $50 per additional acre.
F.
Fees for recording of the Grant of Stormwater Management Easement
for Infiltration Trench Agreement: $55. This fee shall be charged
regardless of whether a professional service consultant is retained.
When a key box is required on a structure as identified in the
City of Crystal Lake Fire Code for use exclusively by the Fire Rescue
Department, a one-time fee of $20 shall be paid for the application
and maintenance of the box by the Fire Rescue Department. Said fee
shall be paid at the time of application.
A.
Purpose. From time to time the City deems it to be in the best interest
of the City and its residents to finance certain public improvements
or service through a special service area. When such a determination
has been made, it is appropriate and desirable to establish a method
by which those property owners that are not included within the original
special service area but seek the use or benefit of the facilities
or services financed through such special service area pay an equitable
share of the establishment or maintenance of such facilities or services
(a "special service").
B.
Fees. Any property owner seeking to use or benefit from a special
service financed through a special service area is required to either
be part of such special service area or to pay a participation fee
as a prerequisite to use of the special service. The participation
fee shall be calculated as follows:
Base Fee + [(Base Fee x Interest) x Time] = Participation Fee
| |
Where:
| |
"Base Fee" is total divided by participants, unless another
appropriate value is determined by the City Council;
| |
"Interest" is the maximum rate of interest that may be charged
for any bonds issued for the special services or 1.0%, whichever is
greater;
| |
"Participants" is the total number of original participants
in the special service area;
| |
"Term" is 120% of the maximum maturity period for bonds issued
in connection with a special service area;
| |
"Time" is the number of years that have elapsed from the bond
issue date to the payment of the participation fee, but in no event
shall the time exceed the term; and
| |
"Total" is the total principal amount of bonds to be issued
for the special services.
|
C.
Applicability. Participation fees shall be charged throughout the
duration of the term against any person or property prior to connection
to or use of any special services financed through a special service
area, where such person or property was not included in such special
service area.
D.
Allocation of participation fees. To the extent participation fees
are collected while taxes are still being levied against the participants
for payment of special service area bonds, such participation fees
shall be used to equitably abate future tax payments on such bonds.
If participation fees are collected after taxes are no longer being
levied against participants to retire bonds, the participation fees
shall be allocated to a participation fee fund for five years after
all bonds for the special service area have been retired (the "holding
period"). The participation fee fund shall be used for ongoing expenses
related to the special service area and the special services. After
the holding period, the monies in the participation fee fund shall
be reallocated to the City's general fund or such other fund as the
City Council determines is in the best interests of the residents.
A.
Marina operation/marina rental fees.
[Amended 4-18-2023 by Ord. No. 7921]
Minimum 1-Hour Rentals
|
1-Hour Fee
|
1-Hour Fee
(NR)
|
Each Additional 1/2 Hour
|
Each Additional 1/2 Hour
(NR)
|
---|---|---|---|---|
Canoe
|
$10
|
$14
|
$6
|
$6
|
Kayak (single or tandem)
|
$10
|
$14
|
$6
|
$6
|
Paddleboat
|
$10
|
$14
|
$6
|
$6
|
Sailboat
|
$8
|
$12
|
$4
|
$6
|
Paddle pontoon
|
$35
|
$40
|
$15
|
$20
|
Minimum 2-Hour Rentals
|
2-Hour Fee
|
2-Hour Fee
(NR)
|
Each Additional Hour
|
Each Additional Hour
(NR)
|
---|---|---|---|---|
12-foot row boat
|
$12
|
$18
|
$5
|
$7
|
14-foot row boat
|
$14
|
$21
|
$7
|
$9
|
Trolling motor
|
$10
|
$10
|
$5
|
$5
|
B.
Beach and parking nonresident season pass.
Yearly Pass
|
Rate When Purchased
Between 1/1 - 7/12
|
Pro-Rated Rate When
Purchased Between 7/13 - 12/31
|
---|---|---|
Individual
|
$150
|
$90
|
Family of 2
|
$210
|
$125
|
Family of 3
|
$290
|
$175
|
Family of 4
|
$370
|
$220
|
Each additional family member
|
$30
|
$15
|
C.
Pavilion rental rates.
(1)
Pavilion A - Picnic Grove.
[Amended 12-4-2018 by Ord. No. 7520]
Resident
|
Nonresident
| |||
---|---|---|---|---|
Number of People
|
Fee
|
Deposit
|
Fee
|
Deposit
|
1-100 (off)
|
$110
|
$150
|
$200
|
$150
|
1-100 (summer)
|
$110
|
$150
|
$220
|
$150
|
101-150 (off)
|
$145
|
$150
|
$270
|
$150
|
101-150 (summer)
|
$145
|
$150
|
$290
|
$150
|
151-200 (off)
|
$180
|
$150
|
$340
|
$150
|
151-200 (summer)
|
$180
|
$150
|
$360
|
$150
|
(1.1)
Picnic table relocation fee. A flat picnic table relocation
fee of $25 may be charged as part of rental of Pavilion A (Picnic
Grove) if patrons request the relocation of the majority of tables
from underneath the structure or provide a layout requiring movement
of tables for an event.
(2)
Pavilions B and C - Island and Volleyball Court.
Resident
|
Nonresident
| |||
---|---|---|---|---|
Number of People
|
Fee
|
Deposit
|
Fee
|
Deposit
|
1-25 (off)
|
$40
|
$50
|
$130
|
$50
|
1-25 (summer)
|
$50
|
$50
|
$150
|
$50
|
(3)
Pavilion D (North Lake) and Lake House Patio.
Resident
|
Nonresident
| ||||
---|---|---|---|---|---|
Amenity
|
Number of People
|
Fee
|
Deposit
|
Fee
|
Deposit
|
North Lake
|
1-50 (off)
|
$40
|
$50
|
$130
|
$50
|
North Lake
|
1-50 (summer)
|
$50
|
$50
|
$150
|
$50
|
Lake House Patio
|
1-60 (off)
|
$40
|
$50
|
$130
|
$50
|
D.
Nonresident beach/playground entrance fees.
(1)
Nonresident fees.
Category
|
Beach Admission Fee
|
---|---|
Adults (16 and older)
|
$10 ($5 after 4:00 p.m.)
|
Seniors (62 and older)
|
$6 ($3 after 4:00 p.m.)
|
Youth (4-15 years)
|
$6 ($3 after 4:00 p.m.)
|
Ages 3 and under
|
Free
|
(2)
Guests of residents: $1 daily fee for all guests of City residents
(up to five guests per family). Any guests above the maximum of five
per family will be charged $5 each.
E.
SCUBA Zone fees.
Diver Fee
|
Diver Fee Resident Discount/Nonprofit Rate
|
Instructor Discount
|
---|---|---|
$20
|
$15
|
$15 nonresident/$10 resident (with 3 full price paying students)
|
Any permit, license, program, or service provided by the City
of Crystal Lake may be denied if the person has outstanding fines,
fees, or money due the City and has failed to pay the fine, fee, or
money due. The denial of the permit, license, program or service shall
not apply to emergency services relating to the public health, welfare,
or safety. The person requesting the permit, license, program, or
service may appeal a denial to the City Manager or designee.