[HISTORY: Adopted by the Board of Trustees of the Village
of Westville as Ch. 32 of the 2015 Code. Amendments noted where applicable.]
Table of Contents
Table of Contents
- Part I: Administrative Legislation
- Ch 1 General Provisions
- Ch 7 Administration of Government
- Ch 13 Boards and Commissions
- Ch 24 Elections
- Ch 28 Emergency Management
- Ch 33 Ethics, Code of
- Ch 45 Identity Protection
- Ch 50 Insurance
- Ch 54 Investment Policy
- Ch 66 Meetings
- Ch 82 Officers and Employees
- Ch 87 Ordinances
- Ch 90 Paid Leave Policy
- Ch 93 Penalties and Enforcement
- Ch 97 Personnel Rules, Regulations and Policies
- Ch 101 Police Department
- Ch 105 Purchasing
- Ch 112 Records Management
- Ch 134 Village Board
- Part II: General Legislation
- Ch 150 Adult Uses
- Ch 155 Amusement Devices
- Ch 159 Animals
- Ch 168 Buildings, Unsafe
- Ch 170 Business District
- Ch 172 Business Licensing and Operation
- Ch 176 Cannabis
- Ch 190 Fair Housing
- Ch 195 Fireworks
- Ch 200 Flood Damage Prevention
- Ch 209 Gas System
- Ch 223 Junk Dealers
- Ch 231 Liquor Licensing
- Ch 238 Manufactured Housing
- Ch 252 Nuisances
- Ch 260 Offenses
- Ch 267 Parks
- Ch 271 Peddling and Soliciting
- Ch 275 Property Maintenance
- Ch 278 Raffles and Poker Runs
- Ch 286 Solid Waste
- Ch 291 Stormwater Management
- Ch 291 Art I General Provisions
- ยงย 291-1 Authority and purpose.
- ยงย 291-2 Other permits required.
- ยงย 291-3 Applicability.
- ยงย 291-4 Drainage permit exemptions.
- ยงย 291-5 Exceptions to stormwater requirements.
- ยงย 291-6 Additional exceptions.
- ยงย 291-7 Liability for damages.
- ยงย 291-8 NPDES compliance.
- ยงย 291-9 Public access to information.
- Ch 291 Art II Definitions
- ยงย 291-10 Terms defined.
- Ch 291 Art III Stormwater Drainage and Detention
- ยงย 291-11 Drainage plan submittal requirements.
- ยงย 291-12 Minimization of increases in runoff volumes and rates.
- ยงย 291-13 Water quality and multiple uses.
- ยงย 291-14 Design criteria, standards and methods.
- ยงย 291-15 Accommodating flows from upstream tributary areas.
- ยงย 291-16 Early completion of detention facilities.
- Ch 291 Art IV Soil Erosion and Sediment Control
- ยงย 291-17 Findings.
- ยงย 291-18 General principles.
- ยงย 291-19 Plan submission requirements.
- ยงย 291-20 Design and operation standards and requirements.
- ยงย 291-21 Maintenance of control measures.
- ยงย 291-22 Control of construction site wastes.
- ยงย 291-23 Construction site stormwater pollution prevention plan.
- Ch 291 Art V Maintenance Responsibilities
- ยงย 291-24 Long-term maintenance responsibility.
- ยงย 291-25 Illicit discharges.
- Ch 291 Art VI Inspections
- ยงย 291-26 Authority to inspect; schedule.
- ยงย 291-27 Construction activity inspections.
- ยงย 291-28 Special precautions.
- ยงย 291-29 Amendment of plans.
- Ch 291 Art VII Permitting
- ยงย 291-30 Application for permit; fees.
- ยงย 291-31 Bond required.
- ยงย 291-32 Review and approval.
- ยงย 291-33 Final certification.
- ยงย 291-34 Expiration of permit.
- ยงย 291-35 Appeals.
- Ch 291 Art VIII Enforcement
- ยงย 291-36 Stop-work order; revocation of permit.
- ยงย 291-37 Penalty.
- Ch 295 Streets and Sidewalks
- Ch 300 Subdivision of Land
- Ch 305 Swimming Pools
- Ch 313 Taxation
- Ch 318 Utilities
- Ch 322 Vehicles and Traffic
- Ch 326 Vehicles, Inoperable
- Ch 330 Vehicles, Nuisance
- Ch 344 Weeds
- Ch 360 Zoning
- Derivation Table
- Ch DT Derivation Table
- Disposition List
- Ch DL Disposition List