[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
Application for a development permit shall be made by the owner of the property or his authorized agent to the Mayor or his designee on a form furnished for that purpose. Each application shall bear the name(s) and address(es) of the owner or developer of the site, the contractor(s) and any consulting firm retained by the applicant, together with the name of the applicant's principal contact at such firm, and shall be accompanied by a filing fee as set from time to time by the Board of Trustees by resolution for any permit subject to the requirements of Article III, Stormwater Drainage and Detention. A filing fee as set from time to time by the Board of Trustees by resolution is assessed for those developments where only the requirements of Article IV, Soil Erosion and Sediment Control, apply. Each application shall include certification that any land clearing, construction, or development involving the movement of earth shall be in accordance with the plans approved upon issuance of the permit.
The applicant for a drainage permit shall be required to file with the Village a faithful performance bond or bonds, letter of credit, or other improvement security satisfactory to the Village in an amount deemed sufficient by the Mayor or his designee to cover all costs of improvements, landscaping, maintenance of improvements and landscaping, and soil erosion and sediment control measures for 12 months or as specified by the Village. The applicant's bond will also be used towards engineering and inspection costs to cover the cost of failure or repair of improvements installed on the site.
Each application for a drainage permit shall be reviewed and acted upon according to the following procedures:
A. 
The Mayor or his designee will review each application for a drainage permit to determine its conformance with the provisions of this chapter. The Mayor or his designee may also refer for review and comment any application to the County Soil and Water Conservation District, a consulting engineer retained by the Village, and/or any other local government or public agency within whose jurisdiction the site is located. All costs or fees acquired from the review shall be the responsibility of the applicant to reimburse the Village in full before the permit is processed further. Within 60 days after receiving an application and all costs or fees acquired, the Mayor or his designee shall, in writing:
(1) 
Approve the permit application if it is found to be in conformance with the provisions of this chapter, and issue the permit;
(2) 
Approve the permit application subject to such reasonable conditions as may be necessary to secure substantially the objectives of this chapter, and issue the permit subject to these conditions; or
(3) 
Disapprove the permit application, indicating the deficiencies and the procedure for submitting a revised application and/or submission.
B. 
No drainage permit shall be issued for an intended development site unless:
(1) 
The development, including but not limited to subdivision or planned unit development, has been approved by the Village where applicable; or
(2) 
Such permit is accompanied by or combined with a valid building permit issued by the Village; or
(3) 
The proposed earth moving is coordinated with any overall development program previously approved by the Village for the area in which the site is situated; and
(4) 
All relevant federal and state permits have been received for the portion of the site subject to soil disturbance as noted in § 291-2.
C. 
Failure of the Mayor or his designee to act on an original or revised application within 60 days of receipt shall authorize the applicant to proceed in accordance with the plans as filed and in compliance with the regulations contained herein, unless such time is extended by agreement between the Mayor or his designee and the applicant. Pending preparation and approval of a revised plan, development activities shall be allowed to proceed in accordance with conditions established by the Mayor or his designee.
Prior to final approval by the Village, a registered professional engineer shall certify that the detention basin has been constructed in accordance with construction plans and proposed volume has been provided. An "as-built" survey of the detention basin, prepared by a licensed surveyor, shall be included with the certification for approval.
Every drainage permit shall expire and become null and void if the work authorized by such permit has not been commenced within 180 days, or if not completed by a date which shall be specified in the permit; except that the Mayor or his designee may, if the permittee presents satisfactory evidence that unusual difficulties have prevented work from being commenced or completed within the specified time limits, grant a reasonable extension of time if written application is made before the expiration date of the permit. The Mayor or his designee may require modification of the erosion control plan to prevent any increase in erosion or off-site sediment runoff resulting from any extension.
The applicant, or any person or agency which received notice of the filing of the application, may appeal the decision of the Mayor or his designee to the Village Board. Upon receipt of an appeal, the Village Board shall schedule and hold a public hearing, after giving 15 days' notice thereof. The Board shall render a decision within 30 days after the hearing. Factors to be considered on review shall include, but need not be limited to, the effects of the proposed development activities on the surface water flow to tributary and downstream lands, any comprehensive watershed management plans, or the use of any retention facilities; possible saturation of fill and unsupported cuts by water, both natural and domestic; runoff surface waters that produce erosion by silting of drainageways; nature and type of soil or rock which, when disturbed by the proposed development activities, may create earth movement and produce slopes that cannot be landscaped; and excessive and unnecessary scarring of the natural landscape through grading or removal of vegetation.