Exciting enhancements are coming soon to eCode360! Learn more 🡪
Village of Bellevue, MI
Eaton County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
The BOS Business, Office, Service District is established to create and preserve areas for those commercial facilities which are especially useful in close proximity to residential areas as a land use buffer, while minimizing the undesirable impact of the uses on the neighborhoods which they service.
A. 
Office buildings for any of the following occupations: executive, administrative, professional, accounting, writing, clerical, stenographic, drafting and sales;
B. 
Medical office and dental offices, including clinics and laboratories;
C. 
Facilities for human care such as hospitals, convalescent and nursing homes;
D. 
Banks, credit unions, savings and loan associations, and similar uses; drive-through facilities as an accessory use;
E. 
Laundry and dry cleaning establishments;
F. 
Public uses;
G. 
Personal service establishments, including barber shops, beauty shops and health salons;
H. 
Off-street parking lots;
I. 
Business schools;
J. 
Essential services;
K. 
Public parks and recreation areas;
L. 
Foster family homes and family day-care homes;
M. 
Funeral homes;
N. 
Accessory structures and uses customarily incidental to the above permitted uses, provided such buildings and uses are located on the same zoning lot with a permitted use.
[Amended 10-27-2009 by Ord. No. 2009-002]
The following uses may be permitted by the Village Council as provided for in Article XVII:
A. 
Bed-and-breakfast (§ 155-17.08).
B. 
Functional equivalent family (§ 155-17.39).
C. 
Reasonable accommodation use (§ 155-17.40).
D. 
Group day-care and group foster care facilities (§ 155-17.14).
E. 
Churches and religious institutions (§ 155-17.10).
F. 
Schools, institutional and public uses (§ 155-17.24).
G. 
Planned unit developments (Article XIV).
H. 
Anemometer tower over 20 meters high.
I. 
Utility grid wind energy system.
J. 
On-site use wind energy system over 20 meters high.
A. 
All uses shall be conducted within the confines of a building.
B. 
Area and bulk requirements in accord with Article XV, Schedule of Regulations, limiting the height and bulk of buildings, the minimum size of lot by permitted land use, and providing minimum yard setback requirements.
C. 
Site plan review and approval shall be obtained for all new construction in accordance with the provisions of Article XXII.