A.Â
Fee schedule.
(1)Â
Every application for development shall be accompanied by a
certified checks payable to the Borough of Spotswood in accordance
with the following schedule of administrative charges and escrow account
deposits.
(2)Â
Where one application for development includes several approval
requests, the sum of the individually required administrative charges
and escrow account deposits shall be paid, with separate checks for
the total administrative charges and for the total escrow account
deposits.
(3)Â
Fees and copies of requested items, special meetings, and other
items also are included in the fee schedule.
Application Fee
|
Escrow Fee
| |||
---|---|---|---|---|
1.
|
Informal reviews
| |||
(a)
|
One 15-minute appearance without professional review
|
$100
|
$100
| |
(b)
|
Any additional appearance and/or any appearance with professional
review
|
$200
|
$1,000
| |
2.
|
Subdivisions
| |||
(a)
|
Minor subdivision plat
|
$150
|
$750 per lot, provided that the initial deposit shall not exceed
$1,500
| |
(b)
|
Preliminary major subdivision plat
|
$250
|
$1,000 per lot, provided that the initial deposit shall not
exceed $10,000
| |
(c)
|
Final major subdivision plat
|
$200
|
$500 per lot, provided that the initial deposit shall not exceed
$5,000
| |
(d)
|
Amended minor, preliminary major and/or final major subdivision
plat or plan resubmission
|
$150
|
$500
| |
(e)
|
Each resubmission of revised plan sets
|
$50 flat fee each submission
|
Original total escrow amount x 20%
| |
(f)
|
Request for reapproval or extension of time
|
$300
|
$500
| |
3.
|
Site plans
| |||
(a)
|
Minor site plan
|
$250
|
$1,500
| |
(b)
|
Preliminary major site plan
|
$250
|
$5,000
| |
(c)
|
Final major site plan
|
$200
|
$2,500
| |
(d)
|
Amended minor, preliminary major and/or final major site plan
or plan resubmission
|
$150
|
$500
| |
(e)
|
Each resubmission of revised plan sets
|
$50 flat fee each submission
|
Original total escrow amount x 20%
| |
(f)
|
Request for reapproval or extension of time
|
$300
|
$500
| |
4.
|
Conditional uses (in addition to any fees required for site
plan or subdivision review)
|
$300
|
$500
| |
5.
|
Variances
| |||
(a)
|
Appeals (40:55D-70a)
|
$100
|
$500 each
| |
(b)
|
Interpretation (40:55D-70b)
|
$100
|
$500 each
| |
(c)
|
Bulk (40:55D-70c)
|
$200 per application
|
$400
| |
(d)
|
Use and others: each (40:55D-70d)
|
$200
|
$1,000
| |
(e)
|
Permit (40:55D-34, 35 and 36)
|
$200
|
$500
| |
6.
|
Submission Waivers
|
$100
|
$100 each waiver
| |
7.
|
Requested special meeting of Planning or Zoning Board
|
$1,000
|
Not applicable
| |
8.
|
Certified list of property owners or certified list of public
utilities
|
$10 flat fee
|
Not applicable
| |
9.
|
Copy of minutes, resolutions or decisions
|
$1/page for first copy of said page, plus $0.25/copy for each
additional copy of said page
|
Not applicable
| |
10.
|
Transcription of meeting proceedings
|
At cost, in accordance with N.J.S.A. 2A:4-13.117
|
Not applicable
| |
11.
|
Copy of tape of public hearing
|
$25/tape
|
Not applicable
| |
12.
|
Subdivision approval certificate
|
$50/certificate
|
Not applicable
| |
13.
|
Certificate of nonconformity (N.J.S.A. 40:55D-68)
|
$50/certificate
|
Not applicable
| |
14.
|
Zoning permit
|
$50
|
B.Â
The administrative charges are flat fees to cover administrative
expenses and are nonrefundable.
C.Â
The escrow account deposits noted in this chapter are required to
pay for the costs of professional services including engineering,
planning, legal and other expenses connected with the review of submitted
materials, including any traffic engineering review or other special
analysis related to the Borough's review of the submitted materials,
or any necessary studies regarding off-tract improvements. The review
escrow shall be deposited by the Chief Financial Officer of the Borough,
or his/her designee, in an account for such purposes under the sole
control of the Borough. Said review escrows may be commingled with
similar escrows from other applicants, but accurate accounts and records
shall be kept so as to identify the particular escrows and charges
made against the same.
D.Â
An applicant is responsible to reimburse the Borough of Spotswood
for all expenses of professional personnel incurred and paid by the
Borough for the review process of an application for development before
a municipal agency, such as, but not limited to:
(1)Â
Charges for reviews by professional personnel of applications,
plans and accompanying documents currently pending before the municipal
agency, or the review of an applicant's compliance with the conditions
of any approval to an application for development by a municipal agency,
or the review of any requests made by the applicant for modifications
or amendments to the submitted material, provided that the professional
shall not review items which are subject to approval by any state
governmental agency and not under municipal jurisdiction, except to
the extent consultation with the state agency is necessary due to
the effect of state approvals on the proposed subdivision or site
plan;
(2)Â
Issuance of reports by professional personnel to the municipal
agency setting forth recommendations resulting from the review of
any documents submitted by the applicant;
(3)Â
Charges for any telephone or digital conference or meeting requested
or initiated by the applicant, his attorney or any of his experts
or representatives;
(4)Â
Review of additional documents submitted by the applicant and
issuance of reports relating thereto;
(5)Â
Review or preparation of easements, developer's agreements,
deeds, approval resolutions, or the like;
(6)Â
Preparation for and attendance at all meetings by professionals
serving the Board, such as the Attorney, Engineer and Planner, or
other experts as required;
(7)Â
The cost of expert advice or testimony obtained by the municipal
agency for the purpose of corroborating testimony of applicant's experts;
and
(8)Â
Actual out-of-pocket expenses incurred in the process of reviewing
the applications, plans and accompanying documents.
E.Â
Each applicant shall agree to pay all reasonable costs for professional
review of the application. All such costs for review must be paid
before any approved plat, plan or deed is signed and before any zoning
permit, construction permit, certificate of occupancy, and/or other
permit is issued.
F.Â
Payment by the Borough of Spotswood of any bill rendered by a professional
to the municipality with respect to any service for which the municipality
is entitled to reimbursement under this chapter shall in no way be
contingent upon receipt by the municipality of reimbursement from
the applicant, nor shall any payment to a professional be delayed
pending the reimbursement from an applicant.
G.Â
If an applicant is required or chooses to provide a court reporter,
the cost for taking testimony and transcribing it and providing a
copy of the transcript to the Borough shall be at the expense of the
applicant who also shall arrange for the reporter's attendance.
For purposes of this chapter section, the term "public improvements"
shall include streets, grading, pavement, gutters, curbs, sidewalks,
streetlighting, street signs, shade trees, surveyor's monuments, fire
prevention features, water mains, culverts, storm sewers, sanitary
sewers or other means of sewage disposal (excluding individual subsurface
sewage disposal systems intended to serve individual lots), drainage
structures, soil erosion control features and sedimentation control
devices, landscaping, public improvements of open space, and, in the
case of site plans only, other on-site improvements.
A.Â
Requirements specific to major subdivisions.
(1)Â
No final major subdivision plat (whether for an entire tract
or a section thereof) shall be recorded unless:
(a)Â
The Borough Engineer has certified to the Board that all public
improvements required by the preliminary subdivision approval have
been satisfactorily completed; or
(b)Â
The developer has entered into a developer's agreement with the Borough of Spotswood, in a form satisfactory to the Borough Attorney and authorized by the Borough Council, requiring the installation and maintenance by the developer and its successors in interest of the public improvements, imposing such limitations, and/or staging of, the development of the subdivision as are necessary to ensure orderly construction of the public improvements, and assuring the installation of the public improvements on or before an agreed date by the filing of a performance guarantee in accordance with § 120-1002D hereinbelow.
(2)Â
No construction permit shall be issued for any building within the subdivision until the developer has completed the following public improvements in accordance with the approved subdivision plans and construction plans required by § 120-1002E(4) hereinbelow:
(a)Â
All required utility installations and their appurtenances,
including water mains, drainage and detention facilities, culverts,
storm sewers, sanitary sewers or dry sewers and public improvements
of open space;
(b)Â
All required grading and the macadam base course surfacing of
all streets;
(c)Â
Construction of all required curbs; and/or
(d)Â
Filed with the Borough of Spotswood a performance guarantee in accordance with § 120-1002D of this chapter, sufficient in amount to cover the cost of all remaining required improvements, as estimated by the Borough Engineer, and assuring the installation of said improvements on or before an agreed date and as hereinafter provided.
(3)Â
No certificate of occupancy shall be issued for any dwelling within the subdivision except in compliance with the provisions for certificate of occupancy specified in § 120-1102E of this chapter.
(4)Â
Unless provided otherwise elsewhere in this chapter, the remaining
required improvements shall be at least 50% completed as to each category
set forth in the performance guarantee within one year from the date
of final approval or by such time as 50% of the lots in the section
in question have been conveyed in any manner by the developer, whichever
shall first occur. At least 75% of the improvements shall be completed
as to each category as set forth in the performance guarantee within
18 months from the date of final approval, or at such time as 75%
of the lots in the section in question have been conveyed in any manner
by the developer, whichever shall first occur. Such improvements shall
be 100% completed and accepted by the Borough within two years from
the date of final approval or at such time as all of the lots in the
section in question shall first occur.
(5)Â
It is the intention of the Borough Council that the foregoing
requirements accomplish the following:
(6)Â
In the case of subdivision having final approval by stages or
sections, the requirements of this subsection shall be applied by
stage or section.
B.Â
Requirements specific to major site plans. No final major site plan
application (whether for an entire tract or a section thereof) shall
be approved by the Board unless:
(1)Â
The Borough Engineer has certified to the Board that all public
improvements required by the preliminary site plan approval have been
satisfactorily completed; or
(2)Â
The developer, with the approval of the Planning Board, has
entered into a developer's agreement with the Borough of Spotswood
in a form satisfactory to the Borough Attorney and authorized by the
governing body:
(a)Â
Requiring the installation and maintenance by the developer
(and the developer's successors in interest) of the public improvements;
and
C.Â
Requirements specific to minor subdivisions and minor site plans. In the case of a minor site plan and/or minor subdivision, in the event that the developer elects to complete all improvements without posting the performance guarantee specified in § 120-1002D hereinbelow, no construction shall be commenced until a finalized plan is submitted and signed, incorporating all conditions of approval.
(1)Â
The developer shall still post the inspection escrow and notify
the Borough Engineer prior to commencement of work.
(2)Â
All site improvements under this subsection must be completed
prior to the issuance of a certificate of occupancy, or within 120
days of a temporary certificate of occupancy in the instance where
a performance guarantee covering the balance of the uncompleted improvements
has been posted, provided that, in any case, the roadway pavement
has been completed.
D.Â
Performance guarantee.
(1)Â
A performance guarantee estimate shall be prepared by the Borough
Engineer for review and approval, setting forth all required improvements
as determined by the Board and their estimated cost, provided that
no performance guarantee shall be required for the installation of
utilities, when said utility improvements will be installed by the
applicable utility company. Any adjustment in the amount of the performance
guarantee shall be approved by resolution of the Borough Council.
(2)Â
The cost of the installation of the required improvements shall
be estimated by the Borough Engineer based on documented construction
costs for public improvements prevailing in the general area of the
Borough. The developer may appeal the Borough Engineer's estimate
to the Borough Council. The Borough Council shall decide the appeal
within 45 days of receipt of the appeal in writing by the Borough
Clerk. After the developer posts a guarantee with the Borough based
on the cost of the installation of improvements as determined by the
Borough Council, he/she may institute legal action within one year
of the posting in order to preserve the right to a judicial determination
as to the fairness and reasonableness of the amount of the guarantee.
(3)Â
The developer shall present two copies of the performance guarantee
in an amount equal to 120% of the approved construction cost performance
guarantee estimate for approval as to form and execution by the Borough
Attorney; additional copies of the performance guarantee shall be
forwarded by the owner to the Planning Board Attorney as the case
may be. The performance guarantee estimates, as prepared by the Borough
Engineer and approved by the Borough Council, shall be appended to
each performance guarantee posted by the obligor.
(4)Â
The performance guarantee shall be made payable and deposited
to the Borough of Spotswood and shall be in the form of cash, irrevocable
letter of credit in accordance with N.J.S.A. 40:55D-53.5, a certified
check, a performance bond provided by an acceptable surety company
licensed to do business in the State of New Jersey and with the developer
as principal, or in another form of guarantee acceptable the Borough.
(a)Â
The Borough shall issue its receipt for such deposits and shall
cause the same to be deposited in the name of the Borough to be retained
as security for completion of all requirements and to be returned
to the owner on completion of all required work or, in the event of
default on part of the developer, to be used by the Borough to pay
the cost and expense of obtaining completion of all requirements.
(b)Â
The developer shall provide a written agreement from his/her lending institution stating that the lending institution agrees to the time period(s) required for the completion of the improvements and to the release of the guarantee by the Borough Council in accordance with § 120-1002G of this chapter.
(5)Â
Ten percent of the amount of the approved performance guarantee
shall be deposited by the developer in cash with the Borough.
(a)Â
The remaining 90% may be in cash, an irrevocable letter of credit
in accordance with N.J.S.A. 40:55D-53.5, a surety bond, or in another
form of guarantee acceptable to the Borough.
(b)Â
In the event of default, the 10% cash shall be first applied
to the completion of the requirements and any bidding and legal costs
associated therewith, and the remaining 90% cash, letter of credit,
surety bond, or other form of guarantee shall thereafter be resorted
to, if necessary, for the completion of the requirements and any additional
bidding and legal costs associated therewith.
E.Â
Start of construction. Construction pursuant to a site plan or subdivision
approval shall not commence until:
(1)Â
The developer has paid all fees required by this chapter;
(2)Â
The developer has received all other governmental approvals
required by the Board's resolution of memorialization granting subdivision
and/or site plan approval;
(3)Â
The developer has satisfied all conditions of approval required
by the Board's resolution of memorialization granting subdivision
and/or site plan approval and all revisions to the submitted plat
or plan required by the Board at the time of subdivision or site plan
approval have been filed with and approved by the Borough Engineer
and any other individual or group as may have been specified by the
Board in the applicable resolution of memorialization granting subdivision
and/or site plan approval;
(4)Â
The developer's construction plans have been filed with and
approved by the Borough Engineer;
(5)Â
If authorized by the Borough Council at the request of the Borough Engineer, the developer has had a preconstruction meeting with the Borough Engineer in accordance with § 120-1102 of this chapter for the purpose of forecasting and resolving problems that may arise during the time of construction; and
(6)Â
Regarding major subdivisions only, the developer has posted
the Sales Map as required by Article 900 of this chapter in a prominent
location in all offices from which sales of property in the subdivision
development will be conducted.
F.Â
Inspection and tests.
(1)Â
All site improvements and utility installations for site plans, subdivisions, plot plans and other realty improvements shall be inspected during the time of their installation under the supervision of the Borough Engineer to insure satisfactory completion. The cost of said inspection shall be the responsibility of the developer who shall deposit with the Chief Financial Officer of the Borough inspection fees in an amount not to exceed, except for extraordinary circumstances, the greater of $500 or 5% of the cost of the improvements as determined by the Borough Engineer in accordance with § 120-1002D(2) of this chapter, provided that:
(a)Â
For those developments for which the reasonably anticipated
inspection fees are less than $10,000, the fees may, at the option
of the developer, be paid in two installments. The initial amount
deposited by the developer shall be 50% of the reasonably anticipated
fees. When the balance of deposit drops to 10% of the reasonably anticipated
fees because the amount deposited by the developer has been reduced
by the amount paid to the Borough Engineer for the inspection(s),
the developer shall deposit the remaining 50% of the anticipated inspection
fees.
(b)Â
For those developments for which the reasonably anticipated
inspection fees are $10,000 or greater, the fees may, at the option
of the developer, be paid in four installments. The initial amount
deposited by the developer shall be 25% of the reasonably anticipated
fees. When the balance of deposit drops to 10% of the reasonably anticipated
fees because the amount deposited by the developer has been reduced
by the amount paid to the Borough Engineer for the inspection(s),
the developer shall make additional deposits of 25% of the anticipated
inspection fees.
(2)Â
The inspection escrow shall be deposited by the Chief Financial
Officer of the Borough, or his/her designee, in an account for such
purposes under the sole control of the Borough. Said inspection escrows
may be commingled with similar escrows from other developers, but
accurate accounts and records shall be kept so as to identify the
particular escrows and charges made against the same. The inspection
escrow funds shall be used solely for payment of inspection fees,
expenses and costs of the Borough Engineer on behalf of the Borough
during the course of construction.
(3)Â
The Borough Engineer shall not perform any inspection if sufficient funds to pay for those inspections are not on deposit. Failure of the developer to deposit the required inspection fees in accordance with § 120-1002F(1) of this chapter hereinabove will subject the developer to a stop-work order and/or suspension of construction permits.
(4)Â
In no case shall any paving work be done without permission
from the Borough Engineer. At least two working days' notice shall
be given to the Borough Engineer prior to any construction so that
he or a qualified representative may be present at the time the work
is to be done.
(5)Â
Streets shall not be paved with a top course until all heavy
construction is completed and, if determined by the Borough Engineer
to be necessary, the macadam base course has first been restored.
Shade trees shall not be planted until all grading and earth moving
is completed. The placing of surveyor's monuments shall be among the
last operations.
(6)Â
The Borough Engineer's office shall be notified at least two
working days prior to the commencement of the following phases of
work so that he or a qualified representative may inspect the work;
the Borough Engineer shall, in turn, notify the landscape architect
designated by the Board, if applicable, regarding any seeding and
planting:
(a)Â
Road subgrade.
(b)Â
Curb and gutter forms.
(c)Â
Curbs and gutters.
(d)Â
Road paving.
(e)Â
Sidewalk forms.
(f)Â
Sidewalks.
(g)Â
Drainage pipes and other drainage construction.
(h)Â
Street name signs.
(i)Â
Monuments.
(j)Â
Sanitary sewers and pump stations.
(k)Â
Topsoil, seeding and planting.
(l)Â
Underground utilities.
(m)Â
Potable water facilities.
(n)Â
Detention and/or retention basins.
(7)Â
When designated by the Board, the landscape architect shall
witness and approve landscaping in a designated area or on a typical
lot within a development as deemed appropriate and necessary and/or
as directed by the Borough Engineer. A follow-up inspection when the
entire site or phase of development is completed shall be conducted
in order to confirm compliance for either a phase of development or
the entire project:
(a)Â
Plantings shall be checked for compliance with approved plans;
i.e., correct quantity, size, species and location. Any change or
modifications to the approved plans must be reviewed and approved
by the landscape architect designated by the Board.
(b)Â
Lawns shall be inspected for adequate coverage of healthy, vigorously
growing grass which is relatively free of weeds and void of bare spots
larger than one square foot in area. Bare spots greater than one square
foot in area shall be reseeded or resodded and reinspected until acceptable
coverage is achieved.
(c)Â
Upon completion of the landscaping, the landscape architect
shall check for compliance with the landscape plans approved by the
Board. A punch list of outstanding or unsatisfactory items shall be
compiled with copies given to the developer and the Borough Engineer,
and a final sign-off shall be given after necessary remedial work.
(d)Â
Upon successful completion of all landscape work, a written
recommendation shall be forwarded by the landscape architect to the
Borough Engineer to be included in the inspection report to the Borough
Council before the release of performance guarantees.
(8)Â
Any improvement installed contrary to the plan or plat approval
by the Borough shall constitute just cause by the approving authority
or designated official to void or deem voidable the municipal approval.
Moreover, if a certificate of occupancy or construction permit is
issued by a Borough official pursuant to Article 1100 of this chapter,
such certificate or permit does not indicate acceptance by the Borough
of any deviation(s) from the plan or plat as approved by the Board.
(9)Â
Any improvement installed without notice for inspection pursuant to § 120-1002E, F(4) and F(6) hereinabove shall constitute just cause for:
(a)Â
Removal of the uninspected improvement;
(b)Â
The payment by the developer of any costs for material testing;
(c)Â
The restoration by the developer of any improvements disturbed
during any material testing; and/or
(d)Â
The issuance of a stop-work order by the Borough Engineer pending
the resolution of any dispute.
(10)Â
Inspection by the Borough of the installation of improvements
and utilities shall not operate to subject the Borough of Spotswood
to liability for claims, suits or liability of any kind that may at
any time arise because of defects or negligence during construction
or at any time thereafter; it being recognized that the responsibility
to maintain safe conditions at all times during construction and to
provide proper utilities and improvements is upon the owner and his
contractor, if any.
(11)Â
Upon substantial completion of all required street improvements (except for the top course) and appurtenant utility improvements, and the connection of same to the public system, the obligor may request of the Borough Council in writing, by certified mail in care of the Borough Clerk, that the Borough Engineer prepare in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to § 120-1002D(3) of this chapter, a list of all uncompleted or unsatisfactory completed improvements.
(a)Â
If such a request is made, the obligor shall send a copy of
the request to the Borough Engineer. The request shall indicate which
improvements have been completed and which improvements remain uncompleted
in the judgment of the obligor.
(b)Â
The Borough Engineer shall inspect all the improvements covered
by the obligor's request and shall file a detailed list and report,
in writing, with the Borough Council, and shall simultaneously send
a copy thereof to the obligor not later than 45 days after receipt
of the obligor's request.
(c)Â
If the Borough Engineer fails to send or provide the list and
report, as requested by the obligor, within 45 days from the receipt
of the request, the obligor may apply to the Court in a summary manner
for an order compelling the Borough Engineer to provide the list and
report within a stated time and the cost of applying to the Court,
including reasonable attorney's fees, may be awarded to the prevailing
party.
(12)Â
The list prepared by the Borough Engineer pursuant to § 120-1002F(11) hereinabove, shall state, in detail, with respect to each improvement determined to be incomplete or unsatisfactory, the nature and extent of the incompleteness of each incomplete improvement or the nature and extent of, and remedy for, the unsatisfactory state of each completed improvement determined to be unsatisfactory. The report prepared by the Borough Engineer shall identify each improvement determined to be complete and satisfactory together with a recommendation as to the amount of reduction to be made in the performance guarantee relating to the completed and satisfactory improvement, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to § 120-1002D(3) of this chapter.
G.Â
Release. The Borough Council, by resolution, shall either approve the improvements determined to be complete and satisfactory by the Borough Engineer, or reject any or all of these improvements upon the establishment in the resolution of cause for rejection, and shall approve and authorize the amount of reduction to be made in the performance guarantee relating to the improvements accepted, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to § 120-1002D(3) of this chapter. This resolution shall be adopted not later than 45 days after receipt of the list and report prepared by the Borough Engineer.
(1)Â
Upon adoption of the resolution by the Borough Council, the
obligor shall be released from all liability pursuant to its performance
guarantee, with respect to those approved improvements, except for
that portion adequately sufficient to secure completion or correction
of the improvements not yet approved; provided that 30% of the amount
of the performance guarantee posted may be retained to ensure completion
and acceptability of all improvements.
(2)Â
In the event that the obligor has made a cash deposit with the
Borough or approving authority as part of the performance guarantee,
then any partial reduction granted in the performance guarantee shall
be applied to the cash deposit in the same proportion as the original
cash deposit bears to the full amount of the performance guarantee.
(3)Â
If any portion of the required improvements is rejected, the obligor shall complete or correct such improvements and, upon completion or correction, shall notify the Borough Council as specified in § 120-1002F(11) of this chapter and the same procedures shall be followed as in the first instance.
(4)Â
Prior to the approval by the Borough Council of the final reduction
and release of the performance guarantee, all easements and open space
shall be conveyed to the Borough or such other guarantee as specified
on the final plat by deed containing a metes-and-bounds legal description.
(5)Â
If the Borough Council fails to approve or reject the improvements determined by the Borough Engineer to be complete and satisfactory or reduce the performance guarantee for the complete and satisfactory improvements within 45 days from the receipt of the Borough Engineer's list and report, the obligor may apply to the Court in a summary manner for an order compelling, within a stated time, approval of the complete and satisfactory improvements and approval of a reduction in the performance guarantee for the approvable complete and satisfactory improvements in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to § 120-1002D(3) of this chapter, and the cost of applying to the Court, including reasonable attorney's fees, may be awarded to the prevailing party.
H.Â
Conditions and acceptance of improvements. The approval of any application
for development by the Borough shall in no way be construed as acceptance
of any street or drainage system or other improvement. No improvements
shall be accepted by the Borough Council unless and until all of the
following conditions have been met:
(1)Â
The final application for development shall have been approved
by the Planning Board and the developer shall have submitted an affidavit,
signed by a licensed New Jersey professional land surveyor, certifying
that all required monuments have been set in accordance with the Map
Filing Law and any approved subdivision plat.
(2)Â
The Borough Engineer shall have certified in writing that the
improvements are completed and that they comply with the requirements
of this chapter and the terms of the final application for development
approved by the Board.
(3)Â
The owner shall have filed with the Borough Council a maintenance
guarantee in an amount equal to and not more than 15% of the cost
of installing the improvements, the "cost" to be determined by the
Borough Engineer in accordance with this chapter hereinabove.
(a)Â
The maintenance guarantee shall run for a period of two years,
provided that the maintenance guarantee shall not terminate until
the Borough Council has authorized its release pursuant to a recommendation
by the Borough Engineer.
(b)Â
The procedures and requirements governing such maintenance guarantee
shall be identical with the procedures and requirements for a performance
guarantee set forth in this chapter.
(c)Â
The requirements for a maintenance guarantee may be waived by
the Borough Council only if the Borough Engineer, at the request of
the landowner, who also shall pay for the Borough Engineer's services,
has certified that the improvements have been in continuous use for
not less than two years from the date the Borough Engineer certified
completion of such improvements and that during this period the owner
has maintained the improvements in a satisfactory manner; and
(4)Â
An as-built plan and profiles of all utilities and roads (two
black and white prints to be sent to the Borough Engineer plus a Mylar
copy and two black and white prints to be sent to the Administrative
Officer), with certification signed and sealed by a New Jersey licensed
professional engineer as to the actual construction as approved by
the Borough Engineer, shall be provided.
I.Â
Extension of time. The time allowed for the installation of the improvements
for which the performance guarantee has been provided may be extended
by the Borough Council by resolution, provided that the current cost
of installation of such improvements shall first be redetermined by
the Borough Engineer, and if such current cost is found to be greater
than the cost as originally determined, the developer shall be required
to increase the amount of the performance guarantee to an amount equal
to 120% of the installation cost as redetermined. In the event that
the redetermined cost shall be less than the cost as originally determined,
and in further event that the developer's performance guarantee exceeds
120% of such redetermined costs, the developer shall be entitled to
a reduction of the performance guarantee to an amount equal to 120%
of such redetermined costs.
J.Â
Default by developer. If the required improvements are not completed
or corrected in accordance with the performance guarantee, the obligor
and surety, if any, under the performance guarantee shall be liable
thereon to the Borough for the cost of the improvements not completed
or constructed, and the Borough, either prior to or after receipt
of the proceeds thereof, may complete the improvements. Such completion
or correction of improvements shall be subject to the public bidding
requirements of the Local Public Contracts Law, P.L. 1971, c. 198.[1]
(1)Â
For purposes of this subsection, "default" shall mean failure
to install the improvements in accordance with Borough standards of
construction, including but not limited to failure to install the
improvements prior to the expiration of the performance guarantee.
(2)Â
The Borough Engineer's certification that the developer has
defaulted in compliance with the required standards of construction
and installation of improvements shall be the basis for Borough Council
action which rejects the improvements, withholds approval, withholds
construction permits or formally declares default and authorizes collection
on the performance guarantee.
[1]
Editor's Note: See N.J.S.A. 40A:11-1 et seq.
K.Â
Penalties. In addition to the penalties for violation of this chapter
in accordance with this chapter, the Borough Engineer, or another
Borough official designated by the Borough Council, is specifically
authorized to require the replacement or restoration of any lands,
buildings, structures and site improvements (including clearing, whether
on site or off site) or of any other work commenced or continued on
any site for which an approval is required pursuant to this chapter
in violation of any stop-construction order or the standards for construction
as established by the Borough.
A.Â
The Borough of Spotswood or the Planning Board shall not bill the
applicant or charge any established escrow account for any municipal
clerical or administrative functions, overhead expenses, meeting room
charges, or for any other municipal costs and expenses except, and
subject to, the following:
(1)Â
If the salary, staff support and overhead for a municipal professional
are provided by the Borough of Spotswood, the charge shall not exceed
200% of the sum of the products resulting from multiplying the hourly
base salary of each of the professionals (which shall be established
annually by ordinance) by the number of hours spent by the respective
professional upon review of the application for development or for
the inspection of the developer's improvements, as the case may be;
(2)Â
If the salary, staff support and overhead for a municipal professional
are not provided by the Borough of Spotswood, the charge shall be
at the same rate as all other work of the same nature by the professional
for the municipality when fees are not reimbursed or otherwise imposed
on applicants or developers; and
(3)Â
If the Borough of Spotswood retains a different professional
or consultant in the place of the professional originally responsible
for development within the municipality, for the review of an application
for development or for the inspection of improvements, the Borough
of Spotswood, or the Planning Board shall be responsible for all time
and expenses of the new professional to become familiar with the application
or the project, and the municipality or municipal agency shall not
bill the applicant or charge any established escrow account for any
such service.
B.Â
The Chief Financial Officer of the Borough, or his/her designee,
shall make all of the payments to professionals for services rendered
to the Borough of Spotswood, to the Planning Board for the review
of applications for development and the inspection of improvements
and shall administer the review and escrow deposits as follows:
(1)Â
Each payment charged to a deposit for the review of applications
for development and for the inspection of improvements shall be pursuant
to a voucher from the professional in accordance with the following:
(a)Â
Each voucher shall identify the personnel performing the service,
the date each service is performed, the hours spent to one-fourth-hour
increments, the hourly rate of the professional, and the expenses
incurred.
(b)Â
Each voucher shall be submitted to the Chief Financial Officer
of the Borough on a monthly basis in accordance with the schedules
and procedures established by the Chief Financial Officer.
(c)Â
The professional shall send an informational copy of all vouchers
or statements submitted to the Chief Financial Officer of the Borough
simultaneously to the applicant.
(2)Â
The Chief Financial Officer of the Borough shall prepare and
send to the applicant a statement which shall include an accounting
of the funds listing all deposits, interest earnings, disbursements
and the cumulative balance of the escrow account; this information
shall be provided on a quarterly basis if the monthly charges are
$1,000 or less, or on a monthly basis if the monthly charges exceed
$1,000.
(3)Â
If an escrow account or deposit contains insufficient funds
to enable the Borough of Spotswood, the Planning Board to perform
the required application reviews or improvement inspections, the Chief
Financial Officer of the Borough shall provide the applicant with
a written notice of the insufficient escrow or deposit balance.
(a)Â
In order for work to continue on the development or the application,
the applicant, within 10 days of the written notice, shall post a
deposit to the account in an amount to be agreed upon between the
Borough of Spotswood, the Planning Board and the applicant.
(b)Â
With regard to review fees, if the applicant fails to make said
deposit within the time prescribed herein, the Planning Board be authorized
to dismiss the application without prejudice subject to the right
of the applicant to seek reinstatement by notice to the Board that
said deposits have been posted.
(c)Â
With regard to inspection fees, the Borough Engineer shall not
perform any inspection if sufficient funds to pay for the inspections
are not on deposit, provided that any required health and safety inspections
shall be made and charged back against the replenishment of funds.
Failure to post and maintain inspection fee deposits in accordance
with these requirements will subject the developer to a stop-work
order and/or suspension of construction permits.
C.Â
Whenever an amount of money in excess of $5,000 is deposited by an
applicant or developer with the Borough for professional services
employed by the Borough for the review of submitted applications for
development pursuant to this chapter, or for inspections pursuant
to this chapter, or to satisfy the guarantee requirements pursuant
to of this chapter, the money, until repaid or applied to the purposes
for which it is deposited, including the applicant's or developer's
portion of the interest earned thereon, except as otherwise provided
in this section, shall continue to be the property of the applicant
or developer and shall be held in trust by the municipality in accordance
with the following:
(1)Â
The money deposited shall be held in escrow.
(2)Â
The money shall be deposited by the Borough of Spotswood in
a banking institution or savings and loan association in New Jersey
insured by an agency of the federal government, or in any other fund
or depository approved for such deposits by the state.
(3)Â
The money shall be deposited in an account bearing interest
at the minimum rate currently paid by the institution or depository
on time or savings deposits.
(4)Â
The Borough of Spotswood shall notify the applicant in writing
of the name and address of the institution or depository in which
the deposit is made and the amount of the deposit.
(5)Â
The Borough of Spotswood shall not be required to refund an
amount of interest paid on a deposit which does not exceed $100. However,
if the amount exceeds $100, that entire amount shall belong to the
applicant or developer and shall be refunded to him/her by the Borough
annually or at the time the deposit is repaid or applied to the purposes
for which it was deposited, as the case may be, except that the Borough
may retain for administrative expenses a sum equivalent to not more
than 33 1/3% of that entire amount which shall be in lieu of all other
administrative and custodial expenses.
A.Â
Required improvements. Applicants shall be required, as a condition
for approval of a subdivision, site plan or conditional use, to pay
their pro rata share of the cost providing reasonable and necessary
street improvements and/or water, sewerage and drainage facility improvements,
and any necessary easements therefor located outside the property
limits of the subject premises, but indicated in the Borough Master
Plan and necessitated or required by construction or improvements
within such subdivision or development. The following criteria shall
be utilized in determining the developer's proportionate pro rata
monetary share for the necessary off-tract developments.
B.Â
Improvements to be constructed at the expense of the developer. In
cases where the need for an off-tract improvement is reasonably created
by the proposed subdivision or development and where no other property
owners receive a special benefit thereby (as opposed to a mere incidental
benefit), the applicant may be required, as a condition of approval
and at the applicant's sole expense, to acquire and/or improve lands
outside the tract and dedicate such lands to the Borough of Spotswood
or Middlesex County or, in lieu thereof, require the subdivider or
developer to deposit with the Borough a sum of money sufficient to
allow the Borough to acquire and/or improve such lands on conditions
it may deem appropriate under the circumstances.
C.Â
General standards for other improvements. In cases where the need
for any off-tract improvement to be implemented now or in the future
is reasonably necessitated by the proposed development application,
and where it is determined that properties outside the development
also will be benefited by the improvement, the following criteria,
together with the provisions or rules and regulations of the Borough
of Spotswood or any department thereof, may be utilized in determining
the developer's proportionate share of such improvements:
(1)Â
Sanitary sewers. For distribution facilities, including the
installation, relocation or replacement of collector, trunk and interceptor
sewers and the installation, relocation or replacement of other appurtenances
associated therewith, the applicant's proportionate share shall be
computed as follows:
(a)Â
The capacity and the design of the sanitary sewer system shall
be based on the Rules and Regulations for the Preparation and Submission
of Plans for Sewerage Systems, New Jersey State Department of Environmental
Protection and Energy, and all Spotswood Borough sewer design standards,
including infiltration standards.
(b)Â
Developer's pro rata share:
[1]Â
The capacity of the existing system to serve the
entire improved drainage area shall be computed. If the system is
able to carry the total development drainage basin, no improvement
or enlargement cost will be assigned to the developer although some
charges including, but not limited to, capacity charges may be imposed.
If the existing system does not have adequate capacity for the total
development drainage basin, the prorated enlargement or improvement
share shall be computed as follows:
Developer's cost
|
=
|
Development gpd
|
Total enlargement or improvement cost
|
Total tributary gpd
|
[2]Â
If it is necessary to construct a new system in
order to develop the subdivision or development, the prorated enlargement
share to the developer shall be computed as follows:
Developer's cost
|
=
|
Development tributary gpd
|
Total project cost
|
Total tributary gpd to new system
|
[3]Â
The plans for the improved system or the extended
system shall be prepared by the developer's engineer. All work shall
be calculated by the developer and approved by the Borough Engineer.
(2)Â
Roadways. For street widening, alignment, channelization of
intersections, construction of barriers, new or improved traffic signalization,
signs, curbs, sidewalks, trees, utility improvement uncovered elsewhere,
the construction or reconstruction of new or existing streets and
other associated streets or traffic improvements, the applicant's
proportionate cost shall be determined as follows:
(a)Â
The applicant's engineer shall provide the Borough Engineer
with the existing and anticipated peak-hour volumes which impact the
off-tract areas in question, which volumes shall analyze pedestrian,
bicycle and motor vehicle traffic.
(b)Â
The applicant shall furnish a plan for the proposed off-tract
improvements, which shall include the estimated peak-hour traffic
generated by the proposed development. The ratio of the peak-hour
traffic generated by the proposed development to the future peak-hour
traffic shall form the basis of the proportionate share. The prorated
share shall be computed as follows:
Developer's cost
|
=
|
Additional peak-hour traffic generated by the development
|
Total cost of road-way improvement and/or extension
|
Future total peak-hour traffic
|
(3)Â
Drainage improvements. For the stormwater and drainage improvements,
including the installation, relocation or replacement of storm drains,
culverts, catch basins, manholes, riprap or improved drainage ditches
and appurtenances thereto and the relocation or replacement of other
storm drainage facilities or appurtenances associated therewith, the
applicant's proportionate share shall be determined as follows:
(a)Â
The capacity and design of the drainage system to accommodate
stormwater run off shall be based on a method described in Urban Hydrology
for Small Watersheds, Technical Release 55, Soil Conservation Service
USDA, January 1975, as amended, and shall be computed by the developer's
engineer and approved by the Borough Engineer.
(b)Â
The capacity of the enlarged, extended or improved system required
for the subdivision or development and areas outside of the subdivision
or development shall be computed by the developer's engineer and be
subject to the approval of the Borough Engineer. The plans for the
improved system shall be prepared by the developer's engineer and
the estimated cost of the enlarged system shall be calculated by the
Borough Engineer.
(c)Â
The prorated share for the proposed improvement shall be computed
as follows:
Developer's cost
|
=
|
Development cfs
|
Total enlargement or improvement cost of drainage facilities
|
Total tributary cfs
|
(4)Â
Water.
(a)Â
Where no public water is accessible, the applicant shall deposit
funds in escrow with the Borough of Spotswood in an amount equal to
the cost of connecting the subdivision to an existing public water
supply system calculated on the basis of 200 feet per unit.
(b)Â
The escrow amount shall be calculated by determining the costs
of providing such water main extension as charged by the public water
utility for such service, including, but not limited to, materials,
installation, taxes, appurtenances, surcharges, if any, etc.
D.Â
Escrow accounts. Where the proposed off-tract improvement is to be
undertaken at a future date, funds required for the improvement shall
be deposited to the credit of the Borough of Spotswood in a separate
account until such time as the improvement is constructed. In lieu
of a cash escrow account, developers may present irrevocable letters
of credit for the term required in a form acceptable to the Borough
Attorney.
(1)Â
If the off-tract improvement is not begun within 10 years of
the deposit, all monies and interest shall be returned to the applicant
or the letter of credit, as the case may be, surrendered.
(2)Â
An off-tract improvement shall be considered "begun" if the
Borough of Spotswood has taken legal steps to provide for the design
and financing of such improvements.
E.Â
Referral to Borough Council.
(1)Â
Where applications for development suggest the need for off-tract
improvements, whether to be installed in conjunction with the development
in question or otherwise, the Planning Board shall forthwith forward
to the Borough Council a list and description of all such improvements
together with a request that the Borough Council determine and advise
the Board of the procedure to be followed in construction or installation
thereof, including timing. The Board shall defer final action upon
the subdivision or site plan until receipt of the Borough Council
determination or the expiration of 90 days after the forwarding of
such list and description to the Borough Council without determination
having been made, whichever comes sooner.
(2)Â
The Borough Council, within 90 days after receipt of said list
and description, shall determine and advise the Planning Board concerning
the procedure to be followed and advise the Board with regard to suggested
conditions of approval, if any, to adequately protect the municipality.
(3)Â
In the event that the Planning Board is required by statute
to act upon the application prior to receipt of the Borough Council's
determination as to construction of off-tract improvements, it shall
request the applicant to consent to an extension of time within which
to act, of sufficient duration to enable the Borough Council to make
the aforesaid determination. In the event that the applicant is unwilling
to consent to the requested extension of time, the Planning Board
shall, in its discretion, either itself determine the procedure to
be followed in constructing the aforesaid improvements, or shall condition
its approval upon the subsequent determination of the Borough Council.
F.Â
Implementation of off-tract improvements.
(1)Â
In all cases, developers shall be required to enter into an
agreement or agreements with Spotswood Borough in regard to off-tract
improvements, in accordance with this chapter and any other ordinances,
policies, rules and regulations of the Borough of Spotswood, Middlesex
County and the State of New Jersey any any departments, authorities
or agencies thereof.
(2)Â
Where properties outside the subject tract will be benefited by the improvements, the Borough Council may require the applicant to escrow sufficient funds, in accordance with § 120-1004D, Escrow accounts, hereinabove, to secure the developer's pro rata share of the eventual cost of providing future structural improvements based upon the standards expressed herein.
(3)Â
Where properties outside the subject tract will benefit by the
improvements, the Borough Council may determine that the improvement
or improvements are to be installed by the municipality as a general
improvement, the cost of which is to be borne as a general expense.
If the Borough Council shall determine that the improvement or improvements
shall be constructed or installed as a general improvement, the Borough
Council may direct the Planning Board to estimate, with the aid of
the Borough Engineer or such other persons who have pertinent information
or expertise, the amount, if any, by which the total cost thereof
will exceed the total amount by which all properties, including the
subject tract, will be specifically benefited thereby, and the subdivider
or developer shall be liable to the municipality for such expense.
(4)Â
If the Borough Council shall determine that the improvement
or improvements shall be constructed or installed as a local improvement,
all or a part of the cost of which is to be assessed against properties
benefited thereby in proportion to the benefits conferred by the improvements
in accordance with Chapter 56 of Title 40 of the Statutes of the State
of New Jersey (N.J.S.A. 40:56-1 et seq.), the developer may be required
to sign an agreement acknowledging and agreeing to this procedure
and, in addition, the Borough Council may require that the developer
shall be liable to the municipality, in addition to the amount of
any special assessments against the subject property for benefits
conferred by the improvement or improvements, the difference between
the total cost actually incurred and the total amount by which all
properties, including the subject tract, are specially benefited by
the improvement as the same may be determined by the Board of Improvement
Assessors.
(5)Â
If the Borough Council shall determine that the improvements
are to be constructed or installed by the applicant, such agreement
may contain provisions, consistent with the standards in this chapter
and any other rules, regulations or policies of the Borough of Spotswood,
County of Middlesex and the State of New Jersey and any departments,
authorities or agencies thereof with jurisdiction therein, whereby
the applicant shall be reimbursed by the municipality or otherwise,
as a result of any participation fees, connection charges, charges
paid in regard to developer's agreements with other applicants and
the like, all in accordance with an agreement between the Borough
Council and the applicant.
(6)Â
In determining the procedures to be followed in the event of
the submission of a list and request from the Planning Board, the
Borough Council shall be guided by the following standards and considerations:
(a)Â
The local trends in regard to the probability of development
within the drainage or circulation area in question and the intensity
of such development;
(b)Â
The risk and exposure that neighboring areas are subject to
in the event that the improvements to be required are delayed;
(c)Â
The extent to which temporary measures may sufficiently alleviate
the condition or conditions requiring the off-tract improvement and
the likelihood that larger, regional or subregional facilities will
be required in the future to serve the development tract and the general
area of the municipality in which the same is located; and
(d)Â
The extent to which the health, safety and welfare of the residents,
both current and future, depend upon the immediate implementation
of the off-tract improvement.