Exciting enhancements are coming soon to eCode360! Learn more 🡪
Borough of Elizabethville, PA
Dauphin County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
[Ord. No. 338, 1/10/2011]
1. 
The applicant should provide a financial guarantee to Elizabethville Borough for the timely installation and proper construction of all stormwater management controls as required by the approved SWM site plan and this chapter, equal to 110% of the full construction cost of the required controls in accordance with the Municipalities Planning Code.
2. 
At the completion of the project and as a prerequisite for the release of the financial guarantee, the applicant shall:
A. 
Provide a certification of completion from an engineer, architect, surveyor or other qualified professional, verifying that all permanent facilities have been constructed according to the SWM site plan and report and approved revisions thereto.
B. 
Provide a set of record drawings.
C. 
Request a final inspection from Elizabethville Borough to certify compliance with this chapter, after receipt of the certification of completion and record drawings by Elizabethville Borough.
[Ord. No. 338, 1/10/2011]
1. 
The SWM site plan and report for the project site shall describe the future operation and maintenance responsibilities. The operation and maintenance description shall outline required routine maintenance actions and schedules necessary to ensure proper operation of the stormwater control facilities.
2. 
The SWM site plan and report for the project site shall establish responsibilities for the continuing operation and maintenance of all proposed stormwater control facilities, consistent with the following principles:
A. 
If a development consists of structures or lots that are to be separately owed and in which streets, sewers, and other public improvements are to be dedicated to Elizabethville Borough, stormwater control facilities/BMPs may also be dedicated to and maintained by Elizabethville Borough.
B. 
If a development site is to be maintained in a single ownership or if sewers and other public improvements are to be privately owned and maintained, then the ownership and maintenance of stormwater control facilities/BMPs shall be the responsibility of the owner or private management entity.
C. 
Facilities, areas, or structures used as stormwater BMPs shall be enumerated as permanent real estate appurtenances and recorded as deed restrictions or easements that run with the land.
D. 
The SWM site plan and operation and maintenance (O&M) agreement shall be recorded as a restrictive deed covenant that runs with the land.
E. 
Elizabethville Borough may take enforcement actions against an applicant for failure to satisfy any provision of this chapter.
3. 
Elizabethville Borough, upon recommendation of the Municipal Engineer, shall make the final determination on the continuing maintenance responsibilities prior to final approval of the SWM site plan and report. Elizabethville Borough may require a dedication of such facilities as part of the requirements for approval of the SWM site plan. Such a requirement is not an indication that the Borough will accept the facilities. Elizabethville Borough reserves the right to accept or reject the ownership and operating responsibility for any portion of the stormwater management controls.
4. 
If Elizabethville Borough accepts ownership of stormwater BMPs, Elizabethville Borough may, at its discretion, require a fee from the applicant to the Borough to offset the future cost of inspections, operations, and maintenance.
5. 
It shall be unlawful to alter or remove any permanent stormwater BMP required by an approved SWM site plan, or to allow the property to remain in a condition which does not conform to an approved SWM site plan, unless Elizabethville Borough grants an exception in writing.
[Ord. No. 338, 1/10/2011]
1. 
Prior to final approval of the SWM site plan and report, the applicant shall sign the operation and maintenance (O&M) agreement (Appendix A)[1] covering all stormwater control facilities that are to be privately owned. The operation and maintenance (O&M) agreement shall be recorded with the SWM site plan and made a part thereto.
[1]
Editor's Note: The appendixes are on file in the Borough offices.
2. 
Other items may be included in the operation and maintenance (O&M) agreement where determined necessary to guarantee the satisfactory operation and maintenance of all BMP facilities. The operation and maintenance (O&M) agreement shall be subject to the review and approval of Elizabethville Borough and its Solicitor.
3. 
The owner is responsible for operation and maintenance of the stormwater BMPs. If the owner fails to adhere to the operation and maintenance (O&M) agreement, Elizabethville Borough may perform the services required and charge the owner appropriate fees. Nonpayment of fees may result in a lien against the property.