The standards and procedures as prescribed herein shall be applicable
to those mobile home parks which are constructed, remodeled, altered
or expanded after the effective date of this chapter.
Site plan. No approval to construct or expand a mobile home park,
as required by this chapter, shall be granted until such time as a
site plan shall be first submitted to, and approved by, the Township
pursuant to the terms of this chapter as a major subdivision. Such
site plan shall include all information required for a major subdivision.
Permits required. It shall be unlawful for anyone to construct, remodel,
alter, operate or extend any mobile home park within the Township
without first obtaining all required permits and approvals therefor.
All design standards for mobile home parks, including but not limited
to tract size, utility requirements, development options, maximum
density, open space, off-street parking, lot or lease lot sizes, etc.,
shall be as set forth in Zoning Ordinance § 350-31(f)(2)(C)(iii).