[HISTORY: Adopted by the Board of Supervisors of the Township
of North East 9-6-2011 by Ord.
No. 2011-003. Amendments noted where applicable.]
Table of Contents
Table of Contents
- Part I: Administrative Legislation
- Ch 1 General Provisions
- Ch 56 Planning Commission
- Ch 75 Salaries and Compensation
- Part II: General Legislation
- Ch 87 Animals
- Ch 94 Bluff Area Setbacks
- Ch 100 Buildings and Structures, Dangerous
- Ch 105 Buildings, Numbering of
- Ch 111 Burning, Open
- Ch 117 Cable Television
- Ch 123 Construction Codes, Uniform
- Ch 138 Driveways
- Ch 146 Emergency Services Reimbursement
- Ch 154 Floodplain Management
- Ch 172 Junkyards and Scrap Yards
- Ch 205 Municipal Claims and Liens
- Ch 214 Nuisances
- Ch 220 Parks and Recreation Areas
- Ch 223 Peddling and Soliciting
- Ch 231 Rental Property
- Ch 240 Sewers and Sewage Disposal
- Ch 246 Sexually Oriented Businesses
- Ch 252 Snowmobiles
- Ch 257 Solid Waste
- Ch 263 Stormwater Management
- Ch 263 Art I General Provisions
- ยงย 263-1 Short title.
- ยงย 263-2 Findings.
- ยงย 263-3 Purpose.
- ยงย 263-4 Statutory authority.
- ยงย 263-5 Applicability.
- ยงย 263-6 Repealer.
- ยงย 263-7 Severability.
- ยงย 263-8 Compatibility with other requirements.
- ยงย 263-9 Duty of persons engaged in development of land.
- ยงย 263-10 Municipal liability disclaimer.
- Ch 263 Art II Terminology
- ยงย 263-11 Word usage.
- ยงย 263-12 Definitions.
- Ch 263 Art III Stormwater Management Standards
- ยงย 263-13 General requirements.
- ยงย 263-14 Exemptions/modifications.
- ยงย 263-15 Waivers.
- ยงย 263-16 Volume controls.
- ยงย 263-17 Rate controls.
- ยงย 263-18 Sensitive areas and stormwater hotspots.
- Ch 263 Art IV E&S Standards
- ยงย 263-19 Erosion and sedimentation requirements during earth disturbance activities.
- Ch 263 Art V Protected Watershed Standards
- ยงย 263-20 Protected watershed requirements.
- Ch 263 Art VI Riparian Buffer Standards
- Ch 263 Art VII Design Criteria
- ยงย 263-21 Stormwater management and drainage facilities.
- ยงย 263-22 Calculation methodology.
- Ch 263 Art VIII SWM Site Plan and Report Requirements
- ยงย 263-23 General requirements.
- ยงย 263-24 Contents.
- ยงย 263-25 Submission.
- ยงย 263-26 Review.
- ยงย 263-27 Modification of plans.
- ยงย 263-28 Resubmission of disapproved SWM site plan and report.
- ยงย 263-29 Authorization to construct and term of validity.
- ยงย 263-30 Record drawings; completion certificate and final inspection.
- Ch 263 Art IX Easements
- ยงย 263-31 General requirements.
- Ch 263 Art X Maintenance Responsibilities
- ยงย 263-32 Financial guarantee.
- ยงย 263-33 Description and establishment of responsibilities.
- ยงย 263-34 Maintenance agreement for privately owned stormwater facilities.
- Ch 263 Art XI Inspections
- ยงย 263-35 Schedule of inspections.
- ยงย 263-36 Right to enter property.
- Ch 263 Art XII Enforcement and Penalties
- ยงย 263-37 Notification.
- ยงย 263-38 Enforcement.
- ยงย 263-39 Public nuisance.
- ยงย 263-40 Suspension and revocation.
- ยงย 263-41 Violations and penalties.
- ยงย 263-42 Appeals.
- Ch 263 Art XIII Prohibitions
- ยงย 263-43 Prohibited discharges and connections.
- ยงย 263-44 Roof drains.
- ยงย 263-45 Alteration of BMPs.
- Ch 263 Art XIV Fees and Expenses
- ยงย 263-46 General.
- ยงย 263-47 Expenses covered by fees.
- ยงย 263-48 Recording of approved SWM site plan and related agreements.
- Ch 269 Streets and Sidewalks
- Ch 275 Subdivision and Land Development
- Ch 290 Taxation
- Ch 328 Vehicles and Traffic
- Ch 339 Water
- Ch 350 Zoning
- Disposition List
- Ch DL Disposition List