Exciting enhancements are coming soon to eCode360! Learn more 🡪
Borough of Collingdale, PA
Delaware County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Borough Council of the Borough of Collingdale 10-5-2015 by Ord. No. 705 (Ch. 1, Part 6, of the 1987 Code of Ordinances). Amendments noted where applicable.]
The Borough of Collingdale hereby resolves that all fees, license fees and permit fees for the following shall be established from time to time by resolution of Borough Council:
Amusement Devices
Each mechanical or electronic amusement device
Each pool table
Building/Construction
Plan examination and building permit
Minimum fee
$0 - $20,000 cost
$20,001 - $100,000 cost
$100,000 - above cost
Sidewalks, curbs, patios, walks and driveways
Minimum fee
Each $1,000 cost
Moving a building
Each $1,000 value of the building in its completed usable conditions
Demolition of a building
Each 10 feet of building height, plus
Each additional foot of frontage exceeding 50 feet
Electrical
Minimum fee - each $1,000 of cost
Each additional $1,000 of cost
Plumbing
Replacement or repair
Minimum fee (one fixture)
Each additional fixture
New building
Minimum fee (up to five fixtures)
Each additional fixture
Sewer line replacement
Certificate of use and occupancy
Contractors (plumbing, heating and cooling)
Initial registration fee
Annual renewal
Contractor Licensing
Builders, developers and contractors of nonresidential work
Builders and developers of new residential projects
Swimming pool and sign contractors
Contractors of residential alterations and additions
Food Handling
Licenses
Public eating and drinking places
Food establishments
Bakeries
Food vendors
Vending machines
Late charges
Foodhandler certificates
Late charges
Garage/Yard Sales
Permit fee
Grading and Excavating
Permit fee per building lot
Junkyards
Annual operating and license fee
Application fee to become licensed dealer
Laundromats
Permit to operate
Push Cart
Permit fee
Motor Vehicles
Storage permit fee
Sign Construction and Installation
Each sign
Annual inspection
Highway Openings and Excavations
Permit fee for opening (to 10 feet in length)
Each additional 100 feet or fraction
Restoration fee
Bituminous concrete on cement concrete base
Bituminous concrete on bituminous concrete base
Rental Property
Inspection of all units; required standards
Rental dwelling license fee per unit
Reinspection fee charge per unit per reinspection
Use and occupancy permit fee per unit
Reinspection fee charge per unit per reinspection
Subdivision and Land Development
Application fees, review fees and escrow accounts for subdivision and land development applications
Residential
Sketch plan fee per plan plus per lot and/or dwelling unit for lots and/or dwellings exceeding six in number
Preliminary plan fee plus per building or addition and per acre or portion thereof
Final plan fee per plan plus per building or addition and per acre or portion thereof
Nonresidential
Sketch plan fee
Preliminary plan fee
Final plan fee
Swimming Pools
Annual license fee
Transient Retail Merchants
License fee
1 day
1 week
1 month
1 year
Water Mains/Lines
Annual inspection fee per mile of water mains owned by utility companies
All ordinances or parts of ordinances in conflict with the provisions of this chapter are hereby repealed to the extent of such conflict. The Borough reserves the right at any time by ordinance to amend or otherwise modify or repeal this chapter.
Should any section, subsection, paragraph, sentence, law or phrase of this chapter be declared invalid for any reason whatsoever, such decision shall not affect the remaining portions of this chapter, which shall remain in full force and effect, and for this purpose the provisions of this chapter are hereby declared to be severable.
This chapter shall become effective immediately upon its adoption.