[1973 Code § 88-17]
The height, location and use of all buildings now under construction
or which within six months shall be under active construction, authorized
by permits issued by the Borough of Rockleigh prior to the adoption
of this chapter shall be unaffected by this chapter, except as otherwise
provided herein, and provided such building or buildings be completed
within one year from the date of permit.