The following improvements, as shown on a recorded plat plan,
shall be provided by the developer in accordance with the details
and/or specifications cited in the Design Standards section of this
chapter or in the Borough's construction standards as specified.
The developer/owner shall give certified a copy to Borough for:
C. Sidewalks and crosswalks.
F. Sanitary sewage disposal.
G. Water supply and fire hydrants.
H. Stormwater management facilities.
I. Erosion and sedimentation control measures.
When the developer has completed the required public improvements
in a plan, in accordance with the Final Release from Financial Security
section of this chapter, the developer shall notify the Borough, in writing, by
certified or registered mail. Within 10 days of the receipt of the
notification, the Borough Council shall authorize the Borough Engineer
to inspect the public improvements in the plan to determine compliance
with the design standards specified in the Design Standards section
of this chapter or as required by the Borough's Construction Standards.
Upon authorization by the Borough Council, the Borough Engineer
shall perform a final inspection of the public improvements. The procedures
and timing of such inspection, notifications and action shall follow
that identified in the Inspections section of this chapter.