Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Stratford, CT
Fairfield County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
Applications for approval of all uses named as special cases by these Regulations, or for the approval of any use not provided for or allowed by these Regulations, shall be made to the Zoning Commission. In addition to specific uses requiring special case approval, special case approval is required for any proposal having any of the following characteristics:
1) 
Any increase in floor area by the following amounts per use:
Use
Square Feet
Restaurant
3,000
Commercial/office
5,000
Industrial
20,000
Warehouse/wholesale/storage
50,000
2) 
Any new building, change of use or combination thereof, which requires an increase of parking by 50 spaces or greater.
3) 
Any building/use in which a drive-through window is proposed.
4) 
Any significant alteration of a previous special case, as determined by the Zoning Commission.
5) 
Any reuse of vacant commercial or industrial space greater than 150,000 square feet, regardless of the proposed use.
1. 
Purpose. Site plan review promotes the health, safety and general welfare of the Town. It is further the intent to ensure optimum overall conservation, protection, preservation, development and use of the natural and man-related resources of the Town. It is also the intention to ensure consistent implementation of local zoning objectives. It is not the intent of this regulation to prohibit any land use activity but to allow all land use activities which will meet the standards set forth in this regulation.
2. 
Site plan. A plan showing accurately and with complete dimensions the boundaries of a site and the location of all buildings, structures, uses, and principal site development features proposed for a specific parcel of land. Such a plan must be prepared in accordance with the Town of Stratford Zoning Regulations, reflecting all local provisions for vehicular and pedestrian circulation, parking, landscaping, buffers, signage, lighting, drainage, utilities and other needs produced by the proposed development. All submitted plans shall be signed and sealed by an engineer, architect or landscape architect registered and licensed to conduct business in the State of Connecticut, dated and meeting the requirements set forth in this Section 20.
Those uses which are named as special cases by these Regulations shall be considered to be permitted uses in the districts under which they are named, subject to approval by the Commission as to each specific use. Each of these uses is declared to be of such peculiar and unusual nature in its effect on an area that in order to have it comply with the purposes of the zoning regulations it is necessary to consider it as a special case. In reviewing a special case application, the Commission shall require adherence to the following special case criteria and objectives and site plan objectives set forth in the following sections. The Commission may, after public notice and hearing in the same manner required by law for zoning amendments, and by the affirmative vote of four or more members present at the hearing, approve the use after making special application of these Regulations in harmony with their general intent by stipulating such restrictions as appear to the commission to be reasonable and the minimum necessary to protect property values in the district as a whole and the public health, safety and welfare. If the Commission determines that an application does not comply with the following criteria and objectives it shall deny the application.
Before approving any special case the Commission shall consider the following special case criteria and objectives in addition to all site plan objectives set forth in Section 20.2.2 of these Regulations.
20.2.1 
Special case criteria and objectives.
A) 
The proposed use shall be in conformance to all requirements of the district in which it is located in addition to any other standard prescribed by these Regulations.
B) 
The location, size and intensity of such use shall be compatible and harmonious in relation to the size of the property and existing neighborhood development.
C) 
The proposed use shall be in conformance with the Town Plan of Development.
D) 
The design, location and specific details of the proposed use shall not adversely affect safety in the streets nor increase traffic congestion in the area nor interfere with the pattern of highway circulation. Information on past and present roadway conditions, existing roadway capacity, traffic accidents, existing and projected traffic volumes (ADT, Peak a.m. and Peak p.m.) existing and projected volume/capacity ratios, existing and projected levels of service and adequacy of traffic signalization and channelization shall be required for all projects impacting traffic conditions.
E) 
The emission of noise, light, smoke, odor, gas, dust or vibration shall not adversely affect land, water or air quality.
F) 
The proposed use shall not adversely affect the tax valuation of neighboring properties as a result of the proposed use.
G) 
The proposed use shall not create any fire or police hazards.
20.2.2 
Site plan objectives. In reviewing a site plan, the commission shall take into consideration the health, safety and general welfare of the public and may require such modifications it shall deem necessary to ensure the accomplishment of the following objectives. If the Commission determines that an application does not comply with the following objectives it shall deny the application.
20.2.2.1 
General building and property considerations. That the location, size, design and specific details of all proposed buildings and uses shall be compatible and harmonious with the character and appearance of the surrounding neighborhood. The following aspects shall be evaluated to determine conformity to this objective.
A) 
The architectural design of all buildings including materials, color, elevations, roof line, height, size, location, bulk and signage.
B) 
The specific nature of the use including but not limited to occupancy, number of employees, hours of operation, etc.
C) 
The provision for open space and/or recreation areas.
D) 
The protection, preservation and/or enhancement of the natural environment including topography, vegetation, watercourses, wetlands, scenic views, historical structures, etc.
20.2.2.2 
Traffic, pedestrian access, circulation and parking. That all vehicular and pedestrian accessways, vehicular circulation patterns and off-street parking areas are safely designed to prevent traffic and pedestrian hazards both on and off the site. The following aspects shall be evaluated to determine conformity to this objective.
A) 
The number, location, width, grade and alignment of vehicular and pedestrian entrances, exits, drives and walkways and the adequacy of pedestrian drop-off areas.
B) 
The distance of entrances and exits from street corners, other accessways and places of public assembly.
C) 
The visibility in both directions at all entrances and exits of the site.
D) 
The extent, nature and arrangement of parking facilities, entrances and exits including the location and design of vehicle maneuvering areas, back around areas and fire lanes and the adequacy of vehicular stacking lanes.
E) 
The minimization of curb cuts and the interconnection of adjoining parking areas in order to encourage safe and convenient circulation.
F) 
The provision of safety devices necessary to protect life and property such as traffic signs, crosswalks, guardrails, etc.
20.2.2.3 
Landscaping and screening. That the proposed development will protect the environmental quality of the site and preserve and enhance adjacent property values. The following aspects shall be evaluated to determine conformity to this objective.
A) 
Existing trees shall be preserved to the maximum extent possible particularly within all setback and buffer areas.
B) 
The adequacy of landscaping within and bordering parking and loading areas.
C) 
The location, height and materials of walks, fences, berms, hedges so as to ensure compatibility with adjacent development.
20.2.2.4 
Lighting.
A) 
All exterior lights and illuminated signs shall be designed and directed so as to prevent objectionable light at, and glare across, the property lines.
B) 
All exterior light fixtures shall be located at a minimum height from the ground and the maximum distance from the property line necessary to provide adequate and safe lighting.
20.2.2.5 
Public health and safety. That all utility systems shall be suitably located, adequately designed and properly installed to serve the proposed uses and to protect the environment from adverse air, water or land pollution. All buildings and uses shall be directly accessible for fire, police, and emergency medical services.
A) 
All refuse and recycling areas shall be located near the service entrance and shall be screened or otherwise enclosed by plantings, walls or fencing.
B) 
The applicant shall prepare pre-development and post-development calculations of the stormwater runoff and provide a design that demonstrates a zero impact to the Town's storm drainage system, including natural waterway systems. Accordingly, the applicant shall evaluate the impacts to downstream conditions. The analysis shall include impacts from the quantity of runoff as well as the quality of the runoff. The drainage collection system shall be designed in accordance with the requirements of the Connecticut Stormwater Quality Manual, as amended, as well as the requirements of Town stormwater ordinances. In addition to best management practices currently available and in the absence of specific design criteria which may not be identified in these documents or other requirements of the Town, the applicant shall, at a minimum, design the stormwater collection system to retain the first inch of runoff on site, and provide a zero increase in the peak rate of runoff from the site for the twenty-five-year storm, with an evaluation of the impacts from a fifty- and 100-year storm. After the evaluation is complete, if a larger design storm is warranted as determined in consultation with the Town Engineer, the applicant shall design the drainage for no net increase in the runoff from the 100-year storm.
C) 
Provision shall be made for all necessary sedimentation and erosion controls during construction. [Effective 12-27-1991]
Any petition approved as a special case and no building permits having been secured within 18 months of the final approval by the Commission or no extension having been granted by the Planning and Zoning Administrator, the area shall revert back to its original status.
The Planning and Zoning Administrator may grant an extension of 18 months, not to exceed a cumulative total of six years, to obtain building permits for any petition approved as a special case. The Planning and Zoning staff shall report back to the Zoning Commission administratively when an extension is granted. The Planning and Zoning Administrator may choose to refer any request for an extension to the Zoning Commission for an administrative review. Any extension sought after the initial six years from the date of approval shall return to the Zoning Commission for an administrative review.
Site plan review is the standards-based process by which development applications are examined for consistency with the requirements of these Regulations. Site plan review shall be required if:
a. 
An application involves a variance (Section 21);
b. 
An application involves a special case or unnamed uses (Section 20);
c. 
An application involves a coastal site plan approval, with exceptions (Section 3.1.1);
d. 
An application involves a subdivision;
e. 
An application involves a zone change; or
f. 
An application involves a development pursuant to C.G.S. § 8-30(g).
An application for site plan approval may only be submitted by the owner of the property, a holder of a legal interest in the subject property, or the owner's or holder's agent. The application shall be submitted to the Zoning Commission on a form provided by the Zoning Office and shall include the requisite fee for review of the site plan application and the following information:
a) 
Legal data:
1. 
A list of the names and addresses of all property owners of record as per the Tax Assessor's records within 100 feet of all property lines of the subject property.
2. 
Lot dimensions and survey data, and section and lot numbers of the subject property.
3. 
Reservations, easements, and areas dedicated to public use, if known, shall be shown.
b) 
Site plan review requirements.
1. 
The site plan must be drawn to a scale of 40 feet to one inch and shall include the subject site and the adjacent street(s) to the near curbline and, as may be relevant to the application, adjacent streets and the closest 50 feet of adjacent lots.
2. 
Proposed and existing structures and amenities, including, but not limited to, footprints of foundations, porches, decks, walkways, travel lanes, and parking areas, shall be indicated. Sufficient dimensions shall be shown to allow all zoning requirements to be confirmed.
3. 
Existing natural features, such as watercourses, wetlands, and trees of two-inch caliper and larger, including street trees, shall be indicated. Proposed landscaping (including trees and/or shrubs, lawn, other landscape features and natural terrain not to be disturbed) shall be indicated.
4. 
Zone development standards/table required and proposed shall be indicated in a table. Existing and proposed street and lot lines, setback lines, building heights, roof profiles, amounts of floor area by use, amounts of lot area by open use, amounts of parking required and provided, and outdoor illumination shall be indicated.
5. 
Existing and proposed grades shall be shown at two-foot intervals.
6. 
One or more benchmarks that can be used in the field to verify conditions shall be indicated.
7. 
Survey: A class A-2 survey of the property, improvements and easements.
8. 
Impact analysis: An impact analysis of the development upon storm drainage, sanitary sewerage, traffic, site conditions and/or environmental resources, including environmental impacts to coastal resources and the ecosystems and habitats of Long Island Sound.
c) 
Site plan review standards.
1. 
In acting upon any application for site plan approval, the Zoning Commission shall determine that all requirements of the Zoning Regulations of the Town of Stratford are met and that all applications comply with site plan review objectives set forth in Section 20.2.2.