A.
Appointment; duties and responsibilities.
(1)
The Township's Zoning Officer, appointed in accordance with Chapter 140 of the Township of Straban Code of Ordinances, entitled "Zoning," is hereby appointed to administer and enforce this chapter and is referred to herein as the "Floodplain Administrator." The Floodplain Administrator may:
(a)
Fulfill the duties and responsibilities set forth in these regulations;
(b)
Delegate duties and responsibilities set forth in these regulations
to qualified technical personnel, plan examiners, inspectors, and
other employees; or
(c)
Enter into a written agreement or written contract with another
agency or private sector entity to administer specific provisions
of these regulations.
(2)
Administration of any part of these regulations by another entity
shall not relieve the community of its responsibilities pursuant to
the participation requirements of the National Flood Insurance Program
as set forth in the Code of Federal Regulations at 44 CFR § 59.22.
B.
In the absence of a designated Floodplain Administrator, the Floodplain
Administrator duties are to be fulfilled by the Township Manager.
A permit shall be required before any construction or development
is undertaken within any area of Straban Township.
A.
The Floodplain Administrator shall issue a permit only after it has
been determined that the proposed work to be undertaken will be in
conformance with the requirements of this and all other applicable
codes and ordinances.
B.
Prior to the issuance of any permit, the Floodplain Administrator
shall review the application for the permit to determine if all other
necessary government permits required by state and federal laws have
been obtained, such as those required by the Pennsylvania Sewage Facilities
Act (Act 1966-537, as amended)[1]; the Pennsylvania Dam Safety and Encroachments Act (Act
1978-325, as amended)[2]; the Pennsylvania Clean Streams Act (Act 1937-394, as
amended)[3]; and the U.S. Clean Water Act, Section 404, 33 U.S.C.
1344. No permit shall be issued until this determination has been
made.
C.
In the case of existing structures, prior to the issuance of any
zoning permit, the Floodplain Administrator shall review the proposed
cost of improvements or repairs and the preimprovement market value
of the structure, so that a substantial improvement/substantial damage
determination can be made, in accordance with FEMA's Substantial
Improvement/Substantial Damage Desk Reference.
D.
In the case of existing structures, prior to the issuance of any
zoning permit, the Floodplain Administrator shall review the history
of repairs to the subject building, so that any cumulative substantial
damage concerns can be addressed before the permit is issued.
E.
During the construction period, the Floodplain Administrator or other
authorized official shall inspect the premises to determine that the
work is progressing in compliance with the information provided on
the permit application and with all applicable municipal laws and
ordinances. He/she shall make as many inspections during and upon
completion of the work as are necessary.
F.
In the discharge of his/her duties, the Floodplain Administrator
shall have the authority to enter any building, structure, premises,
or development in the identified floodplain area, upon presentation
of the proper credentials, at any reasonable hour to enforce the provisions
of this chapter.
G.
In the event the Floodplain Administrator discovers that the work
does not comply with the permit application or any applicable laws
and ordinances, or that there has been a false statement or misrepresentation
by any applicant, the Floodplain Administrator shall revoke the permit
and report such fact to the Board of Supervisors for whatever action
it considers necessary.
H.
The Floodplain Administrator shall maintain in perpetuity, or for
the lifetime of the structure, all records associated with the requirements
of this chapter, including, but not limited to, finished construction
elevation data, permitting, inspection, and enforcement.
I.
The Floodplain Administrator is the official responsible for submitting
a biennial report to FEMA concerning community participation in the
National Flood Insurance Program as requested.
J.
The responsibility, authority, and means to implement the commitments
of the Floodplain Administrator can be delegated from the person identified.
However, the ultimate responsibility lies with the person identified
in the floodplain ordinance as the Floodplain Administrator.
K.
The Floodplain Administrator shall consider the requirements of the
34 Pa. Code and the 2015 IBC and the 2015 IRC, or the latest revision
thereof as adopted by the Commonwealth of Pennsylvania.
A.
Application for such a permit shall be made, in writing, to the Floodplain
Administrator on forms supplied by Straban Township. Such application
shall contain the following:
(1)
Name and address of applicant.
(2)
Name and address of owner of land on which proposed construction
is to occur.
(3)
Name and address of contractor.
(4)
Site location, including address.
(5)
Listing of other permits required.
(6)
Brief description of proposed work and estimated costs, including
a breakout of flood-related costs and the market value of the building
before the flood damage occurred, where appropriate.
(7)
A plan of the site showing the exact size and location of the proposed
construction as well as any existing buildings or structures.
B.
If any proposed construction or development is located entirely or
partially within any identified floodplain area, applicants for permits
shall provide all the necessary information in sufficient detail and
clarity to enable the Floodplain Administrator to determine that:
(1)
All such proposals are consistent with the need to minimize flood
damage and conform with the requirements of this and all other applicable
codes and ordinances;
(2)
All utilities and facilities, such as sewer, gas, electrical, and
water systems are located and constructed to minimize or eliminate
flood damage;
(3)
Adequate drainage is provided so as to reduce exposure to flood hazards;
(4)
Structures will be anchored to prevent flotation, collapse, or lateral
movement;
(5)
Building materials are flood-resistant;
(6)
Appropriate practices that minimize flood damage have been used;
and
(7)
Electrical, heating, ventilation, plumbing, air-conditioning equipment,
and other service facilities have been designed and located to prevent
water entry or accumulation.
C.
Applicants shall file the following minimum information plus any
other pertinent information as may be required by the Floodplain Administrator
to make the above determination:
(1)
A completed permit application form.
(2)
A plan of the entire site, clearly and legibly drawn at a scale of
one inch being equal to 100 feet or less, showing the following:
(a)
North arrow, scale, and date;
(b)
Topographic contour lines, if available;
(c)
All property and lot lines, including dimensions and the size
of the site expressed in acres or square feet;
(d)
The location of all existing and proposed buildings, structures,
and other improvements, including the location of any existing or
proposed subdivision and development;
(e)
The location of all existing streets, drives, and other accessways;
and
(f)
The location of any existing bodies of water or watercourses,
identified floodplain area and, if available, information pertaining
to the floodway, and the flow of water including direction and velocities.
(3)
Plans of all proposed buildings, structures, and other improvements,
drawn at suitable scale showing the following:
(a)
The proposed lowest floor elevation of any proposed building
based upon North American Vertical Datum of 1988;
(b)
The elevation of the base flood;
(c)
Supplemental information as may be necessary under 34 Pa. Code,
the 2015 IBC, or the 2015 IRC, or the latest revision thereof as adopted
by the Commonwealth of Pennsylvania.
(4)
The following data and documentation:
(a)
Detailed information concerning any proposed floodproofing measures
and corresponding elevations.
(b)
If available, information concerning flood depths, pressures,
velocities, impact, and uplift forces and other factors associated
with a base flood.
(c)
Documentation, certified by a registered professional engineer or architect, to show that the effect of any proposed development within a floodway area (See § 140-36E of this Code.) will not increase the base flood elevation at any point.
(d)
Documentation, certified by a registered professional engineer or architect, to show that the cumulative effect of any proposed development within an AE Area/District without floodway (See § 140-36E of this Code.) when combined with all other existing and anticipated development, will not increase the base flood elevation more than one foot at any point within the community.
(e)
A document, certified by a registered professional engineer
or architect, which states that the proposed construction or development
has been adequately designed to withstand the pressures, velocities,
impact, and uplift forces associated with the base flood.
Such statement shall include a description of the type and extent
of floodproofing measures which have been incorporated into the design
of the structure and/or the development.
(f)
(g)
The appropriate component of the Department of Environmental
Protection's "Planning Module for Land Development."
(h)
Where any excavation or grading is proposed, a plan meeting
the requirements of the Department of Environmental Protection, to
implement and maintain erosion and sedimentation control.
D.
Applications for permits shall be accompanied by a fee, payable to
the municipality, based upon the estimated cost of the proposed construction
as determined by the Floodplain Administrator.
A copy of all applications and plans for any proposed construction
or development in any identified floodplain area to be considered
for approval shall be submitted by the Floodplain Administrator to
the County Conservation District for review and comment prior to the
issuance of a permit. The recommendations of the Conservation District
shall be considered by the Floodplain Administrator for possible incorporation
into the proposed plan.
A copy of all plans and applications for any proposed construction
or development in any identified floodplain area to be considered
for approval may be submitted by the Floodplain Administrator to any
other appropriate agencies and/or individuals (e.g., Planning Commission,
Municipal Engineer, etc.) for review and comment.
After the issuance of a permit by the Floodplain Administrator,
no changes of any kind shall be made to the application, permit, or
any of the plans, specifications, or other documents submitted with
the application without the written consent or approval of the Floodplain
Administrator. Requests for any such change shall be in writing and
shall be submitted by the applicant to the Floodplain Administrator
for consideration.
In addition to the permit, the Floodplain Administrator shall
issue a placard, or similar document, which shall be displayed on
the premises during the time construction is in progress. This placard
shall show the number of the permit, the date of its issuance, and
be signed by the Floodplain Administrator.
A.
Work on the proposed construction or development shall begin within
180 days after the date of issuance of the permit, and shall be completed
within 365 days after the date of issuance of the permit, or the permit
shall expire unless a time extension is granted, in writing, by the
Floodplain Administrator. The issuance of a permit under this chapter
does not constitute zoning approval, land development approval, or
building approval. Any required zoning, land development, and building
approvals must be obtained prior to construction.
B.
The actual start of construction means either the first placement
of permanent construction of a structure on a site, such as the pouring
of slab or footings, the installation of piles, the construction of
columns, or any work beyond the stage of excavation; or the placement
of a manufactured home on a foundation. Permanent construction does
not include land preparation, such as clearing, grading, and filling;
nor does it include the installation of streets and/or walkways; nor
does it include excavation for a basement, footings, piers, or foundations
or the erection of temporary forms; nor does it include the installation
on the property of accessory buildings, such as garages or sheds not
occupied as dwelling units or not part of the main structure. For
a substantial improvement, the actual start of construction means
the first alteration of any wall, ceiling, flood, or other structural
part of a building, whether or not that alteration affects the external
dimensions of the building.
C.
Time extensions shall be granted only if a written request is submitted
by the applicant, who sets forth sufficient and reasonable cause for
the Floodplain Administrator to approve such a request and the original
permit is compliant with the ordinance and FIRM/FIS in effect at the
time the extension is granted.
A.
Notices. Whenever the Floodplain Administrator or other authorized
municipal representative determines that there are reasonable grounds
to believe that there has been a violation of any provisions of this
chapter, or of any regulations adopted pursuant thereto, the Floodplain
Administrator shall give notice of such alleged violation as hereinafter
provided. Such notice shall:
(1)
Be in writing;
(2)
Include a statement of the reasons for its issuance;
(3)
Allow a reasonable time not to exceed a period of 30 days for the
performance of any act it requires;
(4)
Be served upon the property owner or his agent as the case may require;
provided, however, that such notice or order shall be deemed to have
been properly served upon such owner or agent when a copy thereof
has been served with such notice by any other method authorized or
required by the laws of this state;
(5)
Contain an outline of remedial actions which, if taken, will effect
compliance with the provisions of this chapter.
B.
Penalties. Any person who fails to comply with any or all of the
requirements or provisions of this chapter or who fails or refuses
to comply with any notice, order, or direction of the Floodplain Administrator
or any other authorized employee of the municipality shall be guilty
of a summary offense and upon conviction shall pay a fine to Straban
Township of not less than $100 nor more than $600 plus costs of prosecution.
Each day during which any violation of this chapter shall continue
shall constitute a separate offense. In addition to the above penalties
all other actions are hereby reserved, including an action in equity
for the proper enforcement of this chapter. The imposition of a fine
or penalty for any violation of, or noncompliance with, this chapter
shall not excuse the violation or noncompliance or permit it to continue.
All such persons shall be required to correct or remedy such violations
and noncompliance within a reasonable time. Any development initiated
or any structure or building constructed, reconstructed, enlarged,
altered, or relocated, in noncompliance with this chapter may be declared
by the Board of Supervisors or the Township Code Enforcement Officer(s)
to be a public nuisance and abatable as such.
A.
Any person aggrieved by any action or decision of the Floodplain
Administrator concerning the administration of the provisions of this
chapter may appeal to the Zoning Hearing Board. Such appeal must be
filed, in writing, within 30 days after the decision, determination,
or action of the Floodplain Administrator.
B.
Upon receipt of such appeal, the Zoning Hearing Board shall consider
the appeal in accordance with the Municipalities Planning Code and
any other local ordinance.