[Ord. No. 872, 11/7/2022]
1. 
All regulated activities in the municipality shall be subject to the stormwater management requirements of this Part.
2. 
No earth disturbance activities associated with any regulated activities shall commence until approval by the municipality of a plan which demonstrates compliance with the requirements of this Part.
3. 
Stormwater management plans approved by the municipality, in accordance with § 148, shall be on site throughout the duration of the regulated activity.
4. 
The municipality may, after consultation with DEP, approve measures for meeting the state water quality requirements other than those in this Part, provided that they meet the minimum requirements of, and do not conflict with, state law including, but not limited to, the Clean Streams Law.[1]
[1]
Editor's Note: See 35 P.S. § 691.1 et seq.
5. 
For all regulated earth disturbance activities, erosion and sediment control BMPs shall be designed, implemented, operated, and maintained during the regulated earth disturbance activities (e.g., during construction) to meet the purposes and requirements of this Part and to meet all requirements under Title 25 of the Pennsylvania Code and the Clean Streams Law. Various BMPs and their design standards are listed in the Erosion and Sediment Pollution Control Program Manual (E&S Manual), No. 363-2134-008, as amended and updated.
6. 
Storm drainage systems shall be designed to preserve natural watercourses except as modified by stormwater detention facilities, recharge facilities, water quality facilities, pipe systems or open channels consistent with this Part.
7. 
Areas of existing diffused drainage discharge onto adjacent property shall be managed such that, at minimum, the peak diffused flow does not increase in the general direction of discharge, except as otherwise provided in this Part. If diffused flow is proposed to be concentrated and discharged onto adjacent property, the developer must obtain the written approval of the affected property owner(s). Areas of existing diffused drainage discharge shall be subject to any applicable release rate criteria in the general direction of existing discharge whether they are proposed to be concentrated or maintained as diffused drainage areas.
8. 
Where a site is traversed by watercourses other than those for which a 100-year floodplain is defined by the municipality, there shall be provided drainage easements conforming substantially with the line of such watercourses. The width of any easement shall be adequate to provide for unimpeded flow of storm runoff based on calculations made in conformance with § 128 for the 100-year return period runoff and to provide a freeboard allowance of 0.5 foot above the design water surface level. The terms of the easement shall prohibit excavation, the placing of fill or structures, and any alterations which may adversely affect the flow of stormwater within any portion of the easement. Also, periodic maintenance of the easement to ensure proper runoff conveyance shall be required. Watercourses for which the 100-year floodplain is formally defined are subject to the applicable municipal floodplain regulations.
9. 
Post construction BMPs shall be designed, installed, operated and maintained to meet the requirements of the Clean Streams Law and implementing regulations, including the established practices in 25 Pa. Code Chapter 102 and the specifications of this Part as to prevent accelerated erosion in watercourse channels and at all points of discharge.
10. 
Techniques described in Appendix F (Low Impact Development Practices) of this Part[2] are encouraged because they reduce the costs of complying with the requirements of this Part and the state water quality requirements.
[2]
Editor's Note: Said appendix is on file in Borough offices.
11. 
Infiltration for stormwater management is encouraged where soils and geology permit, consistent with the provisions of this Part and, where appropriate, the Recommendation Chart for Infiltration Stormwater Management BMPs in Carbonate Bedrock in Appendix D.[3]
[3]
Editor's Note: Said appendix is on file in Borough offices.
12. 
All regulated activities shall include such measures as necessary to:
A. 
Protect health, safety, and property.
B. 
Meet the water quality goals of this Part by implementing measures to:
(1) 
Minimize disturbance to floodplains, wetlands, and wooded areas.
(2) 
Maintain or extend riparian buffers.
(3) 
Avoid erosive flow conditions in natural flow pathways.
(4) 
Minimize thermal impacts to waters of this Commonwealth.
(5) 
Disconnect impervious surfaces by directing runoff to pervious areas, wherever possible.
C. 
Incorporate methods described in the Pennsylvania Stormwater Best Management Practices Manual (BMP Manual).
13. 
The design of all facilities over karst shall include an evaluation of measures to minimize adverse effects.
14. 
Infiltration BMPs should be spread out, made as shallow as practicable, and located to maximize use of natural on-site infiltration features while still meeting the other requirements of this Part.
15. 
Normally dry, open top, storage facilities should completely drain both the volume control and rate control capacities over a period of time not less than 24 and not more than 72 hours from the end of the design storm.
16. 
The design storm volumes to be used in the analysis of peak rates of discharge should be obtained from the latest version of the Precipitation-Frequency Atlas of the United States, National Oceanic and Atmospheric Administration (NOAA), National Weather Service, Hydrometeorological Design Studies Center, Silver Spring, Maryland. NOAA's Atlas 14 can be accessed at: http://hdsc.nws.noaa.gov/hdsc/pfds/.
17. 
For all regulated activities, stormwater management BMPs shall be designed, implemented, operated, and maintained to meet the purposes and requirements of this Part and to meet all requirements under Title 25 of the Pennsylvania Code, the Clean Streams Law,[4] and the Storm Water Management Act.[5]
[4]
Editor's Note: See 35 P.S. § 691.1 et seq.
[5]
Editor's Note: See 32 P.S. § 680.1 et seq.
18. 
Various BMPs and their design standards are listed in the BMP Manual.
[Ord. No. 872, 11/7/2022]
1. 
Other regulations contain independent permit requirements that apply to certain regulated and earth disturbance activities eligible for authorization by the Municipality in accordance with the permitting requirements in this Part. Permit requirements pursuant to those other regulations must be met prior to commencement, and during the conduct, of such regulated and earth disturbance activities, as applicable:
A. 
All regulated and earth disturbance activities subject to permit requirements by DEP under regulations at 25 Pa. Code Chapter 102.
B. 
Work within natural drainageways subject to permit by DEP under 25 Pa. Code Chapter 102 and Chapter 105.
C. 
Any stormwater management facility that would be located in or adjacent to surface waters, including wetlands, subject to permit by DEP under 25 Pa. Code Chapter 105.
D. 
Culverts, bridges, storm sewers or any other facilities which must pass or convey flows from the tributary area and any facility which may constitute a dam subject to permit by DEP under 25 Pa. Code Chapter 105.
E. 
Projects that involve use of PennDOT right-of-way, or that involve new discharges onto or toward PennDOT right-of-way, are subject to the requirements, including the permitting requirements, of Title 67, Chapter 441 of the Pennsylvania Code.
[Ord. No. 872, 11/7/2022]
1. 
No regulated earth disturbance activities within the municipality shall commence until approval by the municipality of an erosion and sediment control plan for construction activities. Written approval by DEP or a delegated County Conservation District shall satisfy this requirement.
2. 
A written erosion and sediment control plan is required by DEP regulations for any earth disturbance activity under Pa. Code § 102.4(b).
3. 
A DEP NPDES stormwater discharges associated with construction activities permit is required for regulated earth disturbance activities of one acre or greater under Pa. Code Chapter 92.
4. 
Evidence of any necessary permit(s) for regulated earth disturbance activities from the appropriate DEP regional office or County Conservation District must be provided to the municipality before the commencement of an earth disturbance activity.
5. 
A copy of the erosion and sediment control plan and any permit, as required by DEP regulations, shall be available at the project site at all times.
[Ord. No. 872, 11/7/2022]
1. 
The green infrastructure and low-impact development practices provided in the BMP Manual shall be utilized for all regulated activities wherever possible. Water volume controls shall be implemented using the Design Storm Method in Subsection 1A.
A. 
The Design Storm Method (CG-1 in the BMP Manual) is applicable to any size of regulated activity. This method requires detailed modeling based on site conditions.
(1) 
Do not increase the post-development total runoff volume for all storms equal to or less than the two-year, twenty-four-hour duration precipitation.
(2) 
For modeling purposes:
(a) 
Existing (predevelopment) nonforested pervious areas must be considered meadow in good condition.
(b) 
Twenty percent of existing impervious area, when present, shall be considered meadow in good condition in the model for existing conditions.
(3) 
The effect of closed depressions on the site shall be considered in this calculation.
B. 
The water volume controls shall be calculated for each post-development drainage direction on a site for sizing BMPs. Site areas having no impervious cover and no proposed disturbance during development may be excluded from the water volume controls calculations and do not require treatment.
C. 
The applicant shall document the bedrock type(s) present on the site from published sources. Any apparent boundaries between carbonate and noncarbonate bedrock shall be verified through more detailed site evaluations by a qualified geotechnical professional.
D. 
For each proposed regulated activity in the watershed where an applicant intends to use infiltration BMPs, the applicant shall conduct a preliminary site investigation, including gathering data from published sources, a field inspection of the site, a minimum of one test pit and a minimum of two percolation tests, as outlined in Appendix G.[1] This investigation will determine depth to bedrock, depth to the seasonal high water table, soil permeability and location of special geologic features, if applicable. This investigation may be done by a certified Sewage Enforcement Officer (SEO) except that the location(s) of special geologic features shall be verified by a qualified geotechnical professional.
[1]
Editor's Note: Said appendix is on file in Borough offices.
E. 
Sites where applicants intend to use infiltration BMPs must meet the following criteria:
(1) 
Depth to bedrock below the invert of the BMP greater than or equal to two feet.
(2) 
Depth to seasonal high water table below the invert of the BMP greater than or equal to two feet; except for infiltration of residential roof runoff where the seasonal high water table must be below the invert of the BMP.
(3) 
Soil permeability (as measured using the standards listed in Appendix C of the Pennsylvania Stormwater Best Practices Manual) greater than or equal to 0.1 inches/hour and less than or equal to 10 inches per hour.
(4) 
Setback distances or buffers as follows:
(a) 
One hundred feet from water supply wells, or 50 feet in residential development.
(b) 
Ten feet downgradient or 100 feet upgradient from building foundations.
(5) 
Fifty feet from septic system drainfields.
(6) 
Fifty feet from a geologic contact with carbonate bedrock unless a preliminary site investigation is done in the carbonate bedrock to show the absence of special geologic features within 50 feet of the proposed infiltration area.
F. 
In entirely carbonate areas, where the applicant intends to use infiltration BMPs, the preliminary site investigation described in Appendix G[2] shall be conducted. For infiltration areas that appear feasible based on the preliminary site investigation, the applicant shall conduct the additional site investigation and testing as outlined in Appendix G. The soil depth, percolation rate and proposed loading rate, along with the buffer from special geologic features shall be compared to the Recommendation Chart for Infiltration Stormwater Management BMPs in Carbonate Bedrock in Appendix D[3] to determine if the site is recommended for infiltration. In addition to the recommendation from Appendix D, the conditions listed in § 124, Subsection 1F are required for infiltration in carbonate areas.
[2]
Editor's Note: Said appendix is on file in Borough offices.
[3]
Editor's Note: Said appendix is on file in Borough offices.
G. 
Site areas proposed for infiltration shall be protected from disturbance and compaction except as necessary for construction of infiltration BMPs.
H. 
If infiltration of the entire water volume control is not proposed, the remainder of the water volume control shall be treated by acceptable BMPs for each discharge location. Acceptable BMPs are listed in Appendix H.[4]
[4]
Editor's Note: Said appendix is on file in Borough offices.
I. 
Stormwater runoff from hot spot land uses shall be pre-treated. Suggested methods of pre-treatment are listed in Appendix H.
J. 
The use of infiltration BMPs is prohibited on hot spot land use areas unless the applicant can demonstrate that existing and proposed site conditions, including any proposed runoff pre-treatment, create conditions suitable for runoff infiltration under this Part.
K. 
Stormwater infiltration BMPs shall not be placed in or on a special geologic feature(s). Additionally, stormwater runoff shall not be discharged into existing on-site sinkholes.
L. 
Stormwater drainage wells may only be used for runoff from roof areas.
M. 
Applicants shall request, in writing, public water suppliers to provide the Zone I wellhead protection radius, as calculated by the method outlined in the Pennsylvania Department of Environmental Protection Wellhead Protection regulations, for any public water supply well within 400 feet of the site. In addition to the setback distances specified in § 124, Subsection 1F, infiltration is prohibited in the Zone I radius as defined and substantiated by the public water supplier in writing. If the applicant does not receive a response from the public water supplier, the Zone I radius is assumed to be 100 feet.
N. 
The municipality may, after consultation with DEP, approve alternative methods for meeting the state water volume control requirements other than those in this Part, provided that they meet the minimum requirements of, and do not conflict with, state law, including but not limited to the Clean Streams Law.[5]
[5]
Editor's Note: See 35 P.S. § 691.1 et seq.
[Ord. No. 872, 11/7/2022]
1. 
The entire water volume control as calculated in § 124, Subsection 1A of this Part shall be captured and treated by either direct recharge/subsurface and/or vegetated/surface BMPs.
2. 
As much proposed impervious area as practical shall be directed to water volume control BMPs.
3. 
Existing impervious area that is not proposed to be treated by direct recharge/subsurface BMPs should be excluded from all water balance calculations.
4. 
Vegetated/surface BMPs shall be employed "first" for the site to capture the equivalent of a minimum of 0.38 inches of runoff for each square foot of impervious area, unless proven not feasible by the applicant. For proposed impervious cover directed to multiple BMPs, the vegetated/surface BMP capture volume chart in Appendix C[1] shall be used to determine overall site compliance. Direct recharge/subsurface BMPs may be used "first" for portions of the impervious cover provided the overall vegetated/surface BMP "first" standard is met.
[1]
Editor's Note: Said appendix is on file in Borough offices.
5. 
A maximum of 30% of the total annual rainfall for a site may be directly recharged to groundwater using direct recharge/subsurface BMPs, for runoff from impervious areas.
A. 
For development sites with greater than 33% proposed impervious cover:
(1) 
If all impervious cover is directed to vegetated/surface BMPs to capture the entire two-year, twenty-four-hour event, the direct recharge standard is met.
(2) 
Up to 33% of the site as impervious cover may be directed to direct recharge/subsurface BMPs designed to capture the entire two-year, twenty-four-hour event, provided the overall vegetated/surface BMP "first" standard is met. All remaining impervious cover shall be directed to vegetated/surface BMPs designed to capture the remainder of the water volume control.
(3) 
For vegetated/surface and/or direct recharge/subsurface BMPs designed for runoff from impervious areas designed to capture less than the entire two-year, twenty-four-hour event, Appendix C shall be used to assure that the maximum direct recharge standard is met.
B. 
The maximum 30% direct recharge standard applies on an overall site basis, rather than in each drainage direction.
[Ord. No. 872, 11/7/2022]
1. 
Mapping of Stormwater Management Districts. To implement the provisions of the Catasauqua Creek Watershed and Lehigh River Subbasin 4 Stormwater Management Plan, the Borough is hereby divided into stormwater management districts consistent with the Catasauqua Creek Release Rate Map presented in this Part. The boundaries of the Stormwater Management Districts are shown on an official map which is available for inspection at the Borough office. A copy of the official map at a reduced scale is included in Appendix A for general reference.[1]
[1]
Editor's Note: Said appendix is on file in Borough offices.
2. 
Description of Stormwater Management Districts. Three types of stormwater management districts may be applicable to the Borough, namely Conditional No Detention I Districts, Conditional No Detention II Districts and Dual Release Rate Districts, as described below:
A. 
Conditional No Detention I Districts. Within these districts, the capacity of the "local seven" runoff conveyance facilities (as defined in Subpart 1A must be calculated to determine if adequate capacity exists. For this determination, the developer must calculate peak flows assuming that the site is developed as proposed and that the remainder of the local watershed is in the existing condition. The developer must also calculate peak flows assuming that the entire local watershed is developed per current zoning and that all new development would use the runoff controls specified by this Part. The larger of the two peak flows calculated will be used in determining if adequate capacity exists. If adequate capacity exists to safely transport runoff from the site to the main channel (as defined in Subpart 1A), these watershed areas may discharge post-development peak runoff without detention facilities. If the capacity calculations show that the local runoff conveyance facilities lack adequate capacity, the developer shall either use a 100% release rate control or provide increased capacity of downstream elements to convey increased peak flows consistent with § 127, Subsection 15. Any capacity improvements must be designed to convey runoff from development of all areas tributary to the improvement consistent with the capacity criteria specified in § 127, Subsection 4 By definition, a storm drainage problem area associated with the local runoff conveyance facilities indicates that adequate capacity does not exist. Sites in these districts are still required to meet all of the water volume requirements § 124.
B. 
Conditional No Detention II Districts. Within these districts, the capacity of the local runoff conveyance facilities must be calculated in the same manner as the Conditional No Detention I Districts. In this case, however, adequate capacity must be demonstrated from the site to the Lehigh River. After determining if adequate capacity exists, the developer shall use either no detention, 100% release rate or provide capacity improvements as detailed in Subsection 2A, Conditional No Detention I Districts.
C. 
Dual Release Rate Districts. Within this district, the two-year post-development runoff must be controlled to 30% of the redevelopment two-year runoff peak. Further, the ten-year, twenty-five year, and 100-year post-development runoff must be controlled to 100% of the predevelopment peak.
[Ord. No. 872, 11/7/2022]
1. 
Applicants shall provide a comparative pre- and post-construction stormwater management hydrograph analysis for each direction of discharge and for the site overall to demonstrate compliance with the provisions of this Part.
2. 
Any stormwater management controls required by this Part and subject to a dual release rate criteria shall meet the applicable release rate criteria for each of the two-, ten-, twenty-five- and 100-year return period runoff events consistent with the calculation methodology specified in § 128.
3. 
The exact location of the Stormwater Management District boundaries as they apply to a given development site shall be determined by mapping the boundaries using the two-foot topographic contours provided as part of the drainage plan. The District boundaries as originally drawn coincide with topographic divides or, in certain instances, are drawn from the intersection of the watercourse and a physical feature, such as the confluence with another watercourse or a potential flow obstruction (e.g., road, culvert, bridge, etc.). The physical feature is the downstream limit of the subarea, and the subarea boundary is drawn from that point upslope to each topographic divide along the path perpendicular to the contour lines.
4. 
Any downstream capacity analysis conducted in accordance with this Part shall use the following criteria for determining adequacy for accepting increased peak flow rates:
A. 
Natural or man-made channels or swales must be able to convey the increased runoff associated with a two-year return period event within their banks at velocities consistent with protection of the channels from erosion. Acceptable velocities shall be based upon criteria included in the DEP Erosion and Sediment Pollution Control Program Manual (April 1990). Permissible velocities from the DEP Manual for selected channels are presented in Appendix C.[1]
[1]
Editor's Note: Said appendix is on file in Borough offices.
B. 
Natural or man-made channels or swales must be able to convey the increased twenty-five-year return period runoff without creating any hazard to persons or property.
C. 
Culverts, bridges, storm sewers or any other facilities which must pass or convey flows from the tributary area must be designed in accordance with DEP Chapter 105 regulations (if applicable) and, at minimum, pass the increased twenty-five-year return period runoff.
5. 
For a proposed development site located within one release rate category subarea, the total runoff from the site shall meet the applicable release rate criteria for development sites with multiple directions of runoff discharge; individual drainage directions may be designed for up to a 100% release rate so long as the total runoff from the site is controlled to the applicable release rate.
6. 
For a proposed development site located within two or more release category subareas, the peak discharge rate from any subarea shall be the predevelopment peak discharge for that subarea multiplied by the applicable release rate. The calculated peak discharges shall apply regardless of whether the grading plan changes the drainage area by subarea. An exception to the above may be granted if discharges from multiple subareas recombine in proximity to the site. In this case, peak discharge in any direction may be a 100% release rate, provided that the overall site discharge meets the weighted average release rate.
7. 
For a proposed development site located partially within a release rate category subarea and partially within a conditional/provisional no detention subarea, the size of the predevelopment drainage area on a site may not be changed post-development to create potentially adverse conditions on downstream properties except as part of a no-harm or hardship waiver procedure. No portion of a site may be re-graded between areas within the Catasauqua Creek Watershed Study Area and any adjacent watershed except as part of a no-harm or hardship waiver procedure.
8. 
Within a release rate category area for a proposed development site which has areas which drain to a closed depression(s), the design release from the site will be the lesser of a) the applicable release rate flow assuming no closed depression(s), or b) the existing peak flow actually leaving the site. In cases where b) would result in an unreasonably small design release, the design discharge of less than or equal to the release rate will be determined by the available downstream conveyance capacity to the main channel calculated using § 127, Subsection 4 and the minimum orifice criteria.
9. 
Off-site areas which drain through a proposed development site are not subject to release rate criteria when determining allowable peak runoff rates. However, on-site drainage facilities shall be designed to safely convey off-site flows through the development site using the capacity criteria in § 127, Subsection 4 and the detention criteria in § 128. In addition to the criteria in § 127, Subsection 4 on-site conveyance systems designed to carry runoff to a detention basin must be able to transport the basin's 100-year tributary flow either in-system, in-gutter or overland.
10. 
For development sites proposed to take place in phases, all detention ponds shall be designed to meet the applicable release rate(s) applied to all site areas tributary to the proposed pond discharge direction. All site tributary areas will be assumed as developed, regardless of whether all site tributary areas are proposed for development at that time. An exception shall be sites with multiple detention ponds in series where only the downstream pond must be designed to the stated release rate.
11. 
Where the site area to be impacted by a proposed development activity differs significantly from the total site area, only the proposed impact area shall be subject to the release rate criteria. The impact area includes any proposed cover or grading changes.
12. 
Development proposals which, through groundwater recharge or other means, do not increase the rate or volume of runoff discharged from the site are not subject to the release rate provisions of this Part.
13. 
No-Harm Water Quantity Option. For any proposed development site not located in a conditional/provisional no detention district, the developer has the option of using a less restrictive runoff control (including no detention) if the developer can prove that special circumstances exist for the proposed development site and that no harm would be caused by discharging at a higher runoff rate than that specified by this Part. Special circumstances are defined as any hydrologic or hydraulic aspects of the development itself not specifically considered in the development of the plan runoff control strategy. Proof of "no harm" would have to be shown from the development site through the remainder of the downstream drainage network to the confluence of the creek with the Lehigh River. Proof of no harm must be shown using the capacity criteria specified in § 127, Subsection 4 if downstream capacity analysis is a part of the "no-harm" justification. Attempts to prove "no harm" based upon downstream peak flow versus capacity analysis shall be governed by the following provisions:
A. 
The peak flow values to be used for downstream areas for the design return period storms two-, ten-, twenty-five- and 100-year) shall be the values from the calibrated PSRM Model for the Catasauqua Creek Watershed or as calculated by an applicant using an alternate method acceptable to the Borough. The flow values from the PSRM Model would be supplied to the developer by the Borough upon request.
B. 
Any available capacity in the downstream conveyance system as documented by a developer may be used by the developer only in proportion to his development site acreage relative to the total upstream undeveloped acreage from the identified capacity (i.e., if his site is 10% of the upstream undeveloped acreage, he may use up to 10% of the documented downstream available capacity).
C. 
Developer-proposed runoff controls which would generate increased peak flow rates at storm drainage problem areas would, by definition, be precluded from successful attempts to prove no harm.
D. 
Any downstream capacity improvements proposed by the developer as part of a "no harm" justification would be designed using the capacity criteria specified in § 127, Subsection 4 Peak flow contributions to the proposed improvements shall be calculated as the larger of: (1) assuming the local watershed is in the existing condition, or 2) assuming that the local watershed is developed per current zoning and using the specified runoff controls.
14. 
Regional Detention Alternatives. For certain areas within the study area, it may be more cost effective to provide one control facility for more than one development site than to provide an individual control facility for each development site. The initiative and funding for any regional runoff control alternatives are the responsibility of prospective developers. The design of any regional control basins must incorporate reasonable development of the entire upstream watershed. The peak outflow of a regional basin would be determined on a case-by case-basis using the hydrologic model of the watershed consistent with protection of the down- stream watershed areas. "Hydrologic model" refers to the calibrated version of the Penn State Runoff Model as developed for the stormwater management plan.
15. 
Capacity Improvements. In certain instances, primarily within the conditional no detention areas, local drainage conditions may dictate more stringent levels of runoff control than those based upon protection of the entire watershed. In these instances, if the developer could prove that it would be feasible to provide capacity improvements to relieve the capacity deficiency in the local drainage network, then the capacity improvements could be provided by the developer in lieu of runoff controls on the development site. Peak flow calculations are to be done assuming that the local watershed is in the existing condition and then assuming that the local watershed is developed per current zoning and using the specified runoff controls. Any capacity improvements would be designed using the larger of the peak flows and the capacity criteria specified in § 127, Subsection 4. All new development in the entire subarea(s) within which the proposed development site is located shall be assumed to implement the developer's proposed discharge control, if any. Capacity improvements may also be provided as necessary to implement any regional detention alternatives or to implement a modified no harm option which proposes specific capacity improvements to provide that a less stringent discharge control would not create any harm downstream.
16. 
Release rates need to be met year round. Designs involving BMPs that function differently in winter versus non-winter conditions (e.g., capture/reuse with spray irrigation shut off for the winter) must still meet release rates during the winter.
[Ord. No. 872, 11/7/2022]
1. 
Stormwater runoff from all development sites shall be calculated using either the Rational Method or the Soil-Cover-Complex methodology.
2. 
Infiltration BMP loading rate percentages in the Recommendation Chart for Infiltration Stormwater Management BMPs in Carbonate Bedrock in Appendix D[1] shall be calculated as follows:
Area Tributary to infiltration BMP
*100%
Base Area of infiltration BMP
The area tributary to the infiltration BMP shall be weighted as follows:
A. 
All disturbed areas to be made impervious: weight at 100%.
B. 
All disturbed areas to be made pervious: weight at 50%.
C. 
All undisturbed pervious areas: weight at 0%.
D. 
All existing impervious areas: weight at 100%.
[1]
Editor's Note: Said appendix is on file in Borough offices.
3. 
The design of any detention basin intended to meet the requirements of this Part shall be verified by routing the design storm hydrograph through the proposed basin using the storage indication method or other methodology demonstrated to be more appropriate. For basins designed using the Rational Method technique, the design hydrograph for routing shall be either the Universal Rational Hydrograph or another Rational hydrograph that closely approximates the volume of the Universal Rational Hydrograph.
4. 
BMPs designed to store or infiltrate runoff and discharge to surface runoff or pipe flow shall be routed using the storage indication method.
5. 
BMPs designed to store or infiltrate runoff and discharge to surface runoff or pipe flow shall provide storage volume for the full water volume control below the lowest outlet invert.
6. 
Wet detention ponds designed to have a permanent pool for the water volume control shall assume that the permanent pool volume below the primary outlet is full at the beginning of design event routing for the purposes of evaluating peak outflows.
7. 
All aboveground stormwater detention facilities shall provide a minimum 0.5 feet of freeboard above the maximum pool elevation associated with the two- through 100-year runoff events, or an additional 10% of the 100-year storage volume as freeboard volume, whichever is greater. All below-ground stormwater detention and infiltration facilities shall have an additional 10% of the 100-year storage volume available within the storage medium, as well as a minimum of 0.5 feet of freeboard. The freeboard shall be measured from the maximum pool elevation to the invert of the emergency spillway for aboveground facilities, and from the maximum pool elevation to the lowest overflow elevation for below-ground facilities. The two- through 100-year storm events shall be controlled by the primary outlet structure. An emergency spillway for each aboveground basin shall be designed to pass the 100-year return frequency storm peak basin inflow rate with a minimum 0.5 foot freeboard measured to the top of basin. The freeboard criteria shall be met considering any off-site areas tributary to the basin as developed, as applicable. Exceptions to the freeboard requirements are as follows:
A. 
Bioretention BMPs with a ponded depth less than or equal to 0.5 feet are exempt from the freeboard requirements.
B. 
Small detention basins, with a ponded depth less than or equal to 1.5 feet or having a depth to the top of the berm less than or equal to 2.5 feet, may provide 20% additional storage volume measured from the maximum ponded depth to the invert of the emergency spillway in lieu of the above requirements. The depth of the emergency spillway must be sufficient to pass either two times the 100-year peak or the 100-year peak with 0.2 feet of freeboard to the top of berm, whichever is greater.
C. 
Small infiltration basins, with a ponded depth less than or equal to 1.5 feet or having a depth to the top of the berm less than or equal to 2.5 feet, may provide 20% additional storage volume measured from the maximum ponded depth to the top of the berm in lieu of the above requirements. In this case, an emergency spillway is only necessary if runoff in excess of the basin volume would cause harm to downstream owners. If a spillway is necessary, it must be sufficiently sized to pass the 100-year peak inflow.
If this detention facility is considered to be a dam, as per DEP Chapter 105, the design of the facility must be consistent with the Chapter 105 regulations and may be required to pass a storm greater than the 100-year event.
8. 
The minimum circular orifice diameter for controlling discharge rates from detention facilities shall be three inches. Designs where a lesser size orifice would be required to fully meet release rates shall be acceptable with a three-inch orifice, provided that as much of the site runoff as practical is directed to the detention facilities. The minimum three-inch diameter does not apply to the control of the water volume control.
9. 
Runoff calculations using the Soil-Cover-Complex method shall use the Natural Resources Conservation Service Type II twenty-four-hour rainfall distribution. The twenty-four-hour rainfall depths for the various return periods to be used consistent with this Part may be taken from NOAA Atlas 14, Precipitation Frequency Atlas of the United States, current volume, or the Pennsylvania Department of Transportation Drainage Manual, 2015 Edition for Region 4. The following values are taken from the Drainage Manual:
Return Period
24-Hour Rainfall Depth
1-year
2.64 inches
2-year
3.16 inches
5-year
3.91 inches
10-year
4.57 inches
25-year
5.60 inches
50-year
6.53 inches
100-year
7.63 inches
A graphical and tabular presentation of the Type II twenty-four-hour distribution is included in Appendix C.[2]
[2]
Editor's Note: Said appendix is on file in Borough offices.
10. 
Runoff calculations using the Rational Method shall use rainfall intensities consistent with appropriate times of concentration and return periods and NOAA Atlas 14, Precipitation Frequency Atlas of the United States Precipitation and Intensity Charts, current volume, as presented in Appendix C.
11. 
Runoff curve numbers (CN's) to be used in the Soil-Cover-Complex method shall be based upon the table presented in Appendix C.
12. 
Runoff coefficients for use in the Rational Method shall be based upon the table presented in Appendix C.
13. 
All time of concentration calculations shall use a segmental approach which may include one or all of the flow types below:
A. 
Sheet flow (overland flow) calculations shall use either the NRCS average velocity chart (Figure 3-1, Technical Release-55, 1975) or the modified kinematic wave travel time equation (equation 3-3, NRCS TR-55, June 1986). If using the modified kinematic wave travel time equation, the sheet flow length shall be limited to 50 feet for designs using the Rational Method and limited to 150 feet for designs using the Soil-Cover-Complex method.
B. 
Shallow concentrated flow travel times shall be determined from the watercourse slope, type of surface and the velocity from Figure 3-1 of TR-55, June 1986.
C. 
Open channel flow travel times shall be determined from velocities calculated by the Manning Equation. Bankfull flows shall be used for determining velocities. Manning 'n' values shall be based on the table presented in Appendix C.
D. 
Pipe flow travel times shall be determined from velocities calculated using the Manning Equation assuming full flow and the Manning 'n' values from Appendix C.
14. 
If using the Rational Method, all pre-development calculations for a given discharge direction shall be based on a common time of concentration considering both on-site and any off-site drainage areas. If using the Rational Method, all post-development calculations for a given discharge direction shall be based on a common time of concentration considering both on-site and any off-site drainage areas.
15. 
When conditions exist such that a proposed detention facility may experience a tailwater effect, the basin shall be analyzed without any tailwater effect for all storm events for comparison against the required release rates. An additional routing of the 100-year storm with the full tailwater effect shall be performed to check that the basin has sufficient storage to contain the 100-year tributary flow and meet freeboard requirements.
16. 
The Manning Equation shall be used to calculate the capacity of watercourses. Manning 'n' values used in the calculations shall be consistent with the table presented in Appendix C[3] or other appropriate standard engineering 'n' value resources. Pipe capacities shall be determined by methods acceptable to the municipality.
[3]
Editor's Note: Said appendix is on file in Borough offices.
17. 
The Pennsylvania DEP, Chapter 105, Rules and Regulations, apply to the construction, modification, operation or maintenance of both existing and proposed dams, water obstructions and encroachments throughout the watershed. Criteria for design and construction of stormwater management facilities according to this Part may differ from the criteria that are used in the permitting of dams under the Dam Safety Program.
[Ord. No. 872, 11/7/2022]
1. 
In order to protect and improve water quality, a riparian buffer easement shall be created and recorded as part of any subdivision or land development that encompasses a riparian buffer.
2. 
Except as required by Chapter 102, the riparian buffer easement shall be measured to be the greater of the limit of the 100-year floodplain or a minimum of 35 feet from the top of the streambank (on each side).
3. 
Minimum Management Requirements for riparian buffers.
A. 
Existing native vegetation shall be protected and maintained within the riparian buffer easement
B. 
Whenever practicable invasive vegetation shall be actively removed and the riparian buffer easement shall be planted with native trees, shrubs and other vegetation to create a diverse native plant community appropriate to the intended ecological context of the site.
4. 
The riparian buffer easement shall be enforceable by the municipality and shall be recorded in the Northampton County Recorder of Deeds Office, so that it shall run with the land and shall limit the use of the property located therein. The easement shall allow for the continued private ownership and shall count toward the minimum lot area as required by Zoning, unless otherwise specified in the Borough Zoning Ordinance.
5. 
Any permitted use within the riparian buffer easement shall be conducted in a manner that will maintain the extent of the existing 100-year floodplain, improve or maintain the stream stability, and preserve and protect the ecological function of the floodplain.
6. 
The following conditions shall apply when public and/or private recreation trails are permitted within riparian buffers:
A. 
Trails shall be for non-motorized use only.
B. 
Trails shall be designed to have the least impact on native plant species and other sensitive environmental features.
7. 
Septic drainfields and sewage disposal systems shall not be permitted within the riparian buffer easement and shall comply with setback requirements established under 25 Pa. Code Chapter 73.