This ordinance shall be known and may be cited as the "Palmer Township Stormwater Management Ordinance."
The governing body of the municipality finds that:
A. 
Inadequate management of accelerated runoff of stormwater resulting from development throughout a watershed increases runoff volumes, flows, and velocities; contributes to erosion and sedimentation; overtaxes the carrying capacity of streams and storm sewers; greatly increases the cost of public facilities to carry and control stormwater; undermines floodplain management and flood control efforts in this and downstream communities; reduces groundwater recharge; threatens public health and safety; and increases nonpoint source pollution of water resources.
B. 
A comprehensive program of stormwater management (SWM), including reasonable regulation of development and activities causing accelerated runoff, is fundamental to the public health, safety, and welfare, and the protection of people of the commonwealth, their resources, and the environment.
C. 
Existing improvements that lack compliant stormwater controls and are proposed for redevelopment disproportionately increase the cost of comprehensive stormwater management for the municipality.
D. 
Stormwater is an important water resource that provides groundwater recharge for water supplies and supports the base flow of streams.
E. 
The use of green infrastructure and low-impact development (LID) are intended to address the root cause of water quality impairment by using systems and practices which use or mimic natural processes, unless otherwise required, to 1) infiltrate and recharge, 2) evapotranspire, and/or 3) harvest and use precipitation near where it falls to earth. Green infrastructure practices and LID contribute to the restoration or maintenance of predevelopment hydrology.
F. 
Federal and state regulations require certain municipalities to implement a program of stormwater controls. These municipalities are required to obtain a permit for stormwater discharges from their separate storm sewer systems under the National Pollutant Discharge Elimination System (NPDES) program.
G. 
Public education on the control of pollution from stormwater is an essential component in successfully addressing stormwater.
H. 
Nonstormwater discharges to municipal separate storm sewer systems can contribute to pollution of waters of the commonwealth by the municipality.
The purpose of this ordinance is to promote health, safety, and welfare within the municipality and its watersheds by minimizing the harms and maximizing the benefits described in § 158-102 of this ordinance, through provisions designed to:
A. 
Meet legal water quality requirements under state law, including regulations in 25 Pa. Code Chapter 93, to protect, maintain, reclaim, and restore the existing and designated uses of the waters of this commonwealth.
B. 
Preserve natural drainage systems.
C. 
Manage stormwater runoff close to the source, reduce runoff volumes, and mimic predevelopment hydrology.
D. 
Provide procedures and performance standards for stormwater planning and management.
E. 
Maintain groundwater recharge to prevent degradation of surface water and groundwater quality and to otherwise protect water resources.
F. 
Prevent scour and erosion of stream banks and streambeds.
G. 
Provide proper operation and maintenance (O&M) of all stormwater best management practices (BMPs) that are implemented within the municipality.
H. 
Provide standards to meet NPDES permit requirements.
I. 
Provide standards to meet the stormwater management plans for the Bushkill Creek and Fry's Run watersheds as prepared by the Lehigh Valley Planning Commission of Lehigh and Northampton Counties as adopted by the County of Northampton.
J. 
Preserve and restore the flood-carrying capacity of streams.
K. 
Maintain the existing flows and quality of streams and watercourses in the municipality.
L. 
Encourage infiltration of stormwater, where appropriate, to maintain groundwater recharge, to prevent degradation of surface water and groundwater quality and to otherwise protect water resources.
The municipality is empowered to regulate land use activities that affect runoff by the authority of the Act of July 31, 1968, P.L. 805, No. 247, the Pennsylvania Municipalities Planning Code,[1] as amended, the Act of October 4, 1978, P.L. 864 (Act 167), 32 P.S. § 680.1 et seq., as amended, the Storm Water Management Act, and/or the Act of June 24, 1931, P.L. 1206, as amended, the Second Class Township Code.[2]
[1]
Editor's Note: See 53 P.S. § 10101 et seq.
[2]
Editor's Note: See 53 P.S. § 65101 et seq.
All regulated activities and all activities that may affect stormwater runoff, including land development and earth disturbance activity, are subject to regulation by this ordinance.
Any other ordinance provision(s) or regulation of the municipality inconsistent with any of the provisions of this ordinance is hereby repealed to the extent of the inconsistency only.
In the event that a court of competent jurisdiction declares any section or provision of this ordinance invalid, such decision shall not affect the validity of any of the remaining provisions of this ordinance.
Approvals issued and actions taken under this ordinance do not relieve the applicant of the responsibility to comply with or to secure required permits or approvals for activities regulated by any other applicable code, laws, rules, statutes, or ordinance. To the extent that this chapter imposes more rigorous or stringent requirements for stormwater management, the specific requirements contained in this chapter shall be followed.
Any permit or authorization issued or approved based on false, misleading, or erroneous information provided by an applicant is void without the necessity of any proceedings for revocation. Any work undertaken or use established pursuant to such permit or other authorization is unlawful. No action may be taken by a board, agency or employee of the municipality purporting to validate such a violation.
A. 
If the municipality determines that any requirement under this ordinance cannot be achieved for a particular regulated activity, the municipality may, after an evaluation of alternatives, approve measures other than those in this ordinance, subject to § 158-110B and C.
B. 
Waivers or modifications of the requirements of this ordinance may be approved by the municipality if enforcement will exact undue hardship because of peculiar conditions pertaining to the land in question, provided that the modifications will not be contrary to the public interest and that the purpose of the ordinance is preserved. Cost or financial burden shall not be considered a hardship. Modification may be considered if an alternative standard or approach will provide equal or better achievement of the purpose of the ordinance. A request for modifications shall be in writing. The written request shall provide the facts on which the request is based, the provision(s) of the ordinance involved, and the proposed modification. Any SWM site plan, report, or other related changes not matching the written request are considered void.
C. 
No waiver or modification of any regulated stormwater activity involving earth disturbance greater than or equal to one acre may be granted by the municipality unless that action is approved in advance by the Department of Environmental Protection (DEP) or the delegated county conservation district.