[HISTORY: Adopted by the Town Board of the Town of Marbletown 1-15-2008 by L.L. No. 1-2008.[1] Amendments noted where applicable.]
GENERAL REFERENCES
Flood damage prevention — See Ch. 115.
Subdivision of land — See Ch. 169.
Zoning — See Ch. 200.
[1]
Editor's Note: This chapter was originally designated to be added as Chapter 116, but was renumbered to maintain the organization of the Code. The Town Board authorized this renumbering 4-1-2008 by Res. No. 35-2008.
It is hereby determined that:
A. 
Land development activities and associated increases in site impervious cover often alter the hydrologic response of local watersheds and increase stormwater runoff rates and volumes, flooding, stream channel erosion, or sediment transport and deposition.
B. 
This stormwater runoff contributes to increased quantities of waterborne pollutants, including siltation of aquatic habitat for fish and other desirable species.
C. 
Clearing and grading during construction tends to increase soil erosion and add to the loss of native vegetation necessary for terrestrial and aquatic habitat.
D. 
Improper design and construction of stormwater management practices can increase the velocity of stormwater runoff, thereby increasing streambank erosion and sedimentation.
E. 
Impervious surfaces allow less water to percolate into the soil, thereby decreasing groundwater recharge and stream baseflow.
F. 
Substantial economic losses can result from these adverse impacts on the waters of the municipality.
G. 
Stormwater runoff, soil erosion and nonpoint source pollution can be controlled and minimized through the regulation of stormwater runoff from land development activities.
H. 
The regulation of stormwater runoff discharges from land development activities in order to control and minimize increases in stormwater runoff rates and volumes, soil erosion, stream channel erosion, and nonpoint source pollution associated with stormwater runoff is in the public interest and will minimize threats to public health and safety.
I. 
Regulation of land development activities by means of performance standards governing stormwater management and site design will produce development compatible with the natural functions of a particular site or an entire watershed and thereby mitigate the adverse effects of erosion and sedimentation from development.
The purpose of this chapter[1] is to establish minimum stormwater management requirements and controls to protect and safeguard the general health, safety, and welfare of the public residing within this jurisdiction and to address the findings of fact in § 167-1 hereof. This chapter[2] seeks to meet those purposes by achieving the following objectives:
A. 
Meet the requirements of minimum measures 4 and 5 of the State Pollutant Discharge Elimination System (SPDES) General Permit for Stormwater Discharges from Municipal Separate Stormwater Sewer Systems (MS4s), Permit No. GP-02-02, or as amended or revised;
B. 
Require land development activities to conform to the substantive requirements of the New York State Department of Environmental Conservation SPDES General Permit for Construction Activities, or as amended or revised;
C. 
Minimize increases in stormwater runoff from land development activities in order to reduce flooding, siltation, increases in stream temperature, and streambank erosion and maintain the integrity of stream channels;
D. 
Minimize increases in pollution caused by stormwater runoff from land development activities which would otherwise degrade local water quality;
E. 
Minimize the total annual volume of stormwater runoff which flows from any specific site during and following development to the maximum extent practicable; and
F. 
Reduce stormwater runoff rates and volumes, soil erosion and nonpoint source pollution, wherever possible, through stormwater management practices and to ensure that these management practices are properly maintained and eliminate threats to public safety.
[1]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
[2]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
A. 
This chapter[1] shall be applicable to all land development activities as defined in Chapter 200, Article XI of the Marbletown Code.
[1]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
B. 
The Town of Marbletown shall accept and review all stormwater pollution prevention plans. The applicable Board may engage the services of a registered professional engineer to review the plans, specifications and related documents or accept the certification of a licensed professional that the plans conform to the requirements of this chapter.[2]
[2]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
C. 
All land development activities subject to review and approval by the applicable Board of the Town of Marbletown under (subdivision, site plan, and/or special permit) regulations shall be reviewed subject to the standards contained in this chapter[3] and in the Town of Marbletown Zoning and Subdivision Laws.
[3]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
D. 
All land development activities not subject to review as stated in § 167-3C shall be required to submit a SWPPP to the Town Engineer and Building Inspector, who shall approve the SWPPP if it complies with the requirements of this chapter.[4]
[4]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
The following activities may be exempt from review under this chapter:[1]
A. 
Agricultural activity as defined in Article XI of Chapter 200.
B. 
Silvicultural activity, except that landing areas and log haul roads are subject to review under this chapter.
C. 
Routine maintenance activities that disturb less than five acres and are performed to maintain the original line and grade, hydraulic capacity or original purpose of a facility.
D. 
Repairs to any stormwater management practice or facility deemed necessary by the Town Engineer and Building Inspector.
E. 
Any part of a subdivision if a plat for the subdivision has been approved by the Town of Marbletown on or before the effective date of this chapter.
F. 
Land development activities for which a building permit has been approved on or before the effective date of this chapter.
G. 
Cemetery graves.
H. 
Installation of fence, sign, telephone, and electric poles and other kinds of posts or poles.
I. 
Emergency activity immediately necessary to protect life, property or natural resources.
J. 
Activities of an individual engaging in home gardening by growing flowers, vegetable and other plants primarily for use by that person and his or her family.
K. 
Landscaping and horticultural activities in connection with an existing structure.
[1]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
A. 
Erosion and sediment control inspection.
(1) 
The applicable reviewing Board of the Town of Marbletown may require such inspections as necessary to determine compliance with this chapter[1] and may either approve that portion of the work completed or notify the applicant wherein the work fails to comply with the requirements of this chapter and the stormwater pollution prevention plan (SWPPP) as approved. To obtain inspections, the applicant shall notify the Town Code Enforcement Officer at least 48 hours before any of the following as required by the applicable board:
(a) 
Start of construction.
(b) 
Installation of sediment and erosion control measures.
(c) 
Completion of site clearing.
(d) 
Completion of rough grading.
(e) 
Completion of final grading.
(f) 
Close of the construction season.
(g) 
Completion of final landscaping.
(h) 
Successful establishment of landscaping in public areas.
[1]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
(2) 
If any violations are found, the applicant and developer shall be notified in writing of the nature of the violation and the required corrective actions. No further work shall be conducted except for site stabilization until any violations are corrected and all work previously completed has received approval by the applicable Board and the Code Enforcement Officer.
B. 
Stormwater management practice inspections. The Town of Marbletown Code Enforcement Officer is responsible for conducting inspections of stormwater management practices (SMPs). All applicants are required to submit as built plans for any stormwater management practices located on site after final construction is completed. The plan must show the final design specifications for all stormwater management facilities and must be certified by a professional engineer.
C. 
Inspection of stormwater facilities after project completion. Inspection programs shall be established on any reasonable basis, including but not limited to: routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; inspection of drainage basins or areas identified as higher-than-typical sources of sediment or other contaminants or pollutants; inspections of businesses or industries of a type associated with higher-than-usual discharges of contaminants or pollutants or with discharges of a type which are more likely than the typical discharge to cause violations of state or federal water or sediment quality standards or the SPDES stormwater permit; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to: reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in drainage control facilities; and evaluating the condition of drainage control facilities and other stormwater management practices.
D. 
Submission of reports. The applicable reviewing Board of the Town of Marbletown may require monitoring and reporting from entities subject to this chapter[2] as are necessary to determine compliance with this chapter.
[2]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
E. 
Right-of-entry for Inspection. When any new stormwater management facility is installed on private property or when any new connection is made between private property and the public stormwater system, the landowner shall grant to the Town of Marbletown the right to enter the property at reasonable times and in a reasonable manner for the purpose of inspection as specified in § 167-5C.
A. 
Construction completion guarantee. In order to ensure the full and faithful completion of all land development activities related to compliance with all conditions set forth by the Town of Marbletown in its approval of the stormwater pollution prevention plan, the Town of Marbletown may require the applicant or developer to provide, prior to construction, a performance bond, cash escrow, or irrevocable letter of credit from an appropriate financial or surety institution which guarantees satisfactory completion of the project and names the Town of Marbletown as the beneficiary. The security shall be in an amount to be determined by the Town of Marbletown based on submission of final design plans, with reference to actual construction and landscaping costs. The performance guarantee shall remain in force until the surety is released from liability by the Town of Marbletown, provided that such period shall not be less than one year from the date of final acceptance or such other certification that the facility(ies) have been constructed in accordance with the approved plans and specifications and that a one-year inspection has been conducted and the facility(ies) have been found to be acceptable to the Town of Marbletown. Per annum interest on cash escrow deposits shall be reinvested in the account until the surety is released from liability.
B. 
Maintenance guarantee. Where stormwater management and erosion and sediment control facilities are to be operated and maintained by the developer or by a corporation that owns or manages a commercial or industrial facility, the developer, prior to construction, may be required to provide the Town of Marbletown with an irrevocable letter of credit from an approved financial institution or surety to ensure proper operation and maintenance of all stormwater management and erosion control facilities both during and after construction, and until the facilities are removed from operation. If the developer or landowner fails to properly operate and maintain stormwater management and erosion and sediment control facilities, the Town of Marbletown may draw upon the account to cover the costs of proper operation and maintenance, including engineering and inspection costs.
C. 
Recordkeeping. The Town of Marbletown may require entities subject to this chapter to maintain records demonstrating compliance with this chapter.[1]
[1]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
A. 
Notice of violation. When the Town of Marbletown determines that a land development activity is not being carried out in accordance with the requirements of this chapter,[1] it may issue a written notice of violation to the landowner in accordance with Chapter 99 of the Marbletown Code.
[1]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
B. 
Stop-work orders. The Town of Marbletown may issue a stop-work order for violations of this chapter.[2] Persons receiving a stop-work order shall be required to halt all land development activities, except those activities that address the violations leading to the stop-work order. The stop-work order shall be in effect until the Town of Marbletown confirms that the land development activity is in compliance and the violation has been satisfactorily addressed. Failure to address a stop-work order in a timely manner may result in civil, criminal, or monetary penalties in accordance with the enforcement measures authorized in Chapters 99 and 167 of the Marbletown Code.
[2]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
C. 
Violations. Any land development activity that is commenced or is conducted contrary to this chapter may be restrained by injunction or otherwise abated in a manner provided by law, or prosecuted in accordance with Chapter 99 of the Marbletown Code.
D. 
Penalties. In addition to or as an alternative to any penalty provided herein or by law, any person who violates the provisions of this chapter[3] shall be guilty of a violation punishable by a fine not exceeding $350 or imprisonment for a period not to exceed six months, or both for conviction of a first offense; for conviction of a second offense, both of which were committed within a period of five years, punishable by a fine not less than $350 nor more than $700 or imprisonment for a period not to exceed six months, or both; and upon conviction for a third or subsequent offense, all of which were committed within a period of five years, punishable by a fine not less than $700 nor more than $1,000 or imprisonment for a period not to exceed six months, or both. However, for the purposes of conferring jurisdiction upon courts and judicial officers generally, violations of this chapter shall be deemed misdemeanors and for such purpose only all provisions of law relating to misdemeanors shall apply to such violations. Each week's continued violation shall constitute a separate additional violation.
[3]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
E. 
Withholding of certificate of occupancy. If any building or land development activity is installed or conducted in violation of this chapter,[4] the Town Code Enforcement Officer may prevent the occupancy of said building or land.
[4]
Editor's Note: See also § 200-53, Stormwater management and erosion and sediment control.
F. 
Restoration of lands. Any violator may be required to restore land to its undisturbed condition. In the event that restoration is not undertaken within a reasonable time after notice, the Town of Marbletown may take necessary corrective action, the cost of which shall become a lien upon the property until paid.