A.Â
All subdivisions within existing sewer districts,
sewer improvement areas or other legal municipally run sewer systems
shall provide public sewers, constructed in accordance with the requirements,
standards and specification of the town and/or village, at the expense
of the developer.
B.Â
These sewers shall be connected to a wastewater treatment
plant constructed, owned and operated by the town and/or village.
The developer shall provide to the town and/or village, at his expense,
all necessary sewers and rights-of-way to connect the subdivision
sewers to the wastewater treatment plant.
C.Â
The fee to accompany the application to the Superintendent
and/or Engineer for a permit to construct the sewers shall be the
amount established by resolution of the Board of Trustees. This amount
shall cover the costs of filing and the Engineer's review of the plans
and the specifications that are submitted and the cost of inspection
during construction.[1] The Engineer shall establish the estimated cost of sewer
construction upon which the fee is based. An application for a permit
to construct public sewer is available from the Engineer or his designated
representative.
[Amended 2-12-1997 by L.L. No. 3-1997]
[1]
Editor's Note: See Ch. A154, Fees.