[HISTORY: Adopted by the Town of Brewster
as indicated in article histories. Amendments noted where applicable.]
[1]
Editor's Note: Former Art. I, Dredging of
Tidal Waters, adopted 3-7-1966 ATM, Art. 41, was repealed 11-20-1995
FYTM, Art. 11.
[Adopted 5-14-1974, ATM, Art. 86]
[Amended 5-14-1985 ATM, Art. 59]
No topsoil, gravel, loam or stone in the Town
may be removed to be transported outside the Town of Brewster, except
from established pits and stockpiles, unless authorized by a special
permit from the Board of Appeals.
No topsoil, subsoil, gravel, loam, sand, stone
or other earth in the Town may be removed to be transported either
outside the Town or from place to place within the Town of Brewster,
nor may any land be filled, unless the entire area of such removal
or filling be graded and replanted with soil-improving plants, with
a permanent cover crop or by reforestation, so that any scars resulting
from such removal shall not remain unplanted for a period of longer
than six (6) months, with the exception of the Town disposal area.