Before final approval of a plat, the subdivider shall install street and utility improvements as hereinafter provided. If such improvements are not installed as required at the time that the final plat is submitted for approval, the subdivider shall, before the approval of the plat, enter into a development agreement with Elm Grove agreeing to install the required improvements and file, as a condition of execution of said developer's agreement, a bond in the amount of 110% of the estimated cost of the improvements and in form meeting the approval of the Village Attorney or a certified check in an amount equal to 110% of the estimated cost of the improvements. This estimate is to be made by the Village Engineer, as a guaranty that such improvements will be completed by the subdivider or his subcontractors not later than one year from the date of recording of the plat and as a further guaranty that all obligations to subcontractors for work on the development are satisfied.
Contractors and subcontractors who are to be engaged in the construction of street and utility improvements on dedicated street rights-of-way shall be subject to the approval of the Village Engineer.
The subdivision shall be monumented as required by Section 236.15 of the Wisconsin Statutes which is hereby adopted by reference.
A. 
Before the final plat of a subdivision located within the village limits will be approved, the subdivider shall provide the following facilities, give satisfactory proof that he/she has contracted to install such facilities, or file a performance bond insuring that such facilities will be installed within the time required by the Board of Trustees:
(1) 
Water and sanitary sewer mains, and laterals to the lot line, where connection to existing systems can be reasonably provided.
(2) 
Streets graded to full width and the roadway graded to subgrade. After installation of the water and sewer facilities, the roadway shall be surfaced with six inches of crushed gravel and a seal coat applied.
(3) 
Adequate facilities to provide surface water drainage. The adequacy of such facilities shall be subject to approval of the Village Engineer.
Within 10 days of final approval of a final plat or certified survey map, subdividers shall provide the Village Engineer with an electronic file of the final plat or certified survey map in a format compatible with the village's digital parcel mapping and Geographic Information System (GIS) as specified by the Village Engineer.