Engineering fee. The subdivider shall pay a fee equal
to the actual cost to the Village for all engineering work incurred
by the Village in connection with the plat or certified survey map,
including inspections required by the Village. The subdivider shall
pay a fee equal to the actual cost to the Village for such engineering
work and inspection as the Village Engineer deems necessary to assure
that the construction of the required improvements is in compliance
with the plans, specifications and ordinances of the Village or any
other governmental authority. Engineering work shall include the preparation
of construction plans, standard specifications, inspections and administration
of the engineering work.