A. 
General. The subdivider shall pay the Village of Orfordville all fees as hereinafter required and at the times specified before being entitled to recording of a plat or certified survey map.
B. 
Engineering fee. The subdivider shall pay a fee equal to the actual cost to the Village for all engineering work incurred by the Village in connection with the plat or certified survey map, including inspections required by the Village. The subdivider shall pay a fee equal to the actual cost to the Village for such engineering work and inspection as the Village Engineer deems necessary to assure that the construction of the required improvements is in compliance with the plans, specifications and ordinances of the Village or any other governmental authority. Engineering work shall include the preparation of construction plans, standard specifications, inspections and administration of the engineering work.
C. 
Administrative fee. The subdivider shall pay a fee equal to the cost of any legal, administrative or fiscal work which may be undertaken by the Village in connection with the plat or certified survey map.
D. 
Review fees for preliminary plats, final plats and condominium development shall be as set by the Village Board from time to time.[1]
[1]
Editor's Note: Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. II).
E. 
Objecting agency review fees. The subdivider shall directly transmit all fees required for state agency review at the time of application. Said review fees shall be retransmitted to the proper state review agency by the Village Clerk-Treasurer. Said fees shall be applicable, where appropriate, to review fees required by the Wisconsin Department of Administration, Wisconsin Department of Transportation, Wisconsin Department of Commerce and the Wisconsin Department of Natural Resources.[2]
[2]
Editor's Note: Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. II).