CITY
The City of Northfield.
CONTRACTOR
That individual or company who or which is under contract with the City of Northfield for installation of sewer laterals.
OWNER
Any individual or individuals holding title of record to real property in the City of Northfield and who are building in an individual capacity, as opposed to a developer.
[Amended 10-26-2021 by Ord. No. 11-2021]
On all new construction in the City of Northfield, the owner holding title of record shall prepay to the City the standard charge for the installation of a sewer lateral to service said property, pursuant to § 288-15.
[Amended 4-24-2001 by Ord. No. 4-2001; 7-19-2005 by Ord. No. 6-2005; 4-24-2006 by Ord. No. 5-2006; 10-26-2021 by Ord. No. 11-2021]
A. 
The standard charge for installation shall be determined by the contractor on the basis of distance and depth and shall be based upon a rate fixed by the terms of the current agreement for general repairs and construction of sanitary sewer and stormwater facilities which is in effect on the date of commencement of construction.
B. 
Sewer connection fees for residential/commercial industrial.
(1) 
City of Northfield allocates the basic single-family sewer connection based on a capacity flow of 300 gallons per day (gpd), which is referred to as a domestic consumer unit or DCU.
(2) 
The minimum connection allocation for a project is one DCU.
(3) 
The minimum base connection fee for each DCU is $2,600 for projects generating in excess of 300 gpd. Connection fees will be adjusted as follows: total gpd divided by 300 x $2,600. For example: a project with 7,650 gpd is the equivalent of 25.5 DCUs requiring a connection fee of $66,300 (25.5 X $2,600 = $66,300).
(4) 
If said property is reconnected within two years of the disconnection, the connection fee shall only be $300. If reconnection occurs after a two-year time frame of disconnection, the connection fee shall be the base $2,600, if no change in use. A change in use with more DCUs, which generate more flow, additional connection fees will be required. The City reserves the right to meter flows or monitor water usage of industrial or commercial accounts to determine if their assigned allocation requires purchasing of additional DCUs.
(5) 
All new construction installation costs are the responsibility of the applicant or owner holding title of record and if not part of a sewer extension shall prepay the installation costs for the portion within the City right-of-way.
C. 
Schedule of DCU for sewerage service (according to the New Jersey Register) may be found in N.J.A.C. 7:14A-23.3.
Any additional or unforeseen costs and expenses incurred by the contractor during the installation of a sewer lateral shall also be paid by the owner holding title of record, and the issuance of a certificate of occupancy for said property is expressly conditioned upon prior payment of said cost and expenses in full.
This Part 3 shall apply to all new construction, except those cases involving a sewer extension wherein it is the developer's responsibility to install sewer laterals.