[HISTORY: Adopted by the Board of Trustees of the Village of Croton-on-Hudson 7-21-2008 by L.L. No. 3-2008.[1] Amendments noted where applicable.]
GENERAL REFERENCES
Building construction — See Ch. 86.
Environmental quality review — See Ch. 116.
Erosion and sediment control — See Ch. 118.
Excavation, filling and topsoil removal — See Ch. 120.
Flood damage prevention — See Ch. 129.
Stormwater, drainage, erosion and water pollution control — See Ch. 196.
Subdivision of land — See Ch. 200.
Tree preservation — See Ch. 208.
Water supply protection — See Ch. 223.
Zoning — See Ch. 230.
[1]
Editor's Note: This local law also repealed former Ch. 195, Steep Slopes, adopted 7-24-1989 by L.L. No. 6-1989, as amended.