[HISTORY: Adopted by the Board of Supervisors of the Township
of Pine 1-22-2019 by Res. No. 1011.[1] Amendments noted where applicable.]
GENERAL REFERENCES
Excavation and grading — See Ch. 48.
Flood damage prevention — See Ch. 56.
Acceptance of private roads — See Ch. 65.
Subdivision and land development — See Ch. 78.
Zoning — See Ch. 84.
[1]
Editor's Note: This resolution also superseded former Ch.
70, Standard Details, adopted 5-21-2007 by Res. No. 759.
A.
The
Township of Pine's Standard Details, as prepared and recommended by
the Township of Pine's Engineer and professional consultants, and
consisting of the following documents and drawings:
Drawing No.
|
Name
|
Created or last revised
|
---|---|---|
GN-1
|
General Notes
|
January 2006
|
ES-1
|
Erosion Control Detail
|
July 2001
|
ES-1A
|
Erosion Control Detail
|
July 2001
|
ES-1B
|
Erosion Control Detail
|
January 2006
|
ES-2
|
Erosion Control Detail
|
July 2001
|
ES-3
|
Erosion Control Detail
|
July 2001
|
ES-4
|
Erosion Control Detail
|
July 2001
|
ES-4A
|
Erosion Control Detail
|
July 2001
|
ES-4B
|
Erosion Control Detail
|
July 2001
|
ES-5
|
Erosion Control Detail
|
July 2001
|
RSD-1
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-2
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-3
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-4
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-5
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-6
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-6A
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-7
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-8
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-9
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-10
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-11
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-12 (1 of 2)
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-12 (2 of 2)
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-13 (1 of 2)
|
Roadway and Site Drainage Detail
|
July 2001
|
RSD-13 (2 of 2)
|
Roadway and Site Drainage Detail
|
July 2001
|
SWM-1 (1 of 8)
|
Stormwater Management Detail
|
July 2001
|
SWM-1 (2 of 3)
|
Stormwater Management Detail
|
January 2006
|
SWM-1 (3 of 3)
|
Stormwater Management Detail
|
July 2001
|
SWM-2
|
Stormwater Management Detail
|
July 2001
|
SWM-3
|
Stormwater Management Detail
|
July 2001
|
SWM-3A
|
Stormwater Management Detail
|
July 2001
|
SWM-4
|
Stormwater Management Detail
|
July 2001
|
SWM-5
|
Stormwater Management Detail
|
July 2001
|
SWM-6
|
Stormwater Management Detail
|
July 2001
|
SWM-6A
|
Stormwater Management Detail
|
July 2001
|
SWM-7
|
Stormwater Management Detail
|
December 2018
|
SWM-8
|
Stormwater Management Detail
|
July 2001
|
SWM-8A
|
Stormwater Management Detail
|
July 2001
|
R-1
|
Roadway Detail
|
December 2004
|
R-2
|
Roadway Detail
|
December 2018
|
R-2a
|
Roadway Detail
|
December 2018
|
R-3
|
Roadway Detail
|
December 2009
|
R-4
|
Roadway Detail
|
August 2009
|
R-5
|
Roadway Detail
|
December 2004
|
R-6
|
Roadway Detail
|
August 2009
|
R-7
|
Roadway Detail
|
December 2004
|
R-8
|
Roadway Detail
|
July 2001
|
R-9
|
Roadway Detail
|
December 2018
|
S-1
|
Site Detail
|
December 2004
|
S-2
|
Site Detail
|
August 2009
|
S-3
|
Site Detail
|
December 2018
|
S-4a
|
Site Detail
|
December 2018
|
S-4b
|
Site Detail
|
August 2009
|
S-5
|
Site Detail
|
July 2001
|
S-6
|
Site Detail
|
July 2001
|
S-7
|
Site Detail
|
December 2018
|
S-8
|
Site Detail
|
July 2001
|
S-9
|
Site Detail
|
December 2018
|
S-10
|
Site Detail
|
December 2018
|
S-11
|
Site Detail
|
September 2009
|
S-11/1
|
Site Detail
|
September 2009
|
S-11/2
|
Site Detail
|
September 2009
|
S-11/3
|
Site Detail
|
October 2009
|
S-11/4
|
Site Detail
|
October 2009
|
S-11/5
|
Site Detail
|
October 2009
|
S-12
|
Site Detail
|
July 2001
|
S-13
|
Site Detail
|
December 2018
|
S-14
|
Site Detail
|
July 2001
|
S-15
|
Site Detail
|
January 2006
|
S-16
|
Site Detail
|
July 2001
|
S-17
|
Site Detail
|
December 2018
|
TDS-72 to 90
|
Trail Design Standards
|
June 30, 2005
|
BD-91 to 110
|
Boulevard District Streetscape Standards
|
April 2007
|
PR-1
|
Recreation Detail
|
December 2018
|
PR-2
|
Recreation Detail
|
December 2007
|
PR-3
|
Recreation Detail
|
December 2007
|
PR-4
|
Recreation Detail
|
December 2007
|
PR-5
|
Recreation Detail
|
December 2007
|
PR-6
|
Recreation Detail
|
December 2007
|
PR-7A
|
Recreation Detail
|
December 2008
|
PR-7B
|
Recreation Detail
|
December 2008
|
PR-8A
|
Recreation Detail
|
December 2008
|
PR-8B
|
Recreation Detail
|
December 2008
|
PR-8C
|
Recreation Detail
|
December 2008
|
PR-8D
|
Recreation Detail
|
December 2008
|
PR-9A
|
Recreation Detail
|
December 2008
|
PR-9B
|
Recreation Detail
|
December 2008
|
PR-9C
|
Recreation Detail
|
December 2008
|
PR-10A
|
Recreation Detail
|
December 2008
|
PR-10B
|
Recreation Detail
|
December 2008
|
PR-10C
|
Recreation Detail
|
December 2008
|
PR-10D
|
Recreation Detail
|
December 2008
|
PR-10E
|
Recreation Detail
|
December 2008
|
PR-10F
|
Recreation Detail
|
December 2008
|
PR-10G
|
Recreation Detail
|
December 2008
|
PR-11A
|
Recreation Detail
|
December 2008
|
PR-12
|
Recreation Detail
|
December 2008
|
All references within the official documents of the Township,
including but not limited to those within the Code of the Township
of Pine, which refer to the Township's standard details/specifications
and requirements for erosion control, roadway and site drainage, stormwater
management, roadway construction, site details, Trail Design Standards,
Boulevard District Streetscape and Landscape Standards, and Parks
and Recreation Details shall now be deemed to refer to the specifications
contained in the attached Township of Pine Standard Details.