Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Townsend, MA
Middlesex County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Amended 3-16-1987 STM by Art. 20]
Except as hereinafter provided, this Bylaw shall not apply to structures or uses lawfully in existence or lawfully begun, or to a building or special permit issued before the date of the first publication of notice of the public hearing of such Bylaw required by MGL c. 40A, § 5.
[Amended 4-27-1991 STM by Art. 2]
Pre-existing, nonconforming structures or uses may be extended, altered, changed or rebuilt only by special permit from the Board of Appeals and subject to the provisions of § 145-65F. Any such rebuilding, change, extension or alteration shall not be more detrimental than the existing nonconforming use to the neighborhood. Exempted from the requirement for a special permit are the following:
A. 
Alteration, reconstruction, extension or structural change to a nonconforming single- or two-family residential structure where such change does not increase the nonconforming nature of said structure.
B. 
Interior alteration of any existing structure which does not change the nature of, nor increase the intensity of a nonconforming use.
C. 
Reconstruction of a legally nonconforming structure damaged or destroyed by fire or other accidental or natural cause if reconstruction is started within 24 months and completed within 36 months of the damage or destruction.
Any nonconforming use or structure which has been abandoned or discontinued for two years or more loses the protection of § 145-17 and shall be required to conform to the current Bylaw.
Construction or operation under a building permit or special permit must conform to any subsequent amendments of the Zoning Bylaw unless the use or construction is commenced within a period of six months after the issuance of the permit and in cases involving construction, unless such construction is continued through to completion continuously and expeditiously.
[Added 4-27-1991 STM by Art. 3]
Setback requirements for the construction of any accessory structure or addition to an existing dwelling need only conform to the Zoning Bylaw requirements in existence at the time of issuance of the original building permit. For structures in existence prior to the Zoning Bylaw refer to § 145-18.