Developers proposing projects for which engineering review of plans is required shall submit plans in accordance with these specifications, in addition to those required by the applicable Municipal Code regulations. The developer shall submit conceptual, preliminary and final subdivision plans as outlined in the sequence of procedures in Article
I of this document, application materials specified in the site plan review or specifications of other local laws, as applicable to the project. The Town Clerk can advise which law(s) applies to the development and what information is required. Reference should also be made to the subdivision requirements checklist in §
38-4.
The developer shall take all necessary measures to control dust resulting from his construction operations and to prevent spillage of excavated material on public roads. When directed by the Town Building Inspector, the developer shall apply calcium chloride and/or water where directed and in such quantities and at such frequencies as may be required to control such dust and prevent it from becoming a nuisance to the surrounding area.
All utilities shall be underground, including electric, telephone and cable television. This regulation shall be enacted in accordance with the New York State Public Service Commission ruling (tariffs) for all public utilities. Utility companies shall obtain the necessary approvals and permits prior to starting construction.