[Added 4-11-2005 by Ord. No. 1247-2005]
A.
Purpose. Provisions for the SMD Overlay District has
been enacted to:
(1)
Implement the Tier I "Revitalization Plan 2002," dated
August 23, 2002, and in particular the Revitalization Guidelines and
Best Practices.
(2)
Implement the Tier II "Urban Center Revitalization
Plan," dated December 23, 2002.
(3)
Foster redevelopment of the area adjoining the Central
Business District (CBD).
(4)
Promote the revitalization and redevelopment of the
City as a compact, mixed-use, pedestrian-oriented place.
(5)
Provide for the interpretive design of new structures
and development and adaptive reuse of the existing remaining historic
industrial buildings.
B.
C.
General design principles. The overarching principles
for SMD design and development shall be consistent with the Revitalization
Guidelines and Best Practices in the Tier I "Revitalization Plan 2002"
with particular emphasis on:
(1)
Adaptive reuse of an existing building.
(2)
Building height/width/proportion.
(3)
Building location.
(4)
Building placement (setback).
(5)
Building separation distances.
(6)
Building size.
(7)
Building types.
(8)
Buildings: vertical form.
(9)
Build-to line.
(10)
Curb cuts.
(11)
Deck parking structure.
(12)
First floor/ground floor use.
(13)
Infill development.
(14)
Landscaping.
(15)
Mixed use.
(16)
Parking: off-street.
(17)
Parking: on-street.
(18)
Parking lots — private.
(19)
Parking lots — public.
(20)
Sidewalks, walkways, and pedestrian links.
(21)
Street and alley network.
(22)
Street lights.
(23)
Street trees/shade trees.
(24)
Street wall.
(25)
Streetscape.
D.
Permitted uses and structures. The following uses and structures may be permitted, and shall not be subject to Article IX and Article XI:
E.
Lot area, width, coverage, yard and height requirements.
(2)
Lot width: 16 feet minimum.
(3)
Lot coverage: 98% maximum, subject to the provisions of § 224-100F(5)(b) for the other 2% of lot coverage.
(4)
Yards: front, zereo; side, zero; rear, zero feet minimum,
provided the primary facades of buildings are located at the edge
of the sidewalk facing a street or on a pedestrian promenade between
the fronts of two buildings.
F.
Development standards. In addition to the standards in § 224-100C (and Appendix A), the following shall apply:
(1)
The design of the project will incorporate sound design
principles, although, through interpretive design, the layout may
reflect the development pattern of the original industrial development.
(2)
Parking: build and maintain in rear of buildings,
in deck parking structure, or in parking garage.
(3)
Pedestrian access: build and maintain sidewalks on
both sides of all streets. Sidewalks shall be a minimum of four feet
six inches in width.
(4)
Signage: as appropriate to identify development or
facility, up to 64 square feet as a promotional sign. However, such
sign shall be considered as a temporary sign that shall be removed
within 14 days of receipt of a certificate of occupancy.
(6)
Lighting: no trespass glare above 0.5 footcandles
at the property line.
(7)
Utilities: place new utilities underground.
G.
Procedures for approval of development in the SMD
Overlay District.
(1)
All applicants are encouraged to submit sketch plans
for all SMD proposals.
(2)
The applicant shall follow the preliminary and final
plan application requirements of the City of Coatesville Subdivision
and Land Development Ordinance and shall include the following information:
(a)
Building plan. A separate plan sheet shall be
submitted to depict the proposed building program. Said plan shall
indicate the proposed principal and accessory uses, the gross square
footages of all uses, and the building heights. The building plan
shall also indicate the total lot coverage, existing and proposed.
(b)
Street, alley, streetscape and pedestrian plan.
A separate plan sheet shall be submitted to depict the proposed street
network. Such plan shall indicate all street widths and pedestrian
pathway network.
(c)
Staging/phasing plan. A separate plan sheet
shall be submitted to depict proposed staging or phasing of the land
development.
(d)
Landscape/hardscape plan. A separate plan sheet
shall be submitted to depict all proposed landscape/hardscape.
(e)
Parking plan.
[1]
A separate plan sheet shall be submitted to
depict proposed surface and deck parking. Such plan shall list the
number of parking spaces proposed in relation to the proposed use(s).
[2]
On-street parking spaces may be counted toward
the overall parking requirement whenever such parking is located along
the frontage of the property that is proposed for development.
[3]
Off-street deck parking may be counted toward
the overall parking requirement whenever such parking is located within
400 feet of the property proposed for development.
(g)
Utilities plan. A separate plan sheet shall
be submitted to depict all proposed utilities.
(h)
Manual of design guidelines. At the time of land development plan submission for each phase or stage of development, a manual of design guidelines shall be submitted to illustrate the proposed design excellence, architectural excellence, and related construction excellence for the proposed architectural, streetscape, and landscape features. Said manual shall be consistent with the applicable General Design Principles set forth in Exhibit B of Article XVIII, and shall be submitted for approval by City Council, which approval shall not be unreasonably denied provided it complies with the applicable aforementioned general design principles.
(i)
Declaration of covenants, easements and restrictions.
A declaration shall be submitted to the City and shall be in such
a form as deemed satisfactory to the City Solicitor.