Exciting enhancements are coming soon to eCode360! Learn more 🡪
Village of Saukville, WI
Ozaukee County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
The subdivider shall pay the Village all fees to the Village Treasurer as hereinafter required and at the times specified before being entitled to recording of a plat or certified survey map.
[Amended 6-24-2014 by Ord. No. 748]
The subdivider shall pay a fee in an amount as set by resolution of the Village Board to the Village Treasurer at the time of first application for approval of any preliminary plats or certified survey maps to assist in defraying the cost of review. A reapplication fee in an amount as set by resolution of the Village Board shall be paid to the Village Treasurer at the time of reapplication for approval of any preliminary plat which has previously been reviewed.
The subdivider shall pay a fee or present a bond, certified check or irrevocable letter of credit equal to 1% of the cost of the required public improvements as estimated by the Village Engineer at the time of the submission of improvement plans and specifications. The fee may be recomputed, upon demand of the subdivider or Village Engineer, after completion of improved construction in accordance with the actual cost of such improvements and the difference, if any, shall be paid by or remitted to the subdivider. Evidence of cost shall be in such detail and form as required by the Village Engineer.
The subdivider shall pay a fee to the Village Treasurer equal to the actual cost to the Village for such inspections as the Village Engineer deems necessary to assure that the construction of the required improvements is in compliance with the plans, specifications and ordinances of the Village or any other governmental authority.
[Amended 6-24-2014 by Ord. No. 748]
The subdivider shall pay a fee in an amount as set by resolution of the Village Board to the Village Treasurer at the time of submittal of the final plat to assist in defraying the cost of review. A reapplication fee in an amount as set by resolution of the Village Board shall be paid to the Village Treasurer at the time of reapplication for approval of any final plat which has previously been reviewed.
[1]
Editor's Note: Former § 176-82, Public site fee, was repealed 7-18-2006 by Ord. No. 654 as being contrary to § 236.45(6), Wis. Stats.
The subdivider shall pay to the Village Treasurer a fee equal to the actual cost to the Village for all engineering work incurred by the Village in connection with the plat. In addition:
A. 
Engineering work shall include the preparation of construction plans and standard specifications. The Village Engineer may permit the subdivider to furnish all, some or part of the required construction plans and specifications, in which case no engineering fees shall be levied for such plans and specifications.
B. 
Inspection, checking and reviewing work has fees provided for in §§ 176-79 and 176-80.
The subdivider shall pay a fee equal to the cost of any legal, administrative or fiscal work which may be undertaken by the Village in connection with the plat or certified survey map. Legal work shall include the drafting of contracts between the Village and the subdivider. These fees may also include the cost of obtaining professional opinions including, but not limited to attorneys, engineers, landscape architects and land planners, requested by the Village Board or Plan Commission in connection with the land division being considered.
[Amended 6-24-2014 by Ord. No. 748]
The subdivider shall pay a fee in an amount as set by resolution of the Village Board to assist in defraying the cost of review. The fee shall be paid to the Village Treasurer at the time of submittal of the preliminary plat.
All review fees required by objecting agencies, including the Wisconsin Department of Adminstration, Department of Transportation, Department of Commerce and the Department of Natural Resources, shall be paid by the subdivider to the proper reviewing agency at the time of application.