This chapter is a compilation of fees that are cited throughout the Code of the Village of Saukville. The source of enactment of the fees listed below, and any amendments thereto, is cited in the applicable Code section. This chapter serves as a convenient source to view fees; consult the Code chapter for additional regulations.
B. 
This schedule of fees, deposits and charges pertains to licenses, permits and activities required or regulated under the provisions of various chapters of the Code of the Village of Saukville. Applications for and the issuance of such licenses and permits are subject to the provisions of the specific chapter of the Code which is indicated for each type of license or permit. The business, activity or operation for which the license or permit is required is subject to all regulations set forth in the chapter to which reference is made and to all other applicable laws and regulations.
C. 
The fees are subject to change, and the user may confirm the currently effective fee with the Village Clerk's office.
[Last amended 3-20-2018]
Code Section
Type of Application, Permit or License
Fee
41-4F(1)
Photocopying (per page)
$0.25
41-4F(7)
Property and special assessment reports
$25
48-1A
Service by Police Department of a warrant or commitment order
$35
55-1A
Class "A" fermented malt beverage retailer's license
$200
Class "B" fermented malt beverage retailer's license
$100
Six-month license
1/2 the annual fee
Temporary Class "B" beer
$10 per event
Wholesaler's fermented malt beverage license
$25
Retail "Class A" intoxicating liquor license
$500
Retail "Class B" intoxicating liquor license
$500
Temporary "Class B" wine (per event)* (*no fee if obtained with Temporary Class "B" beer)
$5
"Class C" wine license
$100
55-1B
Operator's license (alcohol beverages) (per year)
New
$35
Renewals
$30
Provisional
$15
55-2
Initial retail reserve "Class B" license
$10,000
58-3B
Operation of a mechanical or electronic amusement device (per machine, per year)
$25
58-4B
Minor arcade license (per year)
$100
58-5B
Major arcade license (per year)
$300
58-7B
Transfer of minor arcade license
$10
61-8
Dog license
Spayed/neutered
$8
Not spayed or neutered
$10
After March 31 of each year
$5 late fee
61-8
Cat license
Spayed/neutered
$5
Not spayed or neutered
$7
After March 31 of each year
$3 late fee
64-2D
Large assemblies license (per day)
$100
72-6A
Fence/architectural screening permit fee
$35
72-8
Building permit fees:
Residential, one- and two-family (including attached garages)
$0.39/gross sq. ft.
Residential, three-family or more (includes row housing and attached garages)
$0.39/gross sq. ft.
Commercial and industrial buildings (including additions)
$0.37/gross sq. ft.
Residential, additions, alterations, detached garages, swimming pools, deck
$11.75/$1,000 of valuation
Commercial and industrial alterations
$11.75/$1,000 of valuation
Commercial occupancy appl. - tenant charge
$30
Utility buildings (max. 144 sq. ft.)
$30
Residing, reroofing, major repairs
$11.75/$1,000 of valuation ($265 max.)
Permit to start construction (early start) of footings and foundations
$200 UDC; $265 others
Wrecking/razing
Base fee
$80
Additional fee per 100 sq. ft.
$10
Moving of structures
Base fee
$215
Additional fee per sq. ft.
$0.10
Flammable liquid storage
$15/tank
Minimum fee (unless noted)
$50
Reinspections
$75
Special inspections
$165 each
After hours inspections
$105 each
Minimum fee (unless noted)
$50
Signs
$30 plus $1/sq.ft.
Mechanical permit fees:
Heating unit up to 150,000 BTU
$50
Additional fee more than 150 BTU per 50K
$17
Air conditioning up to 3 ton
$50
Additional fee more than 3 ton each add'l ton
$17
HVAC distribution systems per 100 sq. ft.
$50
Additional fee per 100 sq. ft. more than 3,200 sq. ft.
$1.90
Exhaust hoods and exhaust systems
$165/unit
Fireplace
$50
Permanently installed wall A/C units
$10/unit
HERV-HEAT/energy recovery unit
$50
Commercial plan review
$60
Minimum fee
$50
Plan examination:
Residential:
Residential - one and two family (new)
$235
Residential additions
$80
Residential alterations
$50
Res. accessory structures (more than 20 sq. ft.)
$60
Resubmission of app. plans
$50
Commercial:
Commercial multifamily plan exam (base)
$285
Commercial multifamily per unit plan exam
$25
Commercial/industrial (new plan exam)
$285
Commercial/industrial adds/alts plan exam
$285
Comm/ind heating plan review
$60
**Comm/ind thermal calculations
$60
**Comm/ind illuminations plan
$60
**Comm/ind HVAC operations plan
$60
Resubmission of app. plans
$50
(**if applicable)
Commercial priority plan review and permit issuance. At the discretion of the Building Inspector and depending upon the workload, a five-business day priority plan review and permit issuance may be provided at double the regular rate for commercial plan review and permit fees. Commercial priority plan review and permit issuance is not applicable and shall not apply to submittals requiring review, approval and/or permit issuance by other governing local, state, or federal agencies.
Occupancy certificates
Residential 1- and 2- and all multifamily
$50/unit
Commercial and industrial - new/adds
$205
Comm/ind change of ownership/occupancy
$30
Comm/ind temporary occupancy
$80
Wisconsin State Seal
State Charge + $25
House numbers - number set
$7
Individual numbers
$1 each
Plates
$2 each
Erosion control fees:
One- and two-family
$165/lot
Multifamily
$315/building
Commercial, industrial, institutional (base)
$315/building
Residential and commercial, plus lot area
$5/1,000 sq. ft.
Other
$50
Failure to call - Inspection #1
$100
Administrative fee - state variance
$35
Architectural Board review fee
$35
Failure to obtain permit before work commences
Double fees, possible citations
72-10C
Property record maintenance fees
Residential:
Residential (one- and two-family)
New
$250
Residential additions/alterations
$80
Accessory structures
$15
Pools, decks, fireplaces, other
$15
Demolition
$15
Condominiums: (3 or more units)
New
$400 + $75/unit
Residential additions/alterations
$80/unit
Accessory structures
$30
Pools, fireplaces, decks
$15
Other
$30
Demolition
$15
Multifamily (3 or more units)
New
$450 + $75/Unit
Residential additions/alterations
$80/unit
Accessory structures
$30
Pools, fireplaces, decks
$15
Other
$30
Demolition
$15
Commercial/industrial/institutional
New: Base fee (up to 5,000 sq. ft. gross)
$500
Less than 5,000 sq. ft. gross
$0.050/sq. ft.
Additions: Base fee (up to 2,500 sq. ft. gross)
$200
Over 2,500 sq. ft. gross
$0.03/sq. ft.
Alterations
$110
Accessory structures
$50
Pools, fireplace
$20
Other
$30
Demolition
$15
Reside/re-roof/repair max fees
$260
Tenant occupancy
$30
82-4
Grave lot price
$800
82-7
Full burial grave opening
$800
Cremation burial grave opening
$350
82-10
Winter burial
3 x regular grave opening fee
85-2
Cigarette license
$100
90-1
Driveway approach permit
$20
If work begins prior to permit
$60
94-15
Electrical permit fees
Switches and outlets
$0.70 each
Incandescent light fixtures
$0.70 each
Mercury, sodium, MI, vapor lighting
$5/fixture
Fluorescent lamps - per section
$2.50 each
Dimmers/GFCI/AFCI
$6 each
Re-ballasting, per ballast
$1 each
Dishwasher
$12 each
Disposal
$12 each
Sump pump
$12 each
Residential whirlpool, tub, Jacuzzi
$12 each
Range, oven, cook top
$12 each
Clothes dryer
$12 each
Water heater
$12 each
Furnace, boiler, unit heater, etc.
$18 each
Air conditioning - sleeve
PATC, Central air - to 3 ton
$20 each
Cost per ton more than 3 ton (max. 50 ton)
$2.50/ton
RTUs
0 to 5 ton
$50 each
6 to 25 ton
$75 each
26+ tons
$125 each
Fans: bath, kitchen
$5 each
Low-voltage systems: doorbell, switching systems, fire alarm, detectors
$2 each
Refrigeration:
Per rack, vertical
$25
Per section, horizontal
$5
Electric heat per KW
$5
Fuel pumps per product dispense at island
$50 each
Bus. duct systems
$1/foot
Generator
$50/unit
Transformer, capacitor
$20/unit
Motors
Maximum 5 HP
$15 each
Per each HP over 5 HP
$3
Signs
First section (incan., fluor)
$25
Each additional section
$5
Signs - Neon and like
$25
Plus per trans
$4
Fire alarm systems
First panel
$50
Each additional panel
$25
Fire alarm systems: device (horn/strobe, detector, pull station)
$0.60/each
Service new or change (includes temporary service or any components), State Seal charge additional.
0 to 100 amp
$40 each
101 to 200 amp
$50 each
201 to 600 amp
$75 each
601 amp and greater
$125 each
Meter equipment
$15 each
Sub panels
$30 each
Feeders 50 amp and greater
$25 each
Medical equipment
$50 each
Power outlets more than 120 volts/20 amp
$10 each
Outdoor lighting per pole
$25
Trenching - minimum
$25
First 100 feet
$25
Per foot more than 100 feet
$0.50
Swimming pools, grounding grid Aboveground
$30
In-ground
$25
Each light fixture
$15
Re-inspection
$50
Inspection - after hours
$100
Re-wire, alter, repair
$25
Security System Panel/CPU
$50
Devices Detect, Cameras, Other - each
$0.60
New Home Group
$259
Minimum Permit Fee
$35
Work started prior to obtaining permit
Double fee
101-16F
Annual hydrant maintenance
$25
101-17C(1)
Open burning (burn permit)
$20
§ Ch. 118, Impact Fees[1]
118-6
Law enforcement facilities impact fee
Single-family or two-family residential development
$765/dwelling unit
Multifamily residential development
$574/dwelling unit
Studio and one-bedroom apartments
$382/dwelling unit
Commercial development
$0.28/sq. ft. of building space
Industrial development
$0.193/sq. ft. of building space
118-7
*Public works transportation facilities impact fee
Single-family or two-family residential development
$83/dwelling unit
Multifamily residential development
$62/dwelling unit
Studio and one-bedroom apartments
$42/dwelling unit
Commercial development
$0.025/sq. ft. of building space
Industrial development
$0.0158/sq. ft. of building space
118-8
*Library facilities impact fee
Single-family or two-family residential unit development
$637/dwelling
Multifamily residential development
$476/dwelling unit
Studio and one-bedroom apartments
$319/dwelling unit
136-2D
Park reservation fees
Resident fees:
Grady Park
Pavilion
$75
Concessions stand
$75
Schowalter Park
Pavilion
$50
Concessions stand
$50
Quade Park Pavilion
$50
Veterans Park
$50
Security/cleanup deposit - all parks
$100
Nonresident fees:
Grady Park
Pavilion
$175
Concession stand
$175
Schowalter Park
Pavilion
$150
Concessions stand
$150
Quade Park Pavilion
$150
Veterans Park
$150
Security/cleanup deposit - all parks
$100
143-4.C
Registration of direct sellers
Processing registration
$20
Registration fee
$5 per day; $15 per week; $30 per month; $100 per year
Each additional employee of any applicant
$5 per employee actively engaged in direct selling
Investigation of direct sellers
Residents
$15
Nonresidents
$25
143-13
Fund solicitation permit
$15
147-6
Plumbing permit fees
Fixtures/Appliances
$12 each
Future fixtures (stub-in), other
$12 each
B.F.P. (hard piped) 1"
$12
B.F.P. (hard piped) 2"
$24
B.F.P. (hard piped) 3"
$50
Inside sanitary, storm, bldg. drain
$50
Inside sanitary, storm, bldg. drain over 100 ft.
$0.50/foot
Ext. sanitary storm connection/first 100 ft.
$50 each
Ext. storm connection/first 100 feet
$50 each
Ext. storm and sanitary sewer over 100 ft.
$0.50/ft.
External water/sprinkler - first 100 ft.
$50
Over 100 ft. - cost per ft.
$0.50
Private system/tank abandonment
$100
Sprinkler systems (interior): per head
$0.30 each
First 100 feet of line (mains)
$30
Add'l line over 100 feet (mains)
$0.30/foot
Manhole/trench drain/catch basin/sewer ejector
$40 each
Repairs
$30 each
Grease trap - interior
$40
Grease trap - ext. less than 500 gals.
$100
Grease trap - more than 500 gals.
$200
Minimum fee
$35
Re-inspection
$50 each
After hours inspections
$150 each
New home group
$254
Bath group
$36
1/2 bath group
$24
Ext. plumbing - Group 1 (san.-stormwater)
$150
Ext. plumbing - Group 2 (sanitary-water)
$100
Failure to obtain permit before work
Double fee
Water meter permit
$150 each
161-7
License fee (sexually oriented businesses)
$250
161-9B
Renewal fee (sexually oriented businesses)
$250
Late penalty for filing renewal less than 60 days prior to expiration
$100
162-10
See § 205-23
173-3D
Right-of-way occupancy registration fee
$65
173-3G
Right-of-way excavation permit
$150 plus calculated charges
173-4C(3)
Street privilege permit
$20
Block party permit
$15
176-69.A
Tree planting
$300/tree
176-78
Preliminary plat or certified survey map review
$100, plus $5/lot or parcel
Reapplication
$25
176-81
Final plat review
$100, plus $5/lot or parcel
Reapplication
$25
176-85
Condominium development review
$100, plus $5/unit
180-3
Room tax: late filing fee for reports
$10
184-2
Taxicab license
$10
187-21C
Branch and brush chipping per twenty-minute increment
$50
192-16E
Bicycle license fee
$3
192-19E2
Snowmobile renters' license
$25
199-10D
Private well operation permit (for initial permit and each biennial renewal)
$25
199-10D
Reinspection of private well
$30
205-18
Grading permit
$200
205-22.1
Development expense reimbursement
Village staff and professional fees and costs to be reimbursed by developer
205-23
Temporary conditional use (flea markets, circuses, fireworks sales, farmers market, Christmas tree sales)
$100
Certificate of compliance
$100
Certificate of occupancy
$100
Conditional use permit
$400
Variance or appeal
$400
Amendment to Zoning Ordinance
$300
Special meeting
$250
205-118.1B
Erosion control plan
$200
205-119-7B
Stormwater management plan
$200
205-156
Land use permit
$200
Misc.
Fingerprint processing fee
$10
[1]
Section 118-11 of this chapter also provides that the impact fees noted below shall be increased annually at a rate equal to the percentage change in the Engineering News Record Construction Code Index for the previous 12 months, with the adjustment effective January 1 of each year. Fees listed here are from 2014. For current information, contact the Village of Saukville Municipal Center.