Search Results
pubdocs
Public Documents/Minutes/Town Board Minutes/2021-04-14
... Fee 6 $10.00 B2115B Building Permits 4 $230.00 B2115S Planning ... 32 Number of Building Permits Issued 7 Number of Building ... costs a building permit he has received in for a ... zoning, with a Special Use Permit approval. He was informed ...
filling (1)
permits (2)
permit (3)
fill (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2022-12-14
... Fee 5 $9.00 B2115B Building Permits 5 $386.80 B2115B Stop Work ... 8 Number of Building Permits Issued 5 Number of Building ... Riga, and he is hesitant to fill out this certification. The ... stated he did not need to fill out their forms as they are ...
permits (3)
permit (2)
fill (2)
pubdocs
Public Documents/Minutes/Town Board Minutes/2011-09-14
... building lot and a building permit has been issued; NOW, ... and if a building permit has been issued for said lot, ... lots that have building permits. This resolution will allow ... unit if a current building permit is on file as we are allowing ...
permits (3)
permit (10)
fill (1)
fill permit (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2011-08-10
... 22 Number of Building Permits Issued 6 Number of Building ... require C of O for approved permitted structure on any property, before building permits are granted and construction ... and presently receiving fill material from the water ...
permitted (1)
permits (5)
permit (2)
fill (2)
pubdocs
Public Documents/Minutes/Town Board Minutes/2014-02-12
... to Appoint Cynthia Jessop to fill the vacancy on the Town Board ... interviews of candidates to fill said vacancy, and NOW, ... Ms. Cynthia Jessop to fill the vacancy on the Town Board ... the special legislation to permit the Town Board to authorize ...
permits (2)
permit (3)
fill (5)
pubdocs
Public Documents/Minutes/Town Board Minutes/2014-09-10
... the Waiving of the Building Permit Fee for Rebuild after Fire or ... a fee for a building permit to rebuild a structure on ... to waive the building permit fee for any structure being ... 32 Number of Building Permits Issued 8 Number of Building ...
filling (1)
permitted (2)
permits (4)
permit (13)
pubdocs
Public Documents/Minutes/Town Board Minutes/2014-04-09
... in Section 3 and also permit the Town Board to authorize ... in Section 3 and also permit the Town Board to authorize ... adding wording that would permit the town to repair/improve of ... in Section 3 and also permit the Town Board to authorize ...
permits (3)
permit (9)
fill (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2022-01-03
... has graciously agreed to fill in till a suitable attorney ... 2022 Fee Schedule A building permit fee may be waived for any ... disaster. Activity or Permit Building Department Fees ... Construction Fee $100 Plus permit fees ...
permit (17)
filling permit (1)
fill (2)
pubdocs
Public Documents/Minutes/Town Board Minutes/2021-12-08
... Fee 8 $12.00 B2115B Building Permits 10 $1,400.00 B2115E ... 18 Number of Building Permits Issued 8 Number of Building ... are looking at candidates to fill that position. Mr. Kuter did ... Town Board to expediently fill this open position, due to ...
permits (3)
permit (1)
fill (2)
pubdocs
Public Documents/Minutes/Town Board Minutes/2019-03-13
... 12 Number of Building Permits Issued 3 Number of Building ... whether the use matched the permitted uses in an HC Zone. ... for a Special Use Permit in the HC zone. As the ... Mr. Schneider will be filling out the rezoning application ...
filling (1)
permitted (1)
permits (2)
permit (1)
filled (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2014-03-14
... 22 Number of Building Permits Issued 1 Number of Building ... county roads at least once filling holes. Many of the road edges ... pave as soon as weather permits. Last major rehab done in ... signs as time, weather and $ permit. Councilmember O’Brocta ...
filling (2)
permits (3)
permit (1)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2018-10-01
... of Engineers to discuss a permit for construction in the ... Matt stated that they have filled out all the paperwork ... required for that permit and they are just waiting to ... Mr. Kuter asked if the fill soil that was being brought ...
permit (4)
filled (1)
fill (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2018-05-09
... is similar) and it has been filled out with the information we ... 20 Number of Building Permits Issued 9 Number of Building ... is in process. After filling cooling tower and preparing ... She has to work on filling out four more information ...
filling (2)
permits (1)
permit (1)
filled (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2015-12-11
... 28 Number of Building Permits Issued 8 Number of Building ... ask the Town Attorney to fill in. 7. Assessor Ms. Frongetta ... throughout the town were filled and compacted.  ... and areas needing soil were filled and seeded. Grass is coming ...
permits (2)
filled (2)
fill (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2014-08-13
... 45 Number of Building Permits Issued 9 Number of Building ... and I have hired her back to fill the vacant Deputy ... power plant portion on the permit. They rescinded their ... hearing in November with permitting in 2015 and have the ...
filling (1)
permits (1)
permit (2)
filled (1)
fill (1)
permitting (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2011-01-03
... to the PLANNING BOARD, to fill the vacancy created by Gene ... continue, as Interim, until filled. The Supervisor is looking ... Plan $400.00 Special Use Permit – AG/RES Zoning All ... $50.00 $200.00 Special Use Permit – non exempt ...
filling (1)
permitted (1)
permits (2)
permit (13)
filled (1)
fill (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2015-06-10
... 25 Number of Building Permits Issued 8 Number of Building ... and Robertson need to be filled with hot asphalt and cure ... Divisible Load Overweight Permit.  Awaiting schedule ... out the rotted floor and filled in the 3 foot area below ...
permits (1)
permit (1)
filled (2)
fill (2)
pubdocs
Public Documents/Minutes/Town Board Minutes/2016-04-13
... and to apply for a NYS DOT Permit 33 (c) for said parade, to be ... The Supervisor stated this permit process will allow the ... 25 Number of Building Permits Issued 3 Number of Building ... a complete building permit application may comply with ...
permitted (1)
permits (1)
permit (4)
filled (1)
fill (1)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2021-09-13
... two lots, the EAF must be filled out for the entire ... water design and SPEDES permit is required based on full ... were saying about the SPEDES permit, I believe you are ... they have to supply a SPEDES Permit submission for a full build ...
permitted (2)
permit (8)
filled (1)
fill (2)
fill permit (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2019-10-09
... 36 Number of Building Permits Issued 17 Number of Building ... weather (rainfall) and time permits. Practice is conducted weekly ... class 2 tributary requiring permits from DEC and Army Corp of ... Assisted All town roads Fill potholes Stearns Road ...
permits (3)
fill (2)