Search Results
pubdocs
Public Documents/Minutes/Town Board Minutes/2014-06-11
... request for the 2015 assessment update was filled out, signed and returned to the State and a copy ... of road will be widened with a mill and then filled with crushed stone and asphalt to build structure ... a 20% dividend NYS DOT – Special Use Permit approval – Memorial Day Parade May 30, 2014 ...
permit (1)
filled (2)
pubdocs
Public Documents/Minutes/Town Board Minutes/2020-07-08
... Inspections 35 Number of Building Permits Issued 11 Number of Building C.O / ... has been busy of late, building permits have picked up. He reported the ... illegal swimming pools the building permit requirements on them. 6. Planning ...
permits (2)
permit (1)
fill (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2019-07-10
... Appoint Derek Harnsberger to fill the Vacancy on the Town Board ... Board of the Town of Riga to fill the vacancy created by ... to Appoint Kim Okolowitcz to fill the Vacancy on the Planning ... the Town Planning Board to fill the vacancy created by Derek ...
permitted (1)
permits (2)
permit (1)
fill (4)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2021-05-03
... that there is a pond on site. • Mr. Sciarabba stated that when they filled out the application, they included the properties total holdings and there ... 36 across from Sanford Rd. Park. The owner of the parcel had received a permit for a driveway cut from NYSDOT. The Board also discussed how they would ...
permit (1)
filled (1)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2019-12-02
... the building was that it was approved for agricultural use only and a permit was never issued in relation to building codes. He said there was only one ... exactly sure where it was on the property, but it's a huge well that was filled with water, but now there was a dead cow in there from a previous owner. ...
permit (1)
filled (1)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2023-08-07
... Market) and a special use permit, issued in 2011 for a farm ... not part of the special use permit. Concerns of the sales being ... to the special use permit. Mr. Young is looking for ... farm was denied a building permit by Steve Mills, the prior ...
permits (1)
permit (11)
pubdocs
Public Documents/Minutes/Town Board Minutes/2019-01-02
... DEPARTMENT FEES A BUILDING PERMIT FEE MAY BE WAIVED FOR ANY ... DISASTER. Activity or Permit Residential Structures Basic ... Construction Fee $100 Plus permit fees Permit Renewal (additional 6-months) ...
permit (13)
filling permit (1)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2016-11-15
... they would then be able to fill it. Mr. Stenglein stated that ... would obtain a Nationwide Permit 29 to fill that area and a nationwide permit for wetlands smaller than ...
permit (9)
fill (2)
pubdocs
Public Documents/Minutes/Town Board Minutes/2016-05-11
... Inspections 20 Number of Building Permits Issued 36 Number of Building C.O / ... Site Plan, and Special Use Permit application procedures. It is ... (work is in progress) Mill edges, fill with crushed stone, True and Level, ...
filling (1)
permits (1)
permit (1)
fill (1)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2022-06-06
... stated that on the short EAF filled out by the applicant, it was found ... swale on the property that is filled with ten- to twelve-foot-tall ... that he was curious if a building permit application was made and that was ...
permit (2)
filled (2)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2020-08-03
... plans to the NYSDOT for a driveway permit on a state road.  Mr. ... that on the drawing, the grid fills up the wetlands and she was ... wetland does not constitute fill and therefore the Corps of Engineers ...
permit (2)
fill (1)
fills (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2018-06-13
... (NYSDOT) Permit 33c including: - The name of ... please refer to NYSDOT permit 33c And, 4. The Churchville ... The Supervisor will fill out the required permit paperwork to hold the parade. ...
permits (1)
permit (3)
fill (2)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2017-05-01
... would require a Special Use Permit or a Zoning Variance by the ... go along with the list of permitted uses. Mr. Juliano stated that ... applied for the building permit for that barn, the permit and the Certificate of ...
permitted (1)
permit (3)
fill (2)
pubdocs
Public Documents/Minutes/Town Board Minutes/2011-05-11
... 32 Number of Building Permits Issued 5 Number of Building ... currently utilizing on new permits to help code enforcement ... to better communicate with permit applicants. 6. Planning Mr. ... roadway with four foot mill, fill and compact milled areas, ...
permits (5)
permit (2)
fill (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2016-01-04
... Charges Actual costs FILLING AND EXCAVATING PERMIT Application Fee $150.00 ... costs BUILDING DEPARTMENT PERMITS FEE Swimming Pool and or Hot Tub Permits $30.00 above ground (as ...
filling (1)
permits (3)
permit (13)
fill (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2019-08-14
... Number of Inspections 40 Number of Building Permits Issued 9 Number of Building C.O / C.C Issued 6 ... for Monroe County. town of Wheatland milling and filling with binder, edges of Mumford Road, and the ... is being used as weather (rainfall) and time permits. Tines on groomer are ineffective when there is ...
filling (1)
permits (2)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2022-10-03
... because a building permit couldn't even be issued with ... backfilled by way of adding fill dirt and grading. He also ... the site plan to show the fill and grading and the proposed ... ago he had a special use permit to run a small machine shop ...
permits (1)
permit (3)
fill (3)
pubdocs
Public Documents/Minutes/Town Board Minutes/2022-03-09
... as Clerk to the Town Justice to fill the vacancy created by Susan ... Late Fee 4 $4.00 B2215B Building Permits 2 $100.00 B2115E Engineering Fees 1 ... Inspections 19 Number of Building Permits Issued 0 Number of Building C.O / ...
permits (3)
fill (1)
pubdocs
Public Documents/Minutes/Town Board Minutes/2015-05-13
... Inspections 18 Number of Building Permits Issued 3 Number of Building C.O / ... Still working on as weather permits- removal of snow plowing and salting ... on Monday, May 25 th . The parade permit is in place and the agreement with ...
permits (2)
permit (1)
filled (1)
pubdocs
Public Documents/Minutes/Planning Board Minutes/2019-08-05
... the project requires 1,720 cubic yards of clean fill. Mr. Stenglein asked if the fill would be stockpiled of if it would be delivered ... • Mr. Schultz stated that typically the fill is brought in and put in place as the house is ...
fill (3)