Search Results
... any application for a fill permit, shall apply to any fill permits issued under this Article: ... block, gravel, clean fill dirt and topsoil shall be ...
permit (3)
fill permits (1)
filled (1)
fill (3)
fill permit (1)
... or contractor shall be permitted use of a town filling area for disposal purposes, a valid permit shall be obtained from the ... of fees for issuance of a permit to any town resident or ...
filling (1)
permitted (1)
permit (6)
... of any kind on the premises designated as a town filling area in the Town of Riga. Use by other ... Board. Nonresident contractors may be granted a permit if materials being disposed of originate in the ...
filling (2)
permit (1)
... or of any conditions imposed in a permit issued by the Town Clerk or of the ... the Town Board regulating the town filling area shall subject the violator to a revocation of the permit and a denial to use any town ...
filling (1)
permit (3)
... L.L. No. 2-2015 ] Before any fill operation is commenced for ... the premises shall obtain a permit therefor from the Planning Board. The permit shall be applied for in ... of the area proposed to be filled and to what elevation the ...
permit (3)
filled (4)
fill (3)
... the premises shall obtain a permit therefor from the Town Board. ... of the application for each permit shall be submitted, together ... for which the excavation permit is requested and all ... the entire land for which a permit is proposed, showing the ...
permit (9)
fill (1)
... any application for a fill permit, the Planning Board shall ... Whether the proposed fill operation will be a nuisance ... The effect of the proposed fill operation on the orderly ...
permits (1)
fill (9)
fill permit (1)
... A floodplain development permit is hereby established for all ... valid floodplain development permit. Application for a permit shall be made on forms ... or proposed structures, fill, storage of materials, ...
permit (5)
fill (1)
... undertaken pursuant to any permit issued hereunder have been ... with the terms of such permit and all provisions of this Article, the permit may be renewed by the Town ... than that for which the permit was originally issued. At ...
permit (7)
Operating permits required. Operating permits shall be required for ... to obtain an operating permit prior to commencing such ... Applications for operating permits. An application for an ...
permits (7)
permit (15)
Building permits required. Except as otherwise ... of this section, a building permit shall be required for any ... work for which a building permit is required without first having obtained a building permit from the Code Enforcement ...
permits (9)
permit (29)
... in granting an excavation permit, shall apply to any permit issued under this Article: ... that the following shall be permitted in the setback area in ... with all conditions of the permit and any applicable town ...
permitted (2)
permit (7)
... additional information may be required on the permit application form: The proposed elevation, in ... flood elevation data shall be provided by the permit applicant for subdivision proposals and other ...
permit (3)
Permitted modifications. Individual sewage disposal systems (septic tanks) may be provided in lieu of ...
permitted (1)
The Town Board of the Town of Riga may, by resolution and New York State Department of Conservation approval, establish an official town filling area at such place or places as shall from time to time be determined.
filling (2)
[Amended 2-11-2015 by L.L. No. 2-2015 ] Permits shall be granted for a period of six months only. The applicant may apply for additional six-month permits pursuant to the procedures set forth in this ...
permits (2)
permit (1)
Any permit issued under this Article may be ... or any conditions imposed in the permit have not been complied with, and the bond executed by the holder of said permit and filed with the Town Clerk or the ...
permit (4)
... by L.L. No. 2-2015 ] Any permit issued hereunder may be revoked, ... or laws or any conditions of the permit have not been complied with, and the bond executed by the holder of said permit and filed with the Town Clerk, or ...
permit (4)
... owner shall first obtain a written permit signed by the Superintendent. The application for such permit shall be made on a form furnished by ... necessary by the Superintendent. A permit and inspection fee in the amount ...
permit (4)
Any excavation permit granted by the Town Board pursuant to this Article shall be effective for a period of up to three years and shall be subject to annual site inspection and review by the Town Engineer and/or any other agents designated by the Town Board.
permit (2)