Comprehensive Plans
- Consolidated Action Plans (HUD)
-
2017
- 2017 CDBG and HOME Annual Action Plan
-
2016
- 2015-2019 CDBG and HOME Plan
- Development Studies
-
2019
- WNY Regional Rail Project Feasibility Study Final Report
-
2018
- WNY Regional Rail Corridor Project Feasibility Study - Executive Summary
-
2017
- Chadakoin River West BOA Study (2017)
- Chadakoin River West BOA Study Appendices (2017)
-
2016
- Local Waterfront Revitalization Program (2016)
- Downtown Revitalization Initiative Application
- Analysis of Impediments to Fair Housing
-
2015
- AECOM Development Strategy (2015)
-
2014
- Chadakoin River Central East BOA Study (2014)
- Chadakoin River Central East BOA Study - Appendices (2014)
-
2012
- Jamestown Business Mix Study (2012)
-
2010
- Neighborhood Revitalization Plan (2010)
-
2008
- Streetscape Enhancement Plan (2008)
- Urban Design Plan
-
2019
- Urban Design Plan 2.0 (2019)
-
2006
- Urban Design Plan (2006) Volume 1
- Urban Design Plan (2006) Volume 2 - Guidelines
- Urban Design Plan Executive Summary
- No documents found matching your criteria.