Index: W
Waivers
ยงย 1-26—
Nonpayment and lien.
ยงย 155-16.02—
Standards for one-family cluster option.
ยงย 155-16.05—
Development standards and requirements.
ยงย 155-17.11—
Wireless communication towers and antennas; special use permit and exception to special use permit requirements.
ยงย 155-17.40—
Reasonable accommodation use.
ยงย 155-21.04—
General requirements for all signs.
ยงย 155-22.03—
Review procedures.
ยงย 155-24.04—
Zoning permit application and review procedures.
ยงย A159-15—
Hearing and determination of complaints; procedure; local office.
Walls
ยงย 14-1—
Keeping of animals limited.
ยงย 100-2—
Prohibited acts.
117-2A{3}—
BUILDING DRAIN
155-2.02A.{8}—
ALTERATION
155-2.02A.{18}—
BUFFER AREA
155-2.02A.{19}—
BUILDING
155-2.02B.{3}—
FENCE OR WALL, OBSCURING
155-2.02B.{4}—
FENCE OR WALL, ORNAMENTAL
155-2.02B.{5}—
FENCE/WALL
155-2.02B.{12}—
FLOOR AREA, GROSS
155-2.02B.{13}—
FLOOR AREA, MINIMUM (FOR A DWELLING UNIT)
155-2.02B.{14}—
FLOOR AREA, USABLE
155-2.02B.{21}—
GRADE
155-2.02C.{7}—
LOT COVERAGE
155-2.02D.{52}—
STRUCTURAL ALTERATION
155-2.02E.{3}—
USABLE FLOOR AREA
155-2.02E.{6}—
WALL
ยงย 155-5.04—
Required conditions.
ยงย 155-10.04—
Required conditions.
ยงย 155-13.02—
Permitted uses.
ยงย 155-15.01—
Schedule of regulations for uses permitted(a).
ยงย 155-16.05—
Development standards and requirements.
ยงย 155-17.07—
Automobile service station with minor vehicle repair.
ยงย 155-17.13—
Extraction operations.
ยงย 155-17.14—
Group day-care homes.
ยงย 155-17.16—
Junkyards.
ยงย 155-17.21—
Outdoor commercial recreation.
ยงย 155-17.32—
Outdoor sales space for new or used automobiles, recreational vehicles, mobile homes and boats.
ยงย 155-17.36—
Planned commercial center.
ยงย 155-17.41—
General hospital.
ยงย 155-18.11—
Projections into yards.
ยงย 155-18.12—
Yard exceptions.
ยงย 155-19.09—
Repairs and maintenance.
ยงย 155-20.03—
Required off-street loading.
155-21.02{9}—
MARQUEE SIGN
155-21.02{14}—
PROJECTING SIGN
155-21.02{22}—
WALL SIGN
ยงย 155-21.03—
Sign permits.
ยงย 155-21.04—
General requirements for all signs.
ยงย 155-21.06—
Permitted signs in all agricultural and residential districts.
ยงย 155-21.07—
Permitted signs in BOS and B-2 Districts.
ยงย 155-22.03—
Review procedures.
ยงย 155-22.06—
Changes to approved site plan.
ยงย 155-23.02—
Performance standards.
ยงย 155-23.03—
Fences and walls.
ยงย 155-23.05—
Flood hazard areas.
ยงย 155-23.09—
Private roads.
ยงย 155-24.02—
Zoning permit required.
ยงย 155-24.08—
Site inspections.
ยงย 155-31.06—
Performance bonds.
Water
Ch 53—
Fees
66-2{1}—
OUTDOOR FURNACE
ยงย 80-9—
Litter in public waters.
ยงย 100-2—
Prohibited acts.
ยงย 100-27—
Swimming.
ยงย 100-32—
Peddling and soliciting.
Ch 117—
Sewers
117-2A{9}—
INDUSTRIAL COST RECOVERY
117-2A{13}—
MAJOR CONTRIBUTING INDUSTRY
117-2A{14}—
NATURAL OUTLET
117-2A{20}—
PUBLIC SEWER
117-2A{23}—
STORM SEWER or STORM DRAIN
117-2A{24}—
SUSPENDED SOLIDS
117-2A{29}—
WASTEWATER
117-2A{32}—
WATERCOURSE
ยงย 117-3—
Use of public sewers required.
ยงย 117-7—
Wastewater billing and rates.
129-2{1}—
CURB AND GUTTER
Ch 148—
Water
148-1{1}—
DEPARTMENT
148-1{3}—
SYSTEM
148-1{4}—
WATER CONNECTION
148-1{5}—
WATER MAIN
Ch 148 Art II—
Municipal Water Works
ยงย 148-2—
Service connections to existing system.
ยงย 148-3—
Turning on and off water service.
ยงย 148-4—
Water meters required; interference with meters prohibited.
ยงย 148-5—
Nonmetered connections.
ยงย 148-6—
Access to meters.
ยงย 148-7—
Reimbursement for meter and valve damage.
ยงย 148-9—
Testing of meters.
ยงย 148-10—
Accuracy of meters.
ยงย 148-11—
Bill adjustment after meter test.
ยงย 148-13—
Water emergency orders.
ยงย 148-14—
Issuance of additional regulations.
ยงย 148-15—
Injury to facilities.
ยงย 148-16—
Fluoridation.
Ch 148 Art III—
Cross-Connections with Public Water Supply System
ยงย 148-17—
Term defined.
ยงย 148-18—
Adoption of state rules.
ยงย 148-19—
Inspections.
ยงย 148-20—
Discontinuation of service.
ยงย 148-21—
Signage.
Ch 148 Art IV—
Water Service Extensions
ยงย 148-23—
Connecting.
ยงย 148-24—
Payment of fee for survey and cost estimate.
ยงย 148-25—
Additional benefited property.
ยงย 148-26—
Permit required.
ยงย 148-29—
Review of plan.
ยงย 148-35—
Acceptance by Village.
Ch 148 Art V—
Water Billing and Rates
ยงย 148-37—
Dates of billing.
ยงย 148-38—
Billing rates for usage.
ยงย 148-39—
Past-due accounts.
ยงย 148-40—
Special billing procedures.
ยงย 148-42—
Penalty.
Ch 155—
Zoning
155-2.02A.{49}—
ESSENTIAL SERVICES
155-2.02B.{9}—
FLOOD INSURANCE STUDY
155-2.02B.{10}—
FLOOD or FLOODING
155-2.02B.{19}—
GASOLINE SERVICE STATION
155-2.02D.{16}—
PRIVATE WATER SUPPLY
155-2.02D.{20}—
PUBLIC UTILITY
ยงย 155-4.02—
Permitted uses.
ยงย 155-5.02—
Permitted uses.
ยงย 155-13.02—
Permitted uses.
ยงย 155-15.01—
Schedule of regulations for uses permitted(a).
ยงย 155-16.03—
Conditions and qualifications.
ยงย 155-16.04—
Permitted densities.
ยงย 155-16.05—
Development standards and requirements.
ยงย 155-16.11—
Modification to standards.
ยงย 155-17.03—
Approval standards.
ยงย 155-17.06—
Major automobile service and repair stations.
ยงย 155-17.13—
Extraction operations.
ยงย 155-17.16—
Junkyards.
ยงย 155-17.18—
Mini storage facilities.
ยงย 155-17.28—
Golf courses and country clubs.
ยงย 155-17.44—
Equipment sales and service.
ยงย 155-17.45—
Utility grid wind energy system, on-site wind energy system over 20 meters high, and anemometer towers over 20 meters high.
ยงย 155-20.05—
Parking space layout, standards, construction and maintenance.
ยงย 155-22.03—
Review procedures.
ยงย 155-22.04—
Site plan approval standards.
ยงย 155-23.05—
Flood hazard areas.
ยงย 155-23.08—
Landscape planting.
ยงย 155-23.09—
Private roads.
ยงย 155-24.04—
Zoning permit application and review procedures.
ยงย A159-8—
Construction of facilities; options afforded Village; underground facilities; construction standards.
ยงย DL-1—
Disposition of legislation.
Watercourses
Water supply
ยงย 148-2—
Service connections to existing system.
Ch 148 Art III—
Cross-Connections with Public Water Supply System
ยงย 148-17—
Term defined.
ยงย 148-18—
Adoption of state rules.
ยงย 148-19—
Inspections.
ยงย 148-20—
Discontinuation of service.
ยงย 148-21—
Signage.
ยงย 148-40—
Special billing procedures.
155-2.02D.{16}—
PRIVATE WATER SUPPLY
ยงย 155-13.02—
Permitted uses.
ยงย 155-15.01—
Schedule of regulations for uses permitted(a).
Weapons
Well
ยงย 148-7—
Reimbursement for meter and valve damage.
ยงย 148-23—
Connecting.
ยงย 155-2.01—
Construction of language.
155-2.02A.{30}—
CONDOMINIUM SUBDIVISION PLAN
155-2.02D.{16}—
PRIVATE WATER SUPPLY
155-2.02E.{8}—
WIND ENERGY SYSTEM
ยงย 155-17.06—
Major automobile service and repair stations.
ยงย 155-17.13—
Extraction operations.
ยงย 155-17.22—
Airports and landing strips.
ยงย 155-17.41—
General hospital.
ยงย 155-17.44—
Equipment sales and service.
ยงย 155-21.10—
Unsafe and damaged signs and sign maintenance.
ยงย 155-22.03—
Review procedures.
ยงย 155-22.04—
Site plan approval standards.
ยงย 155-24.04—
Zoning permit application and review procedures.
ยงย 155-24.09—
Public hearing notices.
ยงย 155-25.07—
Conditions for approval.
ยงย A159-7—
Franchise fees; reporting; records.
Wildlife
ยงย 100-18—
Park wildlife.
ยงย 100-19—
Firearms and other weapons.
ยงย 155-4.02—
Permitted uses.
ยงย 155-5.02—
Permitted uses.
ยงย 155-16.03—
Conditions and qualifications.
ยงย 155-17.13—
Extraction operations.
ยงย 155-17.45—
Utility grid wind energy system, on-site wind energy system over 20 meters high, and anemometer towers over 20 meters high.
Wind turbines