home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
note
Notes (1)
pubdocs
Public Documents
Public Documents
Agendas (281)
Budgets (44)
Master Plans (3)
Minutes (277)
Ordinances (96)
Resolutions (1482)
help_center
Help
Help
About Us
ecode
ecode
search
warning
Login
Township of Eagleswood, NJ
chevron_right
2023-11-27
info
chevron_right
Index: W
Filter By Letter
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
W
add
Waivers
ยงย 5-1 — Health benefit plan.
ยงย 17-10 — Public Defender; application fee.
ยงย 131-15 — Limited license for grading only.
ยงย 131-27 — Modification of license.
ยงย 145-3 — Duties and powers of Floodplain Administrator.
ยงย 145-5 — Site plans and construction documents.
ยงย 215-18 — Waiver.
ยงย 285-29 — Storm drainage within non-Pinelands regulated areas.
ยงย 285-44 — Waiver of strict compliance.
ยงย 285-48 — Contents of EIS.
ยงย 285-55 — EIS waiver.
ยงย 285-67 — Use of funds.
ยงย 295-34 — Site plan approval required.
ยงย 295-35 — Site plan approval procedure.
ยงย 295-63 — PA - Preservation Area Zone.
ยงย 295-71 — Supplemental design standards and management programs.
ยงย 295-72 — Waiver of strict compliance with article and Pinelands Comprehensive Management Plan.
ยงย 295-76 — Scope and purpose.
ยงย 295-83 — Requirements for site development stormwater plan.
ยงย 295-85 — Variances.
add
Walls
ยงย 72-16 — Proper care of animals required; abandonment prohibited.
ยงย 97-9 — Number specifications.
ยงย 145-1 — Scope and administration.
ยงย 145-5 — Site plans and construction documents.
145-9B{18} — BREAKAWAY WALL
145-9B{19} — BUILDING
145-9B{28} — ELEVATED BUILDING
145-9B{45} — HIGHEST ADJACENT GRADE
145-9B{69} — START OF CONSTRUCTION
145-9B{70} — STRUCTURE
145-9B{75} — V ZONE CERTIFICATE
ยงย 145-15 — Other development and building work.
ยงย 145-17 — Utility and Miscellaneous Group U.
215-1{2} — BUILDING DRAIN
ยงย 215-9 — Connection permits.
ยงย 285-18 — Detail required on preliminary plats.
285-29B{50} — WATER CONTROL STRUCTURE
ยงย 285-34 — Supplementary state specifications.
ยงย 295-12 — C-1 Marine Commercial District.
ยงย 295-13 — C-2 Highway Commercial District.
ยงย 295-14 — C-2/V Highway Commercial/Village.
ยงย 295-15 — C-3 Neighborhood Commercial District.
ยงย 295-16 — LB Limited Business.
ยงย 295-22 — Intersections.
ยงย 295-25 — Building height.
ยงย 295-34 — Site plan approval required.
295-50{1} — ACCESSORY BUILDING
295-50{9} — BUILDING
295-50{17} — DWELLING
295-50{61} — STRUCTURAL ALTERATION
295-50{62} — STRUCTURE
295-50{63} — WALL
Ch 295 Art X — Fences, Walls and Hedges
ยงย 295-59 — General requirements.
295-88{6} — OPEN FRONT PORCH
add
Water
ยงย 9-10 — Powers of Commission.
ยงย 9-11 — Acquisitions by Commission.
ยงย 72-16 — Proper care of animals required; abandonment prohibited.
ยงย 131-5 — Application requirements.
ยงย 131-15 — Limited license for grading only.
ยงย 131-19 — Prohibited activities.
ยงย 145-2 — Applicability.
ยงย 145-3 — Duties and powers of Floodplain Administrator.
ยงย 145-7 — Variances.
145-9B{3} — A ZONES
145-9B{7} — ALTERATION OF A WATERCOURSE
145-9B{13} — BASE FLOOD ELEVATION (BFE)
145-9B{25} — DEEP FOUNDATIONS
145-9B{32} — FLOOD HAZARD AREA DESIGN FLOOD ELEVATION
145-9B{34} — FLOOD INSURANCE STUDY (FIS)
145-9B{35} — FLOOD or FLOODING
145-9B{37} — FLOODPLAIN or FLOOD-PRONE AREA
145-9B{38} — FLOODPROOFING
145-9B{40} — FLOODWAY
145-9B{42} — FUNCTIONALLY DEPENDENT USE
145-9B{67} — SOLID WASTE DISPOSAL
145-9B{68} — SPECIAL FLOOD HAZARD AREA
145-9B{76} — V ZONES
145-9B{79} — WATER SURFACE ELEVATION
145-9B{80} — WATERCOURSE
ยงย 145-10 — Subdivisions and other developments.
ยงย 145-11 — Site improvement.
ยงย 145-12 — Manufactured homes.
ยงย 145-15 — Other development and building work.
ยงย 145-17 — Utility and Miscellaneous Group U.
ยงย 170-8 — Litter in bodies of water.
ยงย 176-6 — Requirements and standards for mobile home parks.
ยงย 176-7 — Utility hookup services.
207-1{6} — HABITABLE ROOM
ยงย 207-8 — Payment of taxes and charges required.
213-3{11} — PLOT PLAN
ยงย 213-5 — License to operate.
ยงย 213-6 — Standards for use of subsurface sewage disposal systems.
ยงย 213-9 — Enforcement.
215-1{4} — COMBINED SEWER
215-1{11} — pH
215-1{14} — SANITARY SEWER
215-1{15} — SEWAGE
215-1{18} — SLUDGE
215-1{19} — SUSPENDED SOLIDS
215-1{20} — UNPOLLUTED WATER
215-1{21} — WASTEWATER
215-1{23} — WASTEWATER TREATMENT WORKS
ยงย 215-3 — Prohibited discharges.
ยงย 215-4 — Limited discharges.
ยงย 215-5 — Control of discharges.
ยงย 215-7 — Methods of analysis and measurement.
ยงย 215-9 — Connection permits.
ยงย 215-10 — Floor drains.
ยงย 215-11 — Grease, oil and sand interceptors or traps.
ยงย 215-12 — Treatment of flow-equalizing facilities.
ยงย 218-4 — Requirements applicable to all solar energy systems.
ยงย 226-1 — Purpose.
226-3{5} — EROSION
226-3{7} — FARM CONSERVATION PLAN
226-3{11} — SEDIMENT
ยงย 226-8 — Design principles and requirements.
241-2B{2} — ILLICIT CONNECTION
241-2B{3} — INDUSTRIAL WASTE
241-2B{6} — NONCONTACT COOLING WATER
241-2B{8} — PROCESS WASTEWATER
241-2B{9} — STORMWATER
ยงย 241-3 — Prohibited conduct.
241-7B{3} — STORMWATER
ยงย 241-9 — Exceptions to prohibition.
241-13B{4} — WATERS OF THE STATE
ยงย 241-15 — Design standard.
ยงย 241-18 — Purpose.
241-19B{4} — STORMWATER
241-19B{5} — WATERS OF THE STATE
ยงย 245-1 — Permit required for excavations; emergencies; application.
ยงย 245-5 — Standards for work.
ยงย 263-2 — Findings.
ยงย 278-5 — Application for permit and conditions of permit.
285-3{8} — DRAINAGE RIGHT-OF-WAY
ยงย 285-16 — Required documents to be submitted with plat.
ยงย 285-17 — Submission procedure.
ยงย 285-18 — Detail required on preliminary plats.
ยงย 285-19 — Action by subdivider after plat approval.
ยงย 285-25 — Construction improvements required.
ยงย 285-29 — Storm drainage within non-Pinelands regulated areas.
285-29B{7} — COUNTY REVIEW AGENCY
285-29B{13} — DRAINAGE AREA
285-29B{17} — EROSION
285-29B{19} — HUC 14 or HYDROLOGIC UNIT CODE 14
285-29B{20} — IMPERVIOUS SURFACE
285-29B{21} — INFILTRATION
285-29B{31} — POLLUTANT
285-29B{32} — RECHARGE
285-29B{34} — REGULATED MOTOR VEHICLE SURFACE
285-29B{35} — SEDIMENT
285-29B{40} — STORMWATER
285-29B{41} — STORMWATER MANAGEMENT BMP
285-29B{45} — STORMWATER RUNOFF
285-29B{50} — WATER CONTROL STRUCTURE
285-29B{51} — WATERS OF THE STATE
285-29B{52} — WETLANDS or WETLAND
ยงย 285-34 — Supplementary state specifications.
ยงย 285-35 — Standard specifications.
285-39B{5} — SEASONAL HIGH-WATER TABLE
ยงย 285-42 — Application requirements.
ยงย 285-49 — Required information.
ยงย 285-50 — Assessment of environmental impact of project.
ยงย 285-51 — Environmental impact statement requirements.
ยงย 285-52 — Land Use Board review.
ยงย 285-55 — EIS waiver.
ยงย 295-1 — Purpose.
ยงย 295-16 — LB Limited Business.
ยงย 295-18 — R/R-OS Resort/Recreation-Open Space District.
ยงย 295-25 — Building height.
ยงย 295-35 — Site plan approval procedure.
295-50{19} — ESSENTIAL SERVICES
ยงย 295-59 — General requirements.
ยงย 295-61 — Definitions.
295-61B{9} — SEASONAL HIGH-WATER TABLE
ยงย 295-63 — PA - Preservation Area Zone.
ยงย 295-64 — FA - Forest Area Zone.
ยงย 295-66 — General regulations for Pinelands Area.
ยงย 295-68 — Application requirements for development.
ยงย 295-71 — Supplemental design standards and management programs.
ยงย 295-76 — Scope and purpose.
295-77{3} — COUNTY REVIEW AGENCY
295-77{5} — DEVELOPMENT
295-77{7} — DRAINAGE AREA
295-77{9} — EROSION
295-77{12} — HUC-11 or HYDROLOGIC UNIT CODE 11
295-77{13} — HUC 14 or HYDROLOGIC UNIT CODE 14
295-77{15} — INFILTRATION
295-77{22} — PERMEABILITY
295-77{24} — POLLUTANT
295-77{25} — RECHARGE
295-77{26} — REGULATED MOTOR VEHICLE SURFACE
295-77{27} — SEASONAL HIGH WATER TABLE
295-77{28} — SEDIMENT
295-77{32} — STORMWATER
295-77{33} — STORMWATER MANAGEMENT BMP
295-77{35} — STORMWATER RUNOFF
295-77{36} — WATERS OF THE STATE
295-77{38} — WETLANDS or WETLAND
ยงย 295-78 — Stormwater management requirements.
ยงย 295-79 — Calculation of stormwater runoff and groundwater recharge.
ยงย 295-80 — Sources for technical guidance.
ยงย 295-81 — Solids and floatable materials control standards.
ยงย 295-82 — Safety standards for stormwater management basins.
ยงย 295-83 — Requirements for site development stormwater plan.
ยงย 295-85 — Variances.
add
Watercourses
ยงย 131-19 — Prohibited activities.
ยงย 145-2 — Applicability.
ยงย 145-3 — Duties and powers of Floodplain Administrator.
ยงย 145-5 — Site plans and construction documents.
145-9B{7} — ALTERATION OF A WATERCOURSE
145-9B{40} — FLOODWAY
145-9B{80} — WATERCOURSE
ยงย 145-15 — Other development and building work.
285-3{8} — DRAINAGE RIGHT-OF-WAY
ยงย 285-13 — Plat details.
ยงย 285-18 — Detail required on preliminary plats.
ยงย 285-22 — Detail required on final plat.
ยงย 285-29 — Storm drainage within non-Pinelands regulated areas.
ยงย 285-30 — Easements.
ยงย 285-31 — Public sites and recreational facilities.
ยงย 285-32 — Preservation of natural resources.
ยงย 285-52 — Land Use Board review.
ยงย 295-35 — Site plan approval procedure.
ยงย 295-78 — Stormwater management requirements.
ยงย 295-85 — Variances.
add
Water pollution
215-1{23} — WASTEWATER TREATMENT WORKS
ยงย 285-55 — EIS waiver.
add
Water supply
ยงย 176-7 — Utility hookup services.
213-3{11} — PLOT PLAN
ยงย 218-4 — Requirements applicable to all solar energy systems.
ยงย 285-16 — Required documents to be submitted with plat.
ยงย 285-17 — Submission procedure.
ยงย 285-25 — Construction improvements required.
ยงย 285-35 — Standard specifications.
ยงย 285-50 — Assessment of environmental impact of project.
ยงย 285-51 — Environmental impact statement requirements.
ยงย 285-52 — Land Use Board review.
add
Weapons
ยงย 251-9 — Investigation of applicants; denials; appeals.
add
Web sites
ยงย 285-29 — Storm drainage within non-Pinelands regulated areas.
ยงย 295-78 — Stormwater management requirements.
ยงย 295-79 — Calculation of stormwater runoff and groundwater recharge.
ยงย 295-80 — Sources for technical guidance.
add
Well
ยงย 37-70 — Duties and responsibilities.
ยงย 42-1 — Policy and Procedures Manual.
ยงย 64-16 — Violations and penalties.
ยงย 131-2 — Annual status report.
ยงย 131-5 — Application requirements.
ยงย 131-18 — Conditions for issuance of license for topsoil removal.
ยงย 145-3 — Duties and powers of Floodplain Administrator.
145-9B{34} — FLOOD INSURANCE STUDY (FIS)
213-3{11} — PLOT PLAN
ยงย 213-5 — License to operate.
ยงย 213-6 — Standards for use of subsurface sewage disposal systems.
ยงย 231-4 — Enforcement.
ยงย 231-8 — Source separation; exemption from source-separation requirements.
ยงย 251-21 — Issuance of limousine owner's license; contents of license; display of license.
ยงย 263-8 — Standards for removal.
ยงย 285-13 — Plat details.
ยงย 285-16 — Required documents to be submitted with plat.
ยงย 285-17 — Submission procedure.
ยงย 285-18 — Detail required on preliminary plats.
ยงย 285-29 — Storm drainage within non-Pinelands regulated areas.
285-29B{23} — MAJOR DEVELOPMENT
ยงย 285-30 — Easements.
ยงย 285-50 — Assessment of environmental impact of project.
ยงย 285-55 — EIS waiver.
ยงย 295-16 — LB Limited Business.
ยงย 295-28 — Environmental considerations.
ยงย 295-34 — Site plan approval required.
ยงย 295-56 — Enforcement.
ยงย 295-71 — Supplemental design standards and management programs.
ยงย 295-78 — Stormwater management requirements.
ยงย 295-84 — Maintenance and repair.
ยงย 295-85 — Variances.
ยงย 295-87 — Findings and declarations.
ยงย 295-90 — Parking requirements.
add
Wellhead protection
285-29B{16} — ENVIRONMENTALLY CRITICAL AREA
295-77{8} — ENVIRONMENTALLY CRITICAL AREA
add
Wells
ยงย 37-70 — Duties and responsibilities.
ยงย 42-1 — Policy and Procedures Manual.
ยงย 64-16 — Violations and penalties.
ยงย 131-2 — Annual status report.
ยงย 131-5 — Application requirements.
ยงย 131-18 — Conditions for issuance of license for topsoil removal.
ยงย 145-3 — Duties and powers of Floodplain Administrator.
145-9B{34} — FLOOD INSURANCE STUDY (FIS)
213-3{11} — PLOT PLAN
ยงย 213-5 — License to operate.
ยงย 213-6 — Standards for use of subsurface sewage disposal systems.
ยงย 231-4 — Enforcement.
ยงย 231-8 — Source separation; exemption from source-separation requirements.
ยงย 251-21 — Issuance of limousine owner's license; contents of license; display of license.
ยงย 263-8 — Standards for removal.
ยงย 285-13 — Plat details.
ยงย 285-16 — Required documents to be submitted with plat.
ยงย 285-17 — Submission procedure.
ยงย 285-18 — Detail required on preliminary plats.
ยงย 285-29 — Storm drainage within non-Pinelands regulated areas.
285-29B{23} — MAJOR DEVELOPMENT
ยงย 285-30 — Easements.
ยงย 285-50 — Assessment of environmental impact of project.
ยงย 285-55 — EIS waiver.
ยงย 295-16 — LB Limited Business.
ยงย 295-28 — Environmental considerations.
ยงย 295-34 — Site plan approval required.
ยงย 295-56 — Enforcement.
ยงย 295-71 — Supplemental design standards and management programs.
ยงย 295-78 — Stormwater management requirements.
ยงย 295-84 — Maintenance and repair.
ยงย 295-85 — Variances.
ยงย 295-87 — Findings and declarations.
ยงย 295-90 — Parking requirements.
add
Wildlife
Ch 72 Art III — Wildlife Feeding
ยงย 72-26 — Purpose.
72-27{1} — FEED
72-27{3} — WILDLIFE
ยงย 72-28 — Prohibited conduct.
ยงย 218-4 — Requirements applicable to all solar energy systems.
ยงย 285-39 — Definitions.
ยงย 285-49 — Required information.
ยงย 285-50 — Assessment of environmental impact of project.
ยงย 295-6 — RC Residential Conservation District.
ยงย 295-61 — Definitions.
ยงย 295-63 — PA - Preservation Area Zone.
ยงย 295-64 — FA - Forest Area Zone.
ยงย 295-66 — General regulations for Pinelands Area.
ยงย 295-71 — Supplemental design standards and management programs.
add
Wildlife feeding
Ch 72 Art III — Wildlife Feeding
72-27{1} — FEED